|
|
![]() | ![]() | ![]() | ![]() |
This excerpt taken from the C 10-K filed Feb 22, 2008. GENERAL CONSTRUCTION
O-2
3.1. All tenant alteration plans shall indicate the full extent of demolition work required to complete the scope-of-work. 3.2. All tenant alteration plans shall indicate all structural, mechanical/HVAC, plumbing, electrical, lighting and sprinkler changes required to complete the work. 3.3. Tenant alteration work shall be constructed so as to not damage or affect the structural integrity or fire-rating characteristics of any base building partition or structural member and/or assembly. 3.4. The removal of all existing fireproofing material to facilitate the installation of construction elements shall be re-patched with similar material (albeit non-ACM fireproofing). 3.5. Exterior window treatments shall not alter the exterior appearance of the Building and shall have its exterior color treatment match that of the existing curtain wall mullion. |
| |||||||