DPL » Topics » Air and Water Quality

This excerpt taken from the DPL 10-Q filed Nov 1, 2006.

Air and Water Quality

On December 17, 2003, the United States Environmental Protection Agency (USEPA) proposed the Interstate Air Quality Rule (IAQR) designed to reduce and permanently cap sulfur dioxide (SO2) and nitrogen oxide (NOx) emissions from electric utilities.  The proposed IAQR focused on states, including Ohio, whose power plant emissions are believed to be significantly contributing to fine particle and ozone pollution in other downwind states in the eastern United States.  On June 10, 2004, the USEPA issued a supplemental proposal to the IAQR, now renamed as the Clean Air Interstate Rule (CAIR).  The final rules were signed on March 10, 2005 and were published on May 12, 2005.  On August 24, 2005, the USEPA proposed additional revisions to the CAIR and initiated reconsideration on one issue.  On March 15, 2006, the USEPA announced it had completed its review of the requests for reconsideration and determined that it would propose no changes to CAIR and denied the requests for stay.  We have determined that CAIR requirements will have a material effect on our operations, requiring the installation of flue gas desulfurization (FGD) equipment and continual operation of the currently-installed Selective Catalytic Reduction (SCR) equipment.  As a result, DP&L is proceeding with the installation and has begun the construction of FGD equipment at various generating units.

On January 30, 2004, the USEPA published its proposal to restrict mercury and other air toxins from coal-fired and oil-fired utility plants.  The final Clean Air Mercury Rule (CAM-R) was signed March 15, 2005 and was published on May 18, 2005. The final rules will have a material effect on our operations.  We anticipate that the FGDs being installed to meet the requirements of CAIR may be adequate to meet the Phase I requirements of CAM-R. We expect that additional controls will be needed to meet the Phase II requirements of CAM-R that go into effect January 1, 2018.  On March 29, 2005, nine states filed lawsuits against USEPA, opposing the regulatory approach taken by USEPA.  On March 31, 2005, various groups requested that USEPA stay implementation of CAM-R.  On August 4, 2005, the United States Court of Appeals for the District of Columbia denied the motion for stay.  On October 21, 2005, USEPA initiated reconsideration proceedings on a number of issues.  On May 31, 2006, USEPA took final action on CAM-R essentially reaffirming its original rulemaking.

Under the CAIR and CAM-R cap and trade programs for SO2, NOx and mercury, we estimate we will spend more than $465 million from 2006 through 2008 to install the necessary pollution controls.  If CAM-R litigation results in plant specific mercury controls, our costs may be higher.  Due to the ongoing uncertainties associated with the litigation of the CAM-R, we cannot project the final costs at this time.

24




This excerpt taken from the DPL 10-Q filed Aug 2, 2006.

Air and Water Quality

On December 17, 2003, the USEPA proposed the Interstate Air Quality Rule (IAQR) designed to reduce and permanently cap sulfur dioxide (SO2) and nitrogen oxide (NOx) emissions from electric utilities.  The proposed IAQR focused on states, including Ohio, whose power plant emissions are believed to be significantly contributing to fine particle and ozone pollution in other downwind states in the eastern United States.  On June 10, 2004, the USEPA issued a supplemental proposal to the IAQR, now renamed as the Clean Air Interstate Rule (CAIR).  The final rules were signed on March 10, 2005 and were published on May 12, 2005.  On August 24, 2005, the USEPA proposed additional revisions to the CAIR and initiated reconsideration on one issue.  On March 15, 2006, the USEPA announced it had completed its review of the requests for reconsideration and determined that it would propose no changes to CAIR and denied the requests for stay.  We have determined that CAIR requirements will have a material effect on our operations, requiring the installation of FGD equipment and continual operation of the currently-installed Selective Catalytic Reduction (SCR) equipment.  As a result, DP&L is proceeding with the installation and has begun the construction of FGD equipment at various generating units.

