Raw Materials

Although most components essential to the Company’s business are generally available from multiple sources, certain key components including but not limited to microprocessors, enclosures, certain liquid crystal displays (“LCDs”), certain optical drives, and application-specific integrated circuits (“ASICs”) are currently obtained by the Company from single or limited sources, which subjects the Company to significant supply and pricing risks. Many of these and other key components available from multiple sources including but not limited to NAND flash memory, dynamic random access memory (“DRAM”), and certain LCDs, are subject at times to industry-wide shortages and significant commodity pricing fluctuations. In addition, the Company has entered into certain agreements for the supply of key components including but not limited to microprocessors, NAND flash memory, DRAM and LCDs at favorable pricing, but there is no guarantee the Company will be able to extend or renew these agreements on similar favorable terms, or at all, upon expiration or otherwise obtain favorable pricing in the future. Therefore, the Company remains subject to significant risks of supply shortages and price increases that can materially adversely affect its financial condition and operating results.

The Company and other participants in the personal computer, mobile communication and consumer electronics industries also compete for various components with other industries that have experienced increased demand for their products. In addition, the Company uses some custom components that are not common to the rest of the personal computer, mobile communication and consumer electronics industries, and new products introduced by the Company often utilize custom components available from only one source until the Company has evaluated whether there is a need for, and subsequently qualifies, additional suppliers. When a component or product uses new technologies, initial capacity constraints may exist until the suppliers’ yields have matured or manufacturing capacity has increased. If the Company’s supply of a key single-sourced component for a new or existing product were delayed or constrained, if such components were available only at significantly higher prices, or if a key manufacturing vendor delayed shipments of completed products to the Company, the Company’s financial condition and operating results could be materially adversely affected. The Company’s business and financial performance could also be adversely affected depending on the time required to obtain sufficient quantities from the original source, or to identify and obtain sufficient quantities from an alternative source. Continued availability of these components at acceptable prices, or at all, may be affected if those suppliers decided to concentrate on the production of common components instead of components customized to meet the Company’s requirements.

Significant portions of the Company’s Mac computers, iPhones, iPods, logic boards and other assembled products are manufactured by outsourcing partners, primarily in various parts of Asia. A significant concentration of this outsourced manufacturing is currently performed by only a few of the Company’s outsourcing partners, often in single locations. Certain of these outsourcing partners are the sole-sourced suppliers of components and manufacturing outsourcing for many of the Company’s key products, including but not limited to final assembly of substantially all of the Company’s portable Mac computers, iPhones, iPods and most of the Company’s desktop products. Although the Company works closely with its outsourcing partners on manufacturing schedules, the Company’s operating results could be adversely affected if its outsourcing partners were unable to meet their production commitments. The Company’s purchase commitments typically cover the Company’s requirements for periods ranging from 30 to 150 days.

The Company believes there are several component suppliers and manufacturing vendors whose loss to the Company if they were to encounter financial distress or become insolvent, incur capacity or supply constraints, become unable to obtain credit, or for any other reason could materially adversely affect the Company’s business and financial condition. At this time, such vendors include, without limitation, 3M Co., Advanced Micro Devices Inc., AKM Semiconductor Inc., Amkor Technology Inc., Analog Devices Inc., Aptina Imaging Corp., ARM Holdings PLC., Atheros Communications Inc., Atmel Corp., AU Optronics Corp., Avago Technologies Ltd.,

 

10


Table of Contents

Broadcom Corp., Cirrus Logic Inc., Corning Inc., Cypress Semiconductor Corp., Dover Corp., Flextronics Inc., Foxconn Technology Co. Ltd., Hon Hai Precision Industry Co. Ltd., Imagination Technologies Group PLC., Infineon Technologies AG, Intel Corp., Inventec Appliances Corp., LG Display Co. Ltd., Linear Technology Corp., MagnaChip Semiconductor Corp., Maxim Integrated Products Inc., Mitsumi Electric Co. Ltd., Murata Mfg. Co. Ltd., National Semiconductor Corp., Nichia Corp., NVIDIA Corp., NXP B.V., OmniVision Technologies Inc., Quanta Computer, Inc., Pegatron Corp., Philips Lumileds Lighting Co., Renesas Semiconductor Co. Ltd., RF Micro Devices Inc., ROHM Co. Ltd., Samsung Electronics Co. Ltd., Skyworks Solutions Inc., STMicroelectronics NV, Sumitomo Chemical Co. Ltd., Texas Instruments Inc., Toshiba Corp., Toyoda Gosei Co. Ltd., and TriQuint Semiconductor Inc.

This excerpt taken from the AAPL 10-K filed Nov 5, 2008.

