These excerpts taken from the DOW 10-K filed Feb 19, 2008.

Litigation

Breast Implant Matters

On May 15, 1995, Dow Corning Corporation ("Dow Corning"), in which the Company is a 50 percent shareholder, voluntarily filed for protection under Chapter 11 of the Bankruptcy Code to resolve litigation related to Dow Corning's breast implant and other silicone medical products. On June 1, 2004, Dow Corning's Joint Plan of Reorganization (the "Joint Plan") became effective and Dow Corning emerged from bankruptcy. The Joint Plan contains release and injunction provisions resolving all tort claims brought against various entities, including the Company, involving Dow Corning's breast implant and other silicone medical products.

       To the extent not previously resolved in state court actions, cases involving Dow Corning's breast implant and other silicone medical products filed against the Company were transferred to the U.S. District Court for the Eastern District of Michigan (the "District Court") for resolution in the context of the Joint Plan. On October 6, 2005, all such cases then pending in the District Court against the Company were dismissed. Should cases involving Dow Corning's breast implant and other silicone medical products be filed against the Company in the future, they will be accorded similar treatment. It is the opinion of the Company's management that the possibility is remote that a resolution of all future cases will have a material adverse impact on the Company's consolidated financial statements.

       As part of the Joint Plan, Dow and Corning Incorporated have agreed to provide a credit facility to Dow Corning in an aggregate amount of $300 million. The Company's share of the credit facility is $150 million and is subject to the terms and conditions stated in the Joint Plan. At December 31, 2007, no draws had been taken against the credit facility.

DBCP Matters

Numerous lawsuits have been brought against the Company and other chemical companies, both inside and outside of the United States, alleging that the manufacture, distribution or use of pesticides containing dibromochloropropane ("DBCP") has caused personal injury and property damage, including contamination of groundwater. It is the opinion of the Company's management that the possibility is remote that the resolution of such lawsuits will have a material adverse impact on the Company's consolidated financial statements.

Environmental Matters

Accruals for environmental matters are recorded when it is probable that a liability has been incurred and the amount of the liability can be reasonably estimated, based on current law and existing technologies. At December 31, 2007, the Company had accrued obligations of $322 million for environmental remediation and restoration costs, including $28 million for the remediation of Superfund sites. This is management's best estimate of the costs for remediation and restoration with respect to environmental matters for which the Company has accrued liabilities, although the ultimate cost with respect to these particular matters could range up to twice that amount. Inherent uncertainties exist in these estimates primarily due to unknown conditions, changing governmental regulations and legal standards regarding liability, and evolving technologies for handling site remediation and restoration. At December 31, 2006, the Company had accrued obligations of $347 million for environmental remediation and restoration costs, including $31 million for the remediation of Superfund sites.

       The following table summarizes the activity in the Company's accrued obligations for environmental matters for the years ended December 31, 2007 and 2006:

83



 
Accrued Obligations for Environmental Matters  
In millions   2007   2006  

 
Balance at January 1   $347   $339  
Additional accruals   113   130  
Charges against reserve   (152 ) (124 )
Adjustments to reserve   14   2  

 
Balance at December 31   $322   $347  

 

       The amounts charged to income on a pretax basis related to environmental remediation totaled $92 million in 2007, $125 million in 2006 and $79 million in 2005. Capital expenditures for environmental protection were $189 million in 2007, $193 million in 2006 and $150 million in 2005.

Midland Site Environmental Matters

On June 12, 2003, the Michigan Department of Environmental Quality ("MDEQ") issued a Hazardous Waste Operating License (the "License") to the Company's Midland, Michigan manufacturing site (the "Midland site"), which included provisions requiring the Company to conduct an investigation to determine the nature and extent of off-site contamination in Midland area soils; Tittabawassee and Saginaw River sediment and floodplain soils; and Saginaw Bay. The License required the Company, by August 11, 2003, to propose a detailed Scope of Work for the off-site investigation for the City of Midland and the Tittabawassee River and floodplain for review and approval by the MDEQ. Revised Scopes of Work were approved by the MDEQ on October 18, 2005. The Company was required to submit a Scope of Work for the investigation of the Saginaw River and Saginaw Bay by August 11, 2007. The Company submitted the Scope of Work for the Saginaw River and Saginaw Bay on July 13, 2007. The Company received a Notice of Deficiency dated August 29, 2007, from the MDEQ with respect to the Scope of Work for the Saginaw River and Saginaw Bay. The Company submitted a revised Scope of Work for the Saginaw River and Saginaw Bay to the MDEQ on October 15, 2007.

       Discussions between the Company and the MDEQ that occurred in 2004 and early 2005 regarding how to proceed with off-site corrective action under the License resulted in the execution of the Framework for an Agreement Between the State of Michigan and The Dow Chemical Company (the "Framework") on January 20, 2005. The Framework committed the Company to propose a remedial investigation work plan by the end of 2005, conduct certain studies, and take certain immediate interim remedial actions in the City of Midland and along the Tittabawassee River.