On January 30, 2004, the USEPA published its proposal to restrict mercury and other air toxins from coal-fired and oil-fired utility plants.  The final Clean Air Mercury Rule (CAM-R) was signed March 15, 2005 and was published on May 18, 2005. The final rules will have a material effect on our operations.  We anticipate that the FGDs being installed to meet the requirements of CAIR may be adequate to meet the Phase I requirements of CAM-R. We expect that additional controls will be needed to meet the Phase II requirements of CAM-R that go into effect January 1, 2018.  On March 29, 2005, nine states filed lawsuits against USEPA, opposing the regulatory approach taken by USEPA.  On March 31, 2005, various groups requested that USEPA stay implementation of CAM-R.  On August 4, 2005, the United States Court of Appeals for the District of Columbia denied the motion for stay.  On October 21, 2005, USEPA initiated reconsideration proceedings on a number of issues.  On May 31, 2006, USEPA took final action on CAM-R essentially reaffirming its original rulemaking.

Under the CAIR and CAM-R cap and trade programs for SO2,, NOx and mercury, we estimate we will spend more than $465 million from 2006 through 2008 to install the necessary pollution controls.  If CAM-R litigation results in plant specific mercury controls, our costs may be higher.  Due to the ongoing uncertainties associated with the litigation of the CAM-R, we cannot project the final costs at this time.

22




This excerpt taken from the DPL 10-Q filed May 4, 2006.

Air and Water Quality

 

On October 27, 2003, the United States Environmental Protection Agency (USEPA) published its final rules regarding the equipment replacement provision (ERP) of the routine maintenance, repair and replacement (RMRR) exclusion of the Clean Air Act (CAA).  Subsequently, on December 24, 2003, the United States Court of Appeals for the D.C. Circuit stayed the effective date of the rule pending its decision on the merits of the lawsuits filed by numerous states and environmental organizations challenging the final rules. On March 17, 2006, the D.C. Circuit struck down the ERP rule. It is unclear what impact this will have on USEPA’s October 20, 2005 proposal to revise the emissions test for existing electric generating units.  The proposed rule seeks comments on two different hourly emissions test options as well as the USEPA’s current method of measuring previous actual emission levels to projected emission levels after the modification. Also available for comment is a third option which tests emissions output based upon emissions per unit of energy produced. We cannot predict the outcome of this rulemaking or its impact on current environmental litigation.

 

On December 17, 2003, the USEPA proposed the Interstate Air Quality Rule (IAQR) designed to reduce and permanently cap sulfur dioxide (SO2) and nitrogen oxide (NOx) emissions from electric utilities. The proposed IAQR focused on states, including Ohio, whose power plant emissions are believed to be significantly contributing to fine particle and ozone pollution in other downwind states in the eastern United States. On June 10, 2004, the USEPA issued a supplemental proposal to the IAQR, now renamed as the Clean Air Interstate Rule (CAIR). The final rules were signed on March 10, 2005 and were published on May 12, 2005. On August 24, 2005, the USEPA proposed additional revisions to the CAIR and initiated reconsideration on one issue. On March 15, 2006, the USEPA announced it had completed its review of the requests for reconsideration and determined that it would propose no changes to CAIR and denied the requests for stay. We have determined that CAIR requirements will have a material effect on our operations, requiring the

 

21



 

installation of FGD equipment and continual operation of the currently-installed Selective Catalytic Reduction (SCR) equipment. As a result, DP&L is proceeding with the installation and has begun the construction of FGD equipment at various generating units.

 

On January 30, 2004, the USEPA published its proposal to restrict mercury and other air toxins from coal-fired and oil-fired utility plants. The final Clean Air Mercury Rule (CAM-R) was signed March 15, 2005 and was published on May 18, 2005. The final rules will have a material effect on our operations. We anticipate that the FGDs being planned to meet the requirements of CAIR may be adequate to meet the Phase I requirements of CAM-R. We expect that additional controls will be needed to meet the Phase II requirements of CAM-R that go into effect January 1, 2018. On March 29, 2005, nine states filed lawsuits against USEPA, opposing the regulatory approach taken by USEPA. On March 31, 2005, various groups requested that USEPA stay implementation of CAM-R. On August 4, 2005, the United States Court of Appeals for the District of Columbia denied the motion for stay. On October 21, 2005, USEPA initiated reconsideration proceedings on a number of issues. We cannot predict the outcome of the reconsideration proceedings on the ongoing lawsuit on this matter.