Raw Materials

Although most components essential to the Company’s business are generally available from multiple sources, certain key components including, but not limited to microprocessors, enclosures, certain LCDs, certain optical drives, and application-specific integrated circuits (“ASICs”) are currently obtained by the Company from single or limited sources, which subjects the Company to significant supply and pricing risks. Many of these and other key components that are available from multiple sources including, but not limited to NAND flash memory, dynamic random access memory (“DRAM”), and certain LCDs, are subject at times to industry-wide shortages and significant commodity pricing fluctuations. In addition, the Company has entered into certain agreements for

 

9


Table of Contents

the supply of key components including, but not limited to microprocessors, NAND flash memory, DRAM and LCDs at favorable pricing, but there is no guarantee that the Company will be able to extend or renew these agreements on similar favorable terms, or at all, upon expiration or otherwise obtain favorable pricing in the future. Therefore, the Company remains subject to significant risks of supply shortages and/or price increases that can have a material adverse effect on its financial condition and operating results.

The Company and other participants in the personal computer, consumer electronics and mobile communication industries also compete for various components with other industries that have experienced increased demand for their products. In addition, the Company uses some custom components that are not common to the rest of the personal computer, consumer electronics and mobile communication industries, and new products introduced by the Company often utilize custom components available from only one source until the Company has evaluated whether there is a need for, and subsequently qualifies, additional suppliers. When a component or product uses new technologies, initial capacity constraints may exist until the suppliers’ yields have matured. If the Company’s supply of a key single-sourced component for a new or existing product were delayed or constrained, if such components were available only at significantly higher prices, or if a key manufacturing vendor delayed shipments of completed products to the Company, the Company’s financial condition and operating results could be materially adversely affected. The Company’s business and financial performance could also be adversely affected depending on the time required to obtain sufficient quantities from the original source, or to identify and obtain sufficient quantities from an alternative source. Continued availability of these components at acceptable prices, or at all, may be affected if those suppliers decided to concentrate on the production of common components instead of components customized to meet the Company’s requirements.

Significant portions of the Company’s Mac computers, iPods, iPhones, logic boards, and other assembled products are manufactured by outsourcing partners, primarily in various parts of Asia. A significant concentration of this outsourced manufacturing is currently performed by only a few of the Company’s outsourcing partners, often in single locations. Certain of these outsourcing partners are the sole-sourced suppliers of components and manufacturing outsourcing for many of the Company’s key products, including but not limited to final assembly of substantially all of the Company’s portable Mac computers, iPods, iPhones and most of the Company’s iMacs. Although the Company works closely with its outsourcing partners on manufacturing schedules, the Company’s operating results could be adversely affected if its outsourcing partners were unable to meet their production commitments. The Company’s purchase commitments typically cover its requirements for periods ranging from 30 to 150 days.

The Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company’s business and financial condition. At this time, such vendors include, without limitation, Amperex Technology Limited, ASUSTeK Corporation, ATI Technologies, Inc., Atheros Communications Inc., AU Optronics Corporation, Broadcom Corporation, Chi Mei Optoelectronics Corporation, Cypress Semiconductor Corporation, Hitachi Global Storage Technologies, Hon Hai Precision Industry Co., Ltd., Infineon Technologies AG, Intel Corporation, Inventec Appliances Corporation, LG Display, LSI Corporation, Matsushita, Murata Manufacturing Co., Ltd., National Semiconductor Corporation, NVIDIA Corp., Inc., Quanta Computer, Inc., Renesas Semiconductor Co. Ltd., Samsung Electronics, Sony Corporation, Synaptics, Inc., Texas Instruments, and Toshiba Corporation.

These excerpts taken from the AAPL 10-K filed Nov 15, 2007.

Raw Materials

Although most components essential to the Company's business are generally available from multiple sources, certain key components including, but not limited to, microprocessors, enclosures, certain LCDs, certain optical drives, and application-specific integrated circuits ("ASICs") are currently obtained by the Company from single or limited sources. Some key components, while currently available to the Company from multiple sources, are at times subject to industry-wide availability constraints and pricing pressures. In addition, the Company uses some components uncommon to the rest of the personal computer, consumer electronics and mobile communication industries, and new products introduced by the Company often initially utilize custom components obtained from only one source until the Company has evaluated whether there is a need for, and subsequently qualifies, additional suppliers. If the supply of a key or single-sourced component to the Company were to be delayed or curtailed or in the event a key manufacturing vendor delayed shipment of completed products to the Company, the Company's ability to ship related products in desired quantities and in a timely manner could be adversely affected. The Company's business and financial performance could also be adversely affected depending on the time required to obtain sufficient quantities from the original source, or to identify and obtain sufficient quantities from an alternative source. Continued availability of these components may be affected if suppliers were to decide to concentrate on the production of common components instead of components customized to meet the Company's requirements. The Company attempts to mitigate these potential risks by working closely with these and other key suppliers on product introduction plans, strategic inventories, coordinated product introductions, and internal and external manufacturing schedules and levels. Consistent with industry practice, the Company acquires components through a combination of formal purchase orders, supplier contracts, and open orders based on projected demand information. The Company's purchase commitments typically cover its requirements for periods ranging from 30 to 150 days.

The Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company's business and financial condition. At this time, such vendors include Agere Systems, Inc., Ambit Microsystems Corporation, Amperex Technology Limited, ASUSTeK Corporation, ATI Technologies, Inc., Atheros Communications Inc., AU Optronics Corporation, Broadcom Corporation, Chi Mei Optoelectronics Corporation, Cypress Semiconductor Corporation, Hitachi Global Storage Technologies, Hon Hai Precision Industry Co., Ltd., Infineon Technologies AG, Intel Corporation, Inventec Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, Murata Manufacturing Co., Ltd., National Semiconductor Corporation, NVIDIA Corp., Inc., Quanta Computer, Inc., Renesas Semiconductor Co. Ltd., Samsung Electronics, Sony Corporation, Synaptics, Inc., Texas Instruments, and Toshiba Corporation. Certain of these vendors are the sole-sourced supplier of components and manufacturing outsourcing for many of the Company's key products, including but not limited to, assembly of most of the Company's portable Mac computers, iPods, and iPhones.

Raw Materials



Although most components essential to the Company's business are generally available from multiple sources, certain key components including, but not limited to,
microprocessors, enclosures, certain LCDs, certain optical drives, and application-specific integrated circuits ("ASICs") are currently obtained by the Company from single or limited sources. Some key
components, while currently available to the Company from multiple sources, are at times subject to industry-wide availability constraints and pricing pressures. In addition, the Company
uses some components uncommon to the rest of the personal computer, consumer electronics and mobile communication industries, and new products introduced by the Company often initially utilize custom
components obtained from only one source until the Company has evaluated whether there is a need for, and subsequently qualifies, additional suppliers. If the supply of a key or single-sourced
component to the Company were to be delayed or curtailed or in the event a key manufacturing vendor delayed shipment of completed products to the Company, the Company's ability to ship related
products in desired
quantities and in a timely manner could be adversely affected. The Company's business and financial performance could also be adversely affected depending on the time required to obtain sufficient
quantities from the original source, or to identify and obtain sufficient quantities from an alternative source. Continued availability of these components may be affected if suppliers were to decide
to concentrate on the production of common components instead of components customized to meet the Company's requirements. The Company attempts to mitigate these potential risks by working closely
with these and other key suppliers on product introduction plans, strategic inventories, coordinated product introductions, and internal and external manufacturing schedules and levels. Consistent
with industry practice, the Company acquires components through a combination of formal purchase orders, supplier contracts, and open orders based on projected demand information. The Company's
purchase commitments typically cover its requirements for periods ranging from 30 to 150 days.



The
Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company's business and financial condition.
At this time, such vendors include Agere Systems, Inc., Ambit Microsystems Corporation, Amperex Technology Limited, ASUSTeK Corporation, ATI Technologies, Inc., Atheros
Communications Inc., AU Optronics Corporation, Broadcom Corporation, Chi Mei Optoelectronics Corporation, Cypress Semiconductor Corporation, Hitachi Global Storage Technologies, Hon Hai
Precision Industry Co., Ltd., Infineon Technologies AG, Intel Corporation, Inventec Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, Murata Manufacturing Co., Ltd.,
National Semiconductor Corporation, NVIDIA Corp., Inc., Quanta Computer, Inc., Renesas Semiconductor Co. Ltd., Samsung Electronics, Sony Corporation, Synaptics, Inc., Texas
Instruments, and Toshiba Corporation. Certain of these vendors are the sole-sourced supplier of components and manufacturing outsourcing for many of the Company's key products, including
but not limited to, assembly of most of the Company's portable Mac computers, iPods, and iPhones.



These excerpts taken from the AAPL 10-K filed Dec 29, 2006.

