These excerpts taken from the C 10-K filed Feb 22, 2008. Monthly 1. MAKE VISUAL INSP. OF GENSET & SURROUNDING AREA 2. OPEN DOORS & INSP. INTERIOR FOR LEAKS & LOOSE BELT 3. VISUALLY INSP. TRANSFER SWITCH & TIMERS 4. TURN SWITCH TO TEST POSITION & VERIFY GENSET START 5. PERFORM CALIBRATION & ADJUSTMENT ON GENSET 6. PERFORM MONTHLY COMPLIANCE RUN AND LOAD TEST 6. OBSERVE GENSET SUPPORTING LOAD 7. VERIFY GENSET GOES TO COOLDOWN TURNS OFF AFTER SET TIME 8. CLEAN AREA AROUND GENERATOR 9. MAKE FINAL INSP., CLOSE & LOCK ALL DOORS Monthly 1. CHECK WITH OPERATING OR AREA PERSONNEL FOR DEFICIENCIES. 2. CHECK FOR UNUSUAL NOISE/VIBRATION. 3. CHECK TENSION, CONDITION, AND ALIGNMENT OF BELTS, ADJUST AS NECESSARY. 4. INSPECT EXTERIOR PIPING AND VALVES FOR LEAKS, TIGHTEN CONNECTIONS AS REQUIRED. 5. CLEAN AREA AROUND EQUIPMENT. 6. COMPLETE WORK REQUEST AND NOTE DEFICIENCIES. Monthly 1. CHECK UNIT FOR PROPER OPERATION 2. CHECK OIL LEVEL AND ADD AS NECESSARY 3. CHECK OIL TEMPERATURE 4. CHECK DEHYDRATOR OR PURGE SYSTEM, REMOVE WATER IF OBSERVED IN SIGHT GLASS 5. RUN SYSTEM CONTROL TESTS.
Sch-4-2
6. CHECK REFRIGERANT CHARGE/LEVEL, ADD AS NECESSARY. 7. CHECK COMPRESSOR FOR EXCESSIVE NOISE/VIBRATION. 8. CLEAN AREA AROUND EQUIPMENT. 9. COMPLETE WORK ORDER AND DOCUMENT ALL CLEANING AND MAINTENANCE PERFORMED Monthly:
Monthly: Machine clean and polish all flooring. All flooring shall be maintained, at the minimum, as a mid gloss finish at all times. Shampoo if carpeted.
Monthly:
Monthly:
Monthly:
| EXCERPTS ON THIS PAGE:
RELATED TOPICS for C: |
| |||||||