 

Under the CAIR and CAM-R cap and trade programs for SO2, NOx and mercury, we estimate we will spend more than $453 million from 2006 through 2008 to install the necessary pollution controls. If CAM-R litigation results in plant specific mercury controls, our costs may be higher. Due to the ongoing uncertainties associated with the litigation of the CAM-R, we cannot project the final costs at this time.

 

On January 5, 2005, the USEPA published its final nonattainment designations for the national ambient air quality standard for Fine Particulate Matter 2.5 (PM 2.5) designations.  These designations included counties and partial counties in which DP&L operates and/or owns generating facilities.  On March 4, 2005, DP&L and other Ohio electric utilities and electric generators filed a petition for review in the D.C. Circuit Court of Appeals, challenging the final rule creating these designations.  On November 30, 2005, the court ordered USEPA to decide on all petitions for reconsideration by January 20, 2006. On January 20, 2006, USEPA denied the petitions for reconsideration. The Ohio Environmental Protection Agency (Ohio EPA) will have three years to develop regulations to attain and maintain compliance with the PM 2.5 national ambient air quality standard.  DP&L cannot determine the outcome of the petition for review or the effect such Ohio EPA regulations will have on its operations.

 

This excerpt taken from the DPL 10-Q filed Oct 28, 2005.

Air and Water Quality

 

In November 1999, the United States Environmental Protection Agency (USEPA) filed civil complaints and Notices of Violations (NOVs) against operators and owners of certain generation facilities for alleged violations of the Clean Air Act (CAA).  Generation units operated by CG&E (Beckjord 6) and CSP (Conesville 4) and co-owned by DP&L were referenced in these actions.  Numerous northeast states have filed complaints or have indicated that they will be joining the USEPA’s action against CG&E and CSP.  DP&L was not identified in the NOVs, civil complaints or state actions.  In December 2000, CG&E announced that it had reached an Agreement in Principle with the USEPA and other plaintiffs in an effort to settle the claims. As of September 30, 2005, discussions on the final terms of the settlement continue and the outcome of these claims or the effect, if any, on DP&L has not been determined.  In June 2000, the USEPA issued a NOV to DP&L-operated J.M. Stuart Station (co-owned by DP&L, CG&E, and CSP) for alleged violations of the CAA.  The NOV contained allegations consistent with NOVs and complaints that the USEPA had recently brought against numerous other coal-fired utilities in the Midwest.  DP&L intends to vigorously challenge the NOV.

 

On September 21, 2004, the Sierra Club filed a lawsuit against DP&L and the other owners of the Stuart Generating Station in the United States District Court for the Southern District of Ohio for alleged violations of the CAA.  DP&L intends to vigorously defend this matter.

 

On November 17, 2004, a citizens’ suit was filed against CG&E (Freeman v. CG&E) for alleged violations of the CAA.  DP&L believes the allegations are meritless and believes CG&E, as the operator of the Zimmer generating station, will vigorously defend the matter on behalf of all co-owners.

 

On November 18, 2004, the State of New York and seven other states filed suit against the American Electric Power Corporation (AEP) and various subsidiaries, alleging various CAA violations at a number of AEP electric generating facilities, including Conesville Unit 4 (co-owned by CG&E, DP&L and CSP).  DP&L believes the allegations are without merit and that AEP, on behalf of all co-owners, will vigorously defend the matter.

 

On October 27, 2003, the USEPA published its final rules regarding the equipment replacement provision (ERP) of the routine maintenance, repair and replacement (RMRR) exclusion of the CAA.  Subsequently, on December 24, 2003, the United States Court of Appeals for the D.C. Circuit (D.C. Circuit) stayed the effective date of the rule pending its decision on the merits of the lawsuits filed by numerous states and environmental organizations challenging the final rules. On June 10, 2005, USEPA published its reconsideration of the ERP upholding the ERP as it was originally issued in 2003 and clarifying the basis and support for selecting 20 percent for the threshold cost criterion.  As a result of the stay, it is expected that the Ohio Environmental Protection Agency (Ohio EPA) will delay its previously announced intent to adopt the RMRR rule.  At this time, DP&L is unable to determine if or when the Ohio EPA will adopt the RMRR rule.