Raw Materials

Although most components essential to the Company’s business are generally available from multiple sources, certain key components including microprocessors and application-specific integrated circuits (“ASICs”) are currently obtained by the Company from single or limited sources. Some key components, while currently available to the Company from multiple sources, are at times subject to industry-wide availability constraints and pricing pressures. In addition, the Company uses some components uncommon to the rest of the personal computer and consumer electronics industries, and new products introduced by

17




the Company often initially utilize custom components obtained from only one source until the Company has evaluated whether there is a need for, and subsequently qualifies, additional suppliers. If the supply of a key or single-sourced component to the Company were to be delayed or curtailed or in the event a key manufacturing vendor delays shipments of completed products to the Company, the Company’s ability to ship related products in desired quantities and in a timely manner could be adversely affected. The Company’s business and financial performance could also be adversely affected depending on the time required to obtain sufficient quantities from the original source, or to identify and obtain sufficient quantities from an alternative source. Continued availability of these components may be affected if producers were to decide to concentrate on the production of common components instead of components customized to meet the Company’s requirements. The Company attempts to mitigate these potential risks by working closely with these and other key suppliers on product introduction plans, strategic inventories, coordinated product introductions, and internal and external manufacturing schedules and levels. Consistent with industry practice, the Company acquires components through a combination of formal purchase orders, supplier contracts, and open orders based on projected demand information. The Company’s purchase commitments typically cover its requirements for periods ranging from 30 to 150 days.

The Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company’s business and financial position. At this time, such vendors include Agere Systems, Inc., Ambit Microsystems Corporation, Amperex Technology Limited, ASUSTeK Corporation, ATI Technologies, Inc., Atheros Communications Inc., AU Optronics Corporation, Broadcom Corporation, Chi Mei Optoelectronics Corporation, Cypress Semiconductor Corporation, Hitachi Global Storage Technologies, Hon Hai Precision Industry Co., Ltd., Intel Corporation, Inventec Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, NVIDIA Corp., PortalPlayer, Inc., Quanta Computer, Inc., Renesas Semiconductor Co. Ltd., Samsung Electronics, Sony Corporation, Synaptics, Inc., Texas Instruments, and Toshiba Corporation.

Raw Materials



Although most components essential to the Company’s
business are generally available from multiple sources, certain key components
including microprocessors and application-specific integrated circuits (“ASICs”)
are currently obtained by the Company from single or limited sources. Some key
components, while currently available to the Company from multiple sources, are
at times subject to industry-wide availability constraints and pricing
pressures. In addition, the Company uses some components uncommon to the rest
of the personal computer and consumer electronics industries, and new products
introduced by




17










the Company often initially utilize custom components
obtained from only one source until the Company has evaluated whether there is
a need for, and subsequently qualifies, additional suppliers. If the supply of
a key or single-sourced component to the Company were to be delayed or
curtailed or in the event a key manufacturing vendor delays shipments of
completed products to the Company, the Company’s ability to ship related
products in desired quantities and in a timely manner could be adversely
affected. The Company’s business and financial performance could also be
adversely affected depending on the time required to obtain sufficient
quantities from the original source, or to identify and obtain sufficient
quantities from an alternative source. Continued availability of these
components may be affected if producers were to decide to concentrate on the
production of common components instead of components customized to meet the
Company’s requirements. The Company attempts to mitigate these potential risks
by working closely with these and other key suppliers on product introduction
plans, strategic inventories, coordinated product introductions, and internal
and external manufacturing schedules and levels. Consistent with industry
practice, the Company acquires components through a combination of formal
purchase orders, supplier contracts, and open orders based on projected demand
information. The Company’s purchase commitments typically cover its requirements for periods ranging from 30 to 150
days.



The Company believes there
are several component suppliers and manufacturing vendors whose loss to the
Company could have a material adverse effect upon the Company’s business and
financial position. At this time, such vendors include Agere Systems, Inc.,
Ambit Microsystems Corporation, Amperex Technology Limited, ASUSTeK
Corporation, ATI Technologies, Inc., Atheros Communications Inc., AU
Optronics Corporation, Broadcom Corporation, Chi Mei Optoelectronics
Corporation, Cypress Semiconductor Corporation, Hitachi Global Storage
Technologies, Hon Hai Precision Industry Co., Ltd., Intel Corporation, Inventec
Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, NVIDIA Corp.,
PortalPlayer, Inc., Quanta Computer, Inc., Renesas Semiconductor Co.
Ltd., Samsung Electronics, Sony Corporation, Synaptics, Inc., Texas
Instruments, and Toshiba Corporation.



These excerpts taken from the AAPL 10-K filed Dec 1, 2005.
Raw Materials

Although most components essential to the Company’s business are generally available from multiple sources, certain key components (including microprocessors and application-specific integrated circuits (“ASICs”)) are currently obtained by the Company from single or limited sources. Some other key components, while currently available to the Company from multiple sources, are at times subject to industry-wide availability constraints and pricing pressures. In addition, the Company uses some components that are not common to the rest of the personal computer and consumer electronics industries, and new products introduced by the Company often initially utilize custom components

