|
|
![]() | ![]() | ![]() | ![]() |
| |||||||||
This excerpt taken from the CS 6-K filed May 3, 2006. Asset allocation The current asset allocation is applied at the start of the projection and evolves to the intended long-term asset allocation. The stochastic projection models allow for the asset allocation to vary according to the scenario, depending on a number of different factors (e.g. the level of free assets at a point in time).
|
| |||||||