 

In September 1998, the USEPA issued a final rule requiring states to modify their State Implementation Plans (SIPs) under the CAA.  On July 18, 2002, the Ohio EPA adopted rules that constitute Ohio’s NOx SIP, which is substantially similar to the federal CAA Section 126 rulemaking and federal NOx SIP.  On August 5, 2003, the USEPA published its conditional approval of Ohio’s nitrogen oxide (NOx) SIP, with an effective date of September 4, 2003.  Ohio’s SIP requires NOx reductions at coal-fired generating units effective May 31, 2004.

 

In order to meet these NOx requirements, DP&L’s capital expenditures for the installation of selective catalytic reduction (SCR) equipment totaled approximately $175 million.  On May 31, 2004, DP&L began operation of its SCRs.  DP&L’s NOx reduction strategy and associated expenditures to meet the federal reduction requirements should satisfy the Ohio SIP NOx reduction requirements.

 

On December 17, 2003, the USEPA proposed the Interstate Air Quality Rule (IAQR) designed to reduce and permanently cap sulfur dioxide (SO2) and NOx emissions from electric utilities.  The proposed IAQR focused on states, including Ohio, whose power plant emissions are believed to be significantly contributing to fine particle and ozone pollution in other downwind states in the eastern United States.  On June 10, 2004, the USEPA issued a supplemental proposal to the IAQR, now renamed as the Clean Air Interstate Rule (CAIR).  The final rules were signed on March 10, 2005 and were published on May 12, 2005.  On August 24, 2005, the USEPA proposed additional revisions to the CAIR and initiated reconsideration on one issue. DP&L cannot predict the outcome of the reconsideration proceedings, the petitions or

 

26



 

pending litigation. CAIR will have a material effect on our operations. DP&L anticipates that Phase I of CAIR will require the installation of flue gas desulfurization (FGD) equipment and annual operation of the currently-installed SCR.

 

On January 30, 2004, the USEPA published its proposal to restrict mercury and other air toxics from coal-fired and oil-fired utility plants.  The final Clean Air Mercury Rule (CAM-R) was signed March 15, 2005 and was published on May 18, 2005. The final rules will have a material effect on our operations. DP&L anticipates that the FGD being planned to meet the requirements of CAIR may be adequate to meet the Phase I requirements of CAM-R. DP&L expects that additional controls will be needed to meet the Phase II requirements of CAM-R that go into effect January 1, 2018. On March 29, 2005, nine states sued USEPA, opposing the regulatory approach taken by USEPA. On March 31, 2005, various groups requested that USEPA stay implementation of CAM-R. On August 4, 2005, the United States Court of Appeals for the District of Columbia denied the motion for stay. EPA is expected to initiate reconsideration proceedings on one or more issues. DP&L cannot predict the outcome of the reconsideration proceedings or pending litigation.

 

Under the CAIR and CAM-R cap and trade programs for SO2, NOx and mercury, the Company estimates it will spend more than $500 million from 2005 through 2008 to install the necessary pollution controls.  If CAM-R litigation results in plant specific mercury controls, the Company’s costs may be higher.  Due to the ongoing uncertainties associated with the litigation of the CAM-R, the Company cannot project the final costs at this time.

 

On July 15, 2003, the Ohio EPA submitted to the USEPA its recommendations for eight-hour ozone nonattainment boundaries for the metropolitan areas within Ohio.  On April 15, 2004, the USEPA issued its list of ozone nonattainment designations.  DP&L owns and/or operates a number of facilities in counties designated as nonattainment with the ozone national ambient air quality standard.  DP&L does not know at this time what future regulations may be imposed on its facilities and will closely monitor the regulatory process.  Ohio EPA will have until April 15, 2007 to develop regulations to attain and maintain compliance with the eight-hour ozone national ambient air quality standard.   Numerous parties have filed petitions for review.  DP&L cannot predict the outcome of USEPA’s reconsideration petitions.