13




obtained from only one source until the Company has evaluated whether there is a need for, and subsequently qualifies, additional suppliers. If the supply of a key or single-sourced component to the Company were to be delayed or curtailed or in the event a key manufacturing vendor delays shipments of completed products to the Company, the Company’s ability to ship related products in desired quantities and in a timely manner could be adversely affected. The Company did experience such delays during 2004 and 2005 related to PowerPC G5 processors, which resulted in the constrained availability of certain products. The Company’s business and financial performance could also be adversely affected depending on the time required to obtain sufficient quantities from the original source, or to identify and obtain sufficient quantities from an alternative source. Continued availability of these components may be affected if producers were to decide to concentrate on the production of common components instead of components customized to meet the Company’s requirements. In June 2005, the Company announced its intention to transition its Macintosh computers using the PowerPC G5 and G4 microprocessors, which are currently single-sourced, to Intel microprocessors by the end of calendar year 2007. The announcement of this transition may impact the continued availability on acceptable terms of certain components and services, including PowerPC G5 and G4 microprocessors. The Company attempts to mitigate these potential risks by working closely with these and other key suppliers on product introduction plans, strategic inventories, coordinated product introductions, and internal and external manufacturing schedules and levels. Consistent with industry practice, the Company acquires components through a combination of formal purchase orders, supplier contracts, and open orders based on projected demand information. The Company’s purchase commitments typically cover its requirements for periods ranging from 30 to 150 days.

The Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company’s business and financial position. At this time, such vendors include Agere Systems, Inc., Ambit Microsystems Corporation, ASUSTeK Corporation, ATI Technologies, Inc., Broadcom Corporation, Cypress Semiconductor Corporation, Freescale Semiconductor, Inc., Hitachi Global Storage Technologies, Hon Hai Precision Industry Co., Ltd., IBM Corporation, Intel Corporation, International Display Technology, Inventec Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, Mitsubishi Electric Corporation, NVIDIA Corp., PortalPlayer, Inc., Quanta Computer, Inc., Samsung Electronics, Synaptics, Inc., and Toshiba Corporation.

Raw Materials



Although most components essential to the Company’s
business are generally available from multiple sources, certain key components
(including microprocessors and application-specific integrated circuits (“ASICs”))
are currently obtained by the Company from single or limited sources. Some
other key components, while currently available to the Company from multiple
sources, are at times subject to industry-wide availability constraints and
pricing pressures. In addition, the Company uses some components that are not
common to the rest of the personal computer and consumer electronics
industries, and new products introduced by the Company often initially utilize
custom components




13










obtained from only one source until the Company has
evaluated whether there is a need for, and subsequently qualifies, additional
suppliers. If the supply of a key or single-sourced component to the
Company were to be delayed or curtailed or in the event a key manufacturing
vendor delays shipments of completed products to the Company, the Company’s
ability to ship related products in desired quantities and in a timely manner
could be adversely affected. The Company did experience such delays during 2004
and 2005 related to PowerPC G5 processors, which resulted in the constrained
availability of certain products. The Company’s business and financial
performance could also be adversely affected depending on the time required to
obtain sufficient quantities from the original source, or to identify and
obtain sufficient quantities from an alternative source. Continued availability
of these components may be affected if producers were to decide to concentrate
on the production of common components instead of components customized to meet
the Company’s requirements. In June 2005, the Company announced its
intention to transition its Macintosh computers using the PowerPC G5 and G4
microprocessors, which are currently single-sourced, to Intel microprocessors
by the end of calendar year 2007. The announcement of this transition may
impact the continued availability on acceptable terms of certain components and
services, including PowerPC G5 and G4 microprocessors. The Company attempts to
mitigate these potential risks by working closely with these and other key
suppliers on product introduction plans, strategic inventories, coordinated product
introductions, and internal and external manufacturing schedules and levels.
Consistent with industry practice, the Company acquires components through a
combination of formal purchase orders, supplier contracts, and open orders
based on projected demand information. The Company’s purchase commitments typically cover its requirements for periods
ranging from 30 to 150 days.



The Company believes there
are several component suppliers and manufacturing vendors whose loss to the
Company could have a material adverse effect upon the Company’s business and
financial position. At this time, such vendors include Agere Systems, Inc.,
Ambit Microsystems Corporation, ASUSTeK Corporation, ATI Technologies, Inc.,
Broadcom Corporation, Cypress Semiconductor Corporation, Freescale
Semiconductor, Inc., Hitachi Global Storage Technologies, Hon Hai
Precision Industry Co., Ltd., IBM Corporation, Intel Corporation, International
Display Technology, Inventec Appliances Corporation, LG. Phillips Co., Ltd.,
Matsushita, Mitsubishi Electric Corporation, NVIDIA Corp., PortalPlayer, Inc.,
Quanta Computer, Inc., Samsung Electronics, Synaptics, Inc., and
Toshiba Corporation.