 

On January 5, 2005, the USEPA published its final nonattainment designations for the national ambient air quality standard for Fine Particulate Matter 2.5 (PM 2.5) designations.  These designations included counties and partial counties in which DP&L operates and/or owns generating facilities.  On March 4, 2005, DP&L and other Ohio electric utilities and electric generators filed a petition for review in the D.C. Circuit Court of Appeals, challenging the final rule creating these designations.  The Ohio EPA will have three years to develop regulations to attain and maintain compliance with the PM 2.5 national ambient air quality standard.  DP&L cannot determine the outcome of this petition or the effect such Ohio EPA regulations will have on its operations.

 

In April 2002, the USEPA issued proposed rules governing existing facilities that have cooling water intake structures.  Final rules were published in the Federal Register on July 9, 2004.  A number of parties appealed the rules to the federal Court of Appeals for the Second Circuit in New York.  DP&L anticipates that future studies may be needed at certain generating facilities.  DP&L cannot predict the impact such studies may have on future operations or the outcome of litigation proceedings.

 

On March 5, 2004, the USEPA issued final national emissions standards for hazardous air pollutants for stationary combustion turbines.  The effect of the final standards on our operations is not expected to be material.  On July 1, 2004, the USEPA finalized, but has not yet published, rules that remove four subcategories of new combustion turbines from regulation under the hazardous air pollutant regulations.

 

On April 14, 2003, the USEPA issued proposed final rules for standards of performance for stationary gas turbines.  On May 23, 2003, the USEPA withdrew the direct final rules.  The final rules were reissued on July 8, 2004 and were determined to not have an impact on existing combustion turbine facilities.

 

On May 5, 2004, the USEPA issued its proposed regional haze rule, which addresses how states should determine best available retrofit technology (BART) for sources covered under the regional haze rule.  Final rules were published July 6, 2005, providing States with several options for determining whether sources in the State should be subject to BART.   In the final rule, USEPA made the determination that CAIR achieves greater progress than BART and may be used by States as a BART substitute.  Numerous units owned and operated by DP&L will be impacted by BART.  DP&L cannot determine the extent of the impact until Ohio determines how BART will be implemented.

 

On May 4, 2004, the Ohio EPA issued a final National Pollutant Discharge Elimination System permit for J.M. Stuart Station that continues the station’s 316(a) variance.

 

During the three-year term of the draft permit, DP&L will conduct a thermal discharge study to evaluate the technical feasibility and economic reasonableness of water cooling methods other than cooling towers.

 

On October 13, 2005, the USEPA issued a proposed rule concerning the test for measuring whether modifications to electric generating units should trigger application of New Source Review (NSR) standards under the CAA.  The proposed rule provides for two different hourly emissions test options for comment versus the USEPA’s current method of measuring previous actual emission levels to projected actual emission levels after the modification.  A third option that tests emissions increase based upon emissions per unit of energy output is also available for comment.  DP&L cannot predict the outcome of this rulemaking or its impact on current environmental litigation.

 

27



 

This excerpt taken from the DPL 10-Q filed Jul 29, 2005.

Air and Water Quality

 

On December 17, 2003, the USEPA proposed the Interstate Air Quality Rule (IAQR) designed to reduce and permanently cap sulfur dioxide (SO2) and NOx emissions from electric utilities.  The proposed IAQR focused on states, including Ohio, whose power plant emissions are believed to be significantly contributing to fine particle and ozone pollution in other downwind states in the eastern United States.  On June 10, 2004, the USEPA issued a supplemental proposal to the IAQR, now renamed as the Clean Air Interstate Rule (CAIR).  The final rules were signed on March 10, 2005.  Although not yet published, CAIR will have a material effect on the Company’s operations.  DP&L anticipates that Phase I of CAIR will require the installation of flue gas desulfurization (FGD) equipment and annual operation of the currently-installed SCR.

 

On January 30, 2004, the USEPA published its proposal to restrict mercury and other air toxics from coal-fired and oil-fired utility plants.  The final Clean Air Mercury Rule (CAM-R) was signed March 15, 2005.  Although not yet published, the final rules will have a material effect on the Company’s operations.  DP&L anticipates that the FGD being planned to meet the requirements of CAIR may be adequate to meet the Phase I requirements of CAM-R.  DP&L expects that additional controls will be needed to meet the Phase II requirements of CAM-R that go into effect January 1, 2018.  On March 29, 2005, nine states sued USEPA, opposing the regulatory approach taken by USEPA.  On March 31, 2005, various groups requested that USEPA stay implementation of CAM-R.  Under the CAIR and CAM-R cap and trade programs for SO2, NOx and mercury, the Company estimates it will spend more than $500 million from 2005 through 2008 to install the necessary pollution controls.  If CAM-R litigation results in plant specific mercury controls, the Company’s costs may be higher.  Due to the ongoing uncertainties associated with the litigation of the CAM-R, the Company cannot project the final costs at this time.

 

This excerpt taken from the DPL 10-Q filed May 4, 2005.

Air and Water Quality

 

On December 17, 2003, the USEPA proposed the Interstate Air Quality Rule (IAQR) designed to reduce and permanently cap sulfur dioxide (SO2) and NOx emissions from electric utilities.  The proposed IAQR focused on states, including Ohio, whose power plant emissions are believed to be significantly contributing to fine particle and ozone pollution in other downwind states in the eastern United States.  On June 10, 2004, the USEPA issued a supplemental proposal to the IAQR, now renamed as the Clean Air Interstate Rule (CAIR).  The final rules were signed on March 10, 2005.  Although not yet published, CAIR will have a material effect on the Company’s operations.  DP&L anticipates that Phase I of CAIR will require the installation of flue gas desulfurization (FGD) equipment and annual operation of the currently-installed SCR.

 

On January 30, 2004, the USEPA published its proposal to restrict mercury and other air toxics from coal-fired and oil-fired utility plants.  The final Clean Air Mercury Rule (CAM-R) was signed March 15, 2005.  Although not yet published, the final rules will have a material effect on the Company’s operations.  DP&L anticipates that the FGD being planned to meet the requirements of CAIR may be adequate to meet the Phase I requirements of CAM-R.  DP&L expects that additional controls will be needed to meet the Phase II requirements of CAM-R that go into effect January 1, 2018.  On March 29, 2005, nine states sued USEPA, opposing the regulatory approach taken by USEPA.  On March 31, 2005, various groups requested that USEPA stay implementation of CAM-R.

 

Under the CAIR and CAM-R cap and trade programs for SO2, NOx and mercury, the Company estimates it will spend more than $500 million from 2005 through 2008 to install the necessary pollution controls.  If CAM-R litigation results in plant specific mercury controls, the Company’s costs may be higher.  Due to the ongoing uncertainties associated with the litigation of the CAM-R, the Company cannot project the final costs at this time.

 

This excerpt taken from the DPL 10-K filed Mar 11, 2005.

Air and Water Quality

In November 1999, the United States Environmental Protection Agency (USEPA) filed civil complaints and Notices of Violations (NOVs) against operators and owners of certain generation facilities for alleged violations of the Clean Air Act (CAA).  Generation units operated by CG&E (Beckjord 6) and Columbus Southern Power Company (CSP) (Conesville 4) and co-owned by DP&L were referenced in these actions.  Numerous northeast states have filed complaints or have indicated that they will be joining the USEPA’s action against CG&E and CSP.  DP&L was not identified in the NOVs, civil complaints or state actions.  In December 2000, CG&E announced that it had reached an Agreement in Principle with the USEPA and other plaintiffs in an effort to settle the claims. As of December 31, 2004, discussions on the final terms of the settlement continue and the outcome of these claims or the effect, if any, on DP&L has not been determined.  In June 2000, the USEPA issued a NOV to DP&L-operated J.M. Stuart Station (co-owned by DP&L, CG&E, and CSP) for alleged violations of the CAA.  The NOV contained allegations consistent with NOVs and complaints that the USEPA had recently brought against numerous other coal-fired utilities in the Midwest.  DP&L intends to vigorously challenge the NOV given the final routine maintenance repair and replacement rules discussed below.

 

On September 21, 2004, the Sierra Club filed a lawsuit against the Company and the other owners of the Stuart Generating Station in the United States District Court for the Southern District of Ohio for alleged violations of the CAA.  The Company intends to vigorously defend this matter.