These excerpts taken from the AAPL 10-K filed Dec 3, 2004.

Raw Materials

Although most components essential to the Company's business are generally available from multiple sources, certain key components (including microprocessors and application-specific integrated circuits ("ASICs")) are currently obtained by the Company from single or limited sources. Some other key components, while currently available to the Company from multiple sources, are at times subject to industry wide availability constraints and pricing pressures. In addition, the Company uses some components that are not common to the rest of the personal computer and consumer electronics industries, and new products introduced by the Company often initially utilize custom components obtained from only one source until the Company has evaluated whether there is a need for, and subsequently qualifies, additional suppliers. If the supply of a key or single-sourced component to the Company were to be delayed or curtailed or in the event a key manufacturing vendor delays shipments of completed products to the Company, the Company's ability to ship related products in desired quantities and in a timely manner could be adversely affected. The Company did experience such delays during fiscal 2004, which resulted in the constrained availability of certain products. The Company's business and financial performance could also be adversely affected depending on the time required to obtain sufficient quantities from the original source, or to identify and obtain sufficient quantities from an alternative source. Continued availability of these components may be affected if producers were to decide to concentrate on the production of common components instead of components customized to meet the Company's requirements. The Company attempts to mitigate these potential risks by working closely with these and other key suppliers on product introduction plans, strategic inventories, coordinated product introductions, and internal and external manufacturing schedules and levels. Consistent with industry practice, the Company acquires components through a combination of formal purchase orders, supplier

14


contracts, and open orders based on projected demand information. Such purchase commitments typically cover the Company's requirements for periods ranging from 30 to 130 days.

The Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company's business and financial position. At this time, such vendors include Agere Systems, Inc., Ambit Microsystems Corporation, ASUSTeK Corporation, ATI Technologies, Inc., Broadcom Corporation, Freescale Semiconductor, Inc. (formerly the Semiconductor Products Segment of Motorola, Inc.), Hitachi Global Storage Technologies, Hon Hai Precision Industry Co., Ltd., IBM Corporation, International Display Technology, Inventec Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, Mitsubishi Electric Corporation, NVIDIA Corp., Portal Player, Inc., Quanta Computer, Inc., Samsung Electronics, Synaptics, Inc., and Toshiba Corporation.

Raw Materials



Although most components essential to the Company's business are generally available from multiple sources, certain key components (including microprocessors and
application-specific integrated circuits ("ASICs")) are currently obtained by the Company from single or limited sources. Some other key components, while currently available to the Company from
multiple sources, are at times subject to industry wide availability constraints and pricing pressures. In addition, the Company uses some components that are not common to the rest of the personal
computer and consumer electronics industries, and new products introduced by the Company often initially utilize custom components obtained from only one source until the Company has evaluated whether
there is a need for, and subsequently qualifies, additional suppliers. If the supply of a key or single-sourced component to the Company were to be delayed or curtailed or in the event a key
manufacturing vendor delays shipments of completed products to the Company, the Company's ability to ship related products in desired quantities and in a timely manner could be adversely affected. The
Company did experience such delays during fiscal 2004, which resulted in the constrained availability of certain products. The Company's business and financial performance could also be adversely
affected depending on the time required to obtain sufficient quantities from the original source, or to identify and obtain sufficient quantities from an alternative source. Continued availability of
these components may be affected if producers were to decide to concentrate on the production of common components instead of components customized to meet the Company's requirements. The Company
attempts to mitigate these potential risks by working closely with these and other key suppliers on product introduction plans, strategic inventories, coordinated product introductions, and internal
and external manufacturing schedules and levels. Consistent with industry practice, the Company acquires components through a combination of formal purchase orders, supplier



14









contracts,
and open orders based on projected demand information. Such purchase commitments typically cover the Company's requirements for periods ranging from 30 to 130 days.



The
Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company's business and financial position.
At this time, such vendors include Agere Systems, Inc., Ambit Microsystems Corporation, ASUSTeK Corporation, ATI Technologies, Inc., Broadcom Corporation, Freescale
Semiconductor, Inc. (formerly the Semiconductor Products Segment of Motorola, Inc.), Hitachi Global Storage Technologies, Hon Hai Precision Industry Co., Ltd., IBM Corporation,
International Display Technology, Inventec Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, Mitsubishi Electric Corporation, NVIDIA Corp., Portal Player, Inc., Quanta
Computer, Inc., Samsung Electronics, Synaptics, Inc., and Toshiba Corporation.



These excerpts taken from the AAPL 10-K filed Dec 19, 2003.