 

11



 

On July 27, 2004, various residents of the Village of Moscow, Ohio notified CG&E, as the operator of Zimmer (co-owned by CG&E, DP&L and CSP), of their intent to sue for alleged violations of the CAA and air pollution nuisances.  On November 17, 2004, a citizens’ suit was filed against CG&E (Freeman v. CG&E).  DP&L believes the allegations are meritless and believes CG&E, on behalf of all co-owners, will vigorously defend the matter.

 

On November 18, 2004, the State of New York and seven other states filed suit against the American Electric Power Corporation (AEP) and various subsidiaries, alleging various CAA violations at a number of AEP electric generating facilities, including Conesville Unit 4 (co-owned by CG&E, DP&L and CSP).  DP&L believes the allegations are without merit and that AEP, on behalf of all co-owners, will vigorously defend the matter.

 

On October 27, 2003, the USEPA published its final rules regarding the equipment replacement provision of the routine maintenance, repair and replacement (RMRR) exclusion of the CAA.  Subsequently, on December 24, 2003, the U.S. Court of Appeals for the D.C. Circuit stayed the effective date of the rule pending its decision on the merits of the lawsuits filed by numerous states and environmental organizations challenging the final rules.  As a result of this ruling, it is expected that the Ohio Environmental Protection Agency (Ohio EPA) will delay its previously announced intent to adopt the RMRR rule.  At this time, DP&L is unable to determine the timing of this adoption.

 

In September 1998, the USEPA issued a final rule requiring states to modify their State Implementation Plans (SIPs) under the CAA.  On July 18, 2002, the Ohio EPA adopted rules that constitute Ohio’s NOx SIP, which is substantially similar to the federal CAA Section 126 rulemaking and federal NOx SIP.  On August 5, 2003, the USEPA published its conditional approval of Ohio’s NOx SIP, with an effective date of September 4, 2003.  Ohio’s SIP requires NOx reductions at coal-fired generating units effective May 31, 2004.  In order to meet these NOx requirements, DP&L’s capital expenditures for the installation of selective catalytic reduction (SCR) equipment totaled approximately $175 million.  On May 31, 2004, DP&L began operation of its SCRs.  DP&L’s NOx reduction strategy and associated expenditures to meet the federal reduction requirements should satisfy the Ohio SIP NOx reduction requirements.

 

On December 17, 2003, the USEPA proposed the Interstate Air Quality Rule (IAQR) designed to reduce and permanently cap sulfur dioxide (SO2) and nitrogen oxide emissions from electric utilities.  The proposed IAQR focuses on states, including Ohio, whose power plant emissions are believed to be significantly contributing to fine particle and ozone pollution in other downwind states in the eastern United States.  On June 10, 2004, the USEPA issued a supplemental proposal to the IAQR, now renamed as the Clean Air Interstate Rule (CAIR).  Until final rules are published, DP&L cannot determine the effect of the proposed rules on DP&L’s operations.

 

On January 30, 2004, the USEPA published its proposal to restrict mercury and other air toxins from coal-fired and oil-fired utility plants.  DP&L is reviewing the various proposed options and the impact of each option.  Until final rules are published, DP&L cannot determine the effect of the proposed rules on DP&L’s operations.

 

Under the proposed cap and trade options for SO2 and NOx, as well as mercury, DP&L estimates it will spend more than $500 million from 2004 through 2009 to install the necessary pollution controls.  Plant specific mercury controls may result in higher costs.  Due to the uncertainties associated with the proposed requirements, DP&L cannot project the final costs at this time.

 

On July 15, 2003, the Ohio EPA submitted to the USEPA its recommendations for eight-hour ozone nonattainment boundaries for the metropolitan areas within Ohio.  On April 15, 2004, the USEPA issued its list of ozone nonattainment designations.  DP&L owns and/or operates a number of facilities in counties designated as nonattainment with the ozone national ambient air quality standard.  DP&L does not know at this time what future regulations may be imposed on its facilities and will closely monitor the regulatory process.  Following the final designation of the nonattainment

 

12



 

areas, the Ohio EPA will have three years to develop regulations to attain and maintain compliance with the eight-hour ozone national ambient air quality standard.  The IAQR/CAIR addresses harmonization with these issues.  It is expected that the Ohio EPA will revise its SIP consistent with the IAQR/CAIR when these rules are finalized.