Raw Materials

Although most components essential to the Company's business are generally available from multiple sources, certain key components (including microprocessors and application-specific integrated circuits ("ASICs")) are currently obtained by the Company from single or limited sources. Some other key components, while currently available to the Company from multiple sources, are at times subject to industry wide availability constraints and pricing pressures. In addition, the Company uses some components that are not common to the rest of the personal computer industry, and new products introduced by the Company often initially utilize custom components obtained from only one source until the Company has evaluated whether there is a need for, and subsequently qualifies, additional suppliers. If the supply of a key or single-sourced component to the Company were to be delayed or curtailed or in the event a key manufacturing vendor delays shipments of completed products to the Company, the Company's ability to ship related products in desired quantities and in a timely manner could be adversely affected. The Company's business and financial performance could also be adversely affected depending on the time required to obtain sufficient quantities from the original source, or to identify and obtain sufficient quantities from an alternative source. Continued availability of these components may be affected if producers were to decide to concentrate on the production of common components instead of components customized to meet the Company's requirements. The Company attempts to mitigate these potential risks by working closely with these and other key suppliers on product introduction plans, strategic inventories, coordinated product introductions, and internal and external manufacturing schedules and levels. Consistent with industry practice, the Company acquires components through a combination of formal purchase orders, supplier contracts, and open orders based on projected demand information. Such purchase commitments typically cover the Company's requirements for periods ranging from 30 to 130 days.

The Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company's business and financial position. At this time, such vendors include Agere Systems, Inc., Ambit Microsystems Corporation, ASUSTeK Corporation, ATI Technologies, Inc., Broadcom Corporation, Compal Corporation, Hon Hai Precision Industry Co., Ltd., IBM Corporation, International Display Technology, Inventec Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, Mitsubishi Electric Corporation, Motorola, Inc., Nvidia Corp., Quanta Computer, Inc., Samsung Electronics, Synaptics, Inc., and Toshiba Corporation.

Raw Materials



Although most components essential to the Company's business are generally available from multiple sources, certain key components (including microprocessors and
application-specific integrated circuits ("ASICs")) are currently obtained by the Company from single or limited sources. Some other key components, while currently available to the Company from
multiple sources, are at times subject to industry wide availability constraints and pricing pressures. In addition, the Company uses some components that are not common to the rest of the personal
computer industry, and new products introduced by the Company often initially utilize custom components obtained from only one source until the Company has evaluated whether there is a need for, and
subsequently qualifies, additional suppliers. If the supply of a key or single-sourced component to the Company were to be delayed or curtailed or in the event a key manufacturing vendor delays
shipments of completed products to the Company, the Company's ability to ship related products in desired quantities and in a timely manner could be adversely affected. The Company's business and
financial performance could also be adversely affected depending on the time required to obtain sufficient quantities from the original source, or to identify and obtain sufficient quantities from an
alternative source. Continued availability of these components may be affected if producers were to decide to concentrate on the production of common components instead of components customized to
meet the Company's requirements. The Company attempts to mitigate these potential risks by working closely with these and other key suppliers on product introduction plans, strategic inventories,
coordinated product introductions, and internal and external manufacturing schedules and levels. Consistent with industry practice, the Company acquires components through a combination of formal
purchase orders, supplier contracts, and open orders based on projected demand information. Such purchase commitments typically cover the Company's requirements for periods ranging from 30 to
130 days.



The
Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company's business and financial position.
At this time, such vendors include Agere Systems, Inc., Ambit Microsystems Corporation, ASUSTeK Corporation, ATI Technologies, Inc., Broadcom Corporation, Compal Corporation, Hon Hai
Precision Industry Co., Ltd., IBM Corporation, International Display Technology, Inventec Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, Mitsubishi Electric Corporation,
Motorola, Inc., Nvidia Corp., Quanta Computer, Inc., Samsung Electronics, Synaptics, Inc., and Toshiba Corporation.




These excerpts taken from the AAPL 10-K filed Dec 19, 2002.

Raw Materials

Although most components essential to the Company's business are generally available from multiple sources, certain key components (including microprocessors and application-specific integrated circuits ("ASICs")) are currently obtained by the Company from single or limited sources. Some other key components, while currently available to the Company from multiple sources, are at times subject to industry wide availability constraints and pricing pressures. In addition, the Company uses some components that are not common to the rest of the personal computer industry, and new products introduced by the Company often initially utilize custom components obtained from only one source until the Company has evaluated whether there is a need for, and subsequently qualifies, additional suppliers. If the supply of a key or single-sourced component to the Company were to be delayed or curtailed or in the event a key manufacturing vendor delays shipments of completed products to the Company, the Company's ability to ship related products in desired quantities and in a timely manner could be adversely affected. The Company's business and financial performance could also be adversely affected depending on the time required to obtain sufficient quantities from the original source, or to identify and obtain sufficient quantities from an alternative source. Continued availability of these components may be affected if producers were to decide to concentrate on the production of common components instead of components customized to meet the Company's requirements. The Company attempts to mitigate these potential risks by working closely with these and other key suppliers on product introduction plans, strategic inventories, coordinated product introductions, and internal and external manufacturing schedules and levels. Consistent with industry practice, the Company acquires components through a combination of formal purchase orders, supplier contracts, and open orders based on projected demand information. These formal and informal commitments typically cover the Company's requirements for periods ranging from 30 to 130 days.

The Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company's business and financial position. At this time, such vendors include Agere Systems, Inc., Ambit Microsystems Corporation, ATI Technologies, Inc., Elite Computer Systems Co., Inc., Hon Hai Precision Industry Co., Ltd., IBM Corporation, Inventec Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, Mitsubishi Electric Corporation, Motorola, Inc., Nvidia Corp., Quanta Computer, Inc., Samsung Electronics, Solectron Corporation, and Toshiba Corporation.

11



Further discussion relating to availability and supply of components and product may be found in Part II, Item 7 of this Form 10-K under the heading "Factors That May Affect Future Results and Financial Condition," and in Part II, Item 8 of this Form 10-K in the Notes to Consolidated Financial Statements at Note 10 under the subheading "Concentrations in the Available Sources of Supply of Materials and Product."

Raw Materials



Although most components essential to the Company's business are generally available from multiple sources, certain key components (including microprocessors and
application-specific integrated circuits ("ASICs")) are currently obtained by the Company from single or limited sources. Some other key components, while currently available to the Company from
multiple sources, are at times subject to industry wide availability constraints and pricing pressures. In addition, the Company uses some components that are not common to the rest of the personal
computer industry, and new products introduced by the Company often initially utilize custom components obtained from only one source
until the Company has evaluated whether there is a need for, and subsequently qualifies, additional suppliers. If the supply of a key or single-sourced component to the Company were to be delayed or
curtailed or in the event a key manufacturing vendor delays shipments of completed products to the Company, the Company's ability to ship related products in desired quantities and in a timely manner
could be adversely affected. The Company's business and financial performance could also be adversely affected depending on the time required to obtain sufficient quantities from the original source,
or to identify and obtain sufficient quantities from an alternative source. Continued availability of these components may be affected if producers were to decide to concentrate on the production of
common components instead of components customized to meet the Company's requirements. The Company attempts to mitigate these potential risks by working closely with these and other key suppliers on
product introduction plans, strategic inventories, coordinated product introductions, and internal and external manufacturing schedules and levels. Consistent with industry practice, the Company
acquires components through a combination of formal purchase orders, supplier contracts, and open orders based on projected demand information. These formal and informal commitments typically cover
the Company's requirements for periods ranging from 30 to 130 days.



The
Company believes there are several component suppliers and manufacturing vendors whose loss to the Company could have a material adverse effect upon the Company's business and financial position.
At this time, such vendors include Agere Systems, Inc., Ambit Microsystems Corporation, ATI Technologies, Inc., Elite Computer Systems Co., Inc., Hon Hai Precision Industry
Co., Ltd., IBM Corporation, Inventec Appliances Corporation, LG. Phillips Co., Ltd., Matsushita, Mitsubishi Electric Corporation, Motorola, Inc., Nvidia Corp., Quanta
Computer, Inc., Samsung Electronics, Solectron Corporation, and Toshiba Corporation.



11










Further
discussion relating to availability and supply of components and product may be found in Part II, Item 7 of this Form 10-K under the heading "Factors That May Affect
Future Results and Financial Condition," and in Part II, Item 8 of this Form 10-K in the Notes to Consolidated Financial Statements at Note 10 under the subheading
"Concentrations in the Available Sources of Supply of Materials and Product."



Wikinvest © 2006, 2007, 2008, 2009, 2010, 2011, 2012. Use of this site is subject to express Terms of Service, Privacy Policy, and Disclaimer. By continuing past this page, you agree to abide by these terms. Any information provided by Wikinvest, including but not limited to company data, competitors, business analysis, market share, sales revenues and other operating metrics, earnings call analysis, conference call transcripts, industry information, or price targets should not be construed as research, trading tips or recommendations, or investment advice and is provided with no warrants as to its accuracy. Stock market data, including US and International equity symbols, stock quotes, share prices, earnings ratios, and other fundamental data is provided by data partners. Stock market quotes delayed at least 15 minutes for NASDAQ, 20 mins for NYSE and AMEX. Market data by Xignite. See data providers for more details. Company names, products, services and branding cited herein may be trademarks or registered trademarks of their respective owners. The use of trademarks or service marks of another is not a representation that the other is affiliated with, sponsors, is sponsored by, endorses, or is endorsed by Wikinvest.