 

On January 5, 2005, the USEPA published its final nonattainment designations for the national ambient air quality standard for Fine Particulate Matter 2.5 (PM 2.5) designations.  These designations included counties and partial counties in which DP&L operates and/or owns generating facilities.  On March 4, 2005, DP&L and other Ohio electric utilities and electric generators filed a petition for review in the D.C. Circuit Court of Appeals, challenging the final rule creating these designations.  The Ohio EPA will have three years to develop regulations to attain and maintain compliance with the PM 2.5 national ambient air quality standard.  DP&L cannot determine the outcome of this petition or the effect such Ohio EPA regulations will have on its operations.

 

In April 2002, the USEPA issued proposed rules governing existing facilities that have cooling water intake structures.  Final rules were published in the Federal Register on July 9, 2004.  DP&L anticipates that future studies may be needed at certain generating facilities.  DP&L cannot predict the impact such studies may have on future operations.

 

On March 5, 2004, the USEPA issued final national emissions standards for hazardous air pollutants for stationary combustion turbines.  The effect of the final standards on DPL’s operations is not expected to be material.  On July 1, 2004, the USEPA finalized, but has not yet published, rules that remove four subcategories of new combustion turbines from regulation under the hazardous air pollutant regulations.

 

On April 14, 2003, the USEPA issued proposed final rules for standards of performance for stationary gas turbines.  On May 23, 2003, the USEPA withdrew the direct final rules.  The final rules were reissued on July 8, 2004 and were determined to not have an impact on existing combustion turbine facilities.

 

On May 5, 2004, the USEPA issued its proposed regional haze rule, which addresses how states should determine best available retrofit technology (BART) for sources covered under the regional haze rule.  The proposal gives states three options for determining which sources should be subject to BART and provides guidelines for states on conducting the technical analysis of possible controls as BART.  The proposal is being issued to respond to the D.C. Circuit’s remand of the regional haze rule in American Corn Growers Association v. USEPA, 291 F.3d 1 (D.C. Cir. 2002), in which the court told the USEPA that the BART determination has to include analysis of the degree of visibility improvement resulting from the use of control technology at each source subject to BART and that the USEPA could not mandate that states follow a collective contribution approach to determine whether sources in the state could reasonably be anticipated to contribute to visibility impairment in a Class I area.  DP&L is reviewing the proposed rule to determine the impact on any of its facilities.  The USEPA, in its June 10, 2004 supplemental CAIR, has proposed that BART-eligible electric generating units (EGUs) may be exempted from BART if the state complies with the CAIR requirements through the adoption of the CAIR Cap-and-trade program for SO2 and NOx emissions.  If Ohio adopts such a program, BART will not require any additional reductions.

 

On May 4, 2004, the Ohio EPA issued a final National Pollutant Discharge Elimination System (NPDES) permit for J.M. Stuart Station that continues the station’s 316(a) variance.  During the three-year term of the draft permit, DP&L will conduct a thermal discharge study to evaluate the technical feasibility and economic reasonableness of water cooling methods other than cooling towers.

 

Wikinvest © 2006, 2007, 2008, 2009, 2010, 2011, 2012. Use of this site is subject to express Terms of Service, Privacy Policy, and Disclaimer. By continuing past this page, you agree to abide by these terms. Any information provided by Wikinvest, including but not limited to company data, competitors, business analysis, market share, sales revenues and other operating metrics, earnings call analysis, conference call transcripts, industry information, or price targets should not be construed as research, trading tips or recommendations, or investment advice and is provided with no warrants as to its accuracy. Stock market data, including US and International equity symbols, stock quotes, share prices, earnings ratios, and other fundamental data is provided by data partners. Stock market quotes delayed at least 15 minutes for NASDAQ, 20 mins for NYSE and AMEX. Market data by Xignite. See data providers for more details. Company names, products, services and branding cited herein may be trademarks or registered trademarks of their respective owners. The use of trademarks or service marks of another is not a representation that the other is affiliated with, sponsors, is sponsored by, endorses, or is endorsed by Wikinvest.