    Remedial Investigation Work Plans

    The Company submitted Remedial Investigation Work Plans for the City of Midland and for the Tittabawassee River on December 29, 2005. By letters dated March 2, 2006 and April 13, 2006, the MDEQ provided two Notices of Deficiency ("Notices") to the Company regarding the Remedial Investigation Work Plans. The Company responded, as required, to some of the items in the Notices on May 1, 2006, and as required responded to the balance of the items and submitted revised Remedial Investigation Work Plans on December 1, 2006. In response to subsequent discussions with the MDEQ, the Company submitted further revised Remedial Investigation Work Plans on September 17, 2007, for the Tittabawassee River and on October 15, 2007, for the City of Midland.

    Studies Conducted

    On July 12, 2006, the MDEQ approved the sampling for the first six miles of the Tittabawassee River. On December 1, 2006, the MDEQ approved the Sampling and Analysis Plan in Support of Bioavailability Study for Midland (the "Plan"). The results of the Plan were provided to the MDEQ on March 22, 2007. On May 3, 2007, the MDEQ approved the GeoMorph® Pilot Site Characterization Report for the first six miles and approved this approach for the balance of the Tittabawassee River with some qualifications. On July 12, 2007, the MDEQ approved, with qualifications, the sampling for the next 11 miles of the Tittabawassee River.

    Interim Remedial Actions

    The Company has been working with the MDEQ to implement Interim Response Activities and Pilot Corrective Action Plans in specific areas in and along the Tittabawassee River, where elevated levels of dioxins and furans were found during the investigation of the first six miles of the river.

    Removal Actions

    On June 27, 2007, the U.S. Environmental Protection Agency ("EPA") sent a letter to the Company demanding that the Company enter into consent orders under Section 106 of the Comprehensive Environmental Response, Compensation, and Liability Act ("CERCLA") for three areas identified during investigation of the first six miles of the Tittabawassee

84


    River as areas for interim remedial actions under MDEQ oversight. The EPA sought a commitment that the Company immediately engage in remedial actions to remove soils and sediments. Three removal orders were negotiated and were signed on July 12, 2007, and the soil and sediment required to be removed by these orders has been completed. On November 15, 2007, the Company and the EPA entered into a CERCLA removal order requiring the Company to remove sediment in the Saginaw River where elevated concentrations were identified during investigative work conducted on the Saginaw River. The sediment removal work was completed in December 2007.

       The Framework also contemplates that the Company, the State of Michigan and other federal and tribal governmental entities will negotiate the terms of an agreement or agreements to resolve potential governmental claims against the Company related to historical off-site contamination associated with the Midland site. The Company and the governmental parties began to meet in the fall of 2005 and entered into a Confidentiality Agreement in December 2005. The Company continues to conduct negotiations with the governmental parties under the Federal Alternative Dispute Resolution Act.

       On September 12, 2007, the EPA issued a press release reporting that they were withdrawing from the alternative dispute resolution process. On September 28, 2007, the Company entered into a Funding and Participation Agreement with the natural resource damage trustees that addressed the Company's payment of past costs incurred by the trustees, payment of the costs of a trustee coordinator and a process to review additional cooperative studies that the Company might agree to fund or conduct with the natural resource damage trustees.

       On October 10, 2007, the EPA presented a Special Notice letter to the Company offering to enter into negotiations for an administrative order on consent for the Company to conduct or fund a remedial investigation, a feasibility study, interim remedial actions and a remedial design for the Tittabawassee River, Saginaw River, and Saginaw Bay. The Company agreed to enter into negotiations and submitted its Good Faith Offer to the EPA on December 10, 2007. On January 4, 2008, the EPA terminated negotiations under the Special Notice Letter.

       At the end of 2007, the Company had an accrual for off-site corrective action of $5 million (included in the total accrued obligation of $322 million at December 31, 2007) based on the range of activities that the Company proposed and discussed implementing with the MDEQ and which is set forth in the Framework. At December 31, 2006, the accrual for off-site corrective action was $7 million (included in the total accrued obligation of $347 million at December 31, 2006).

Environmental Matters Summary

It is the opinion of the Company's management that the possibility is remote that costs in excess of those disclosed will have a material adverse impact on the Company's consolidated financial statements.

Litigation



Breast Implant Matters



On May 15, 1995, Dow Corning Corporation ("Dow Corning"), in which the Company is a 50 percent shareholder, voluntarily filed for protection under
Chapter 11 of the Bankruptcy Code to resolve litigation related to Dow Corning's breast implant and other silicone medical products. On June 1, 2004, Dow Corning's Joint Plan of
Reorganization (the "Joint Plan") became effective and Dow Corning emerged from bankruptcy. The Joint Plan contains release and injunction provisions resolving all tort claims brought against various
entities, including the Company, involving Dow Corning's breast implant and other silicone medical products.



       To
the extent not previously resolved in state court actions, cases involving Dow Corning's breast implant and other silicone medical products filed against the Company were transferred
to the U.S. District Court for the Eastern District of Michigan (the "District Court") for resolution in the context of the Joint Plan. On October 6, 2005, all such cases then pending in the
District Court against the Company were dismissed. Should cases involving Dow Corning's breast implant and other silicone medical products be filed against the Company in the future, they will be
accorded similar treatment. It is the opinion of the Company's management that the possibility is remote that a resolution of all future cases will have a material adverse impact on the Company's
consolidated financial statements.



       As
part of the Joint Plan, Dow and Corning Incorporated have agreed to provide a credit facility to Dow Corning in an aggregate amount of $300 million. The Company's share of the
credit facility is $150 million and is subject to the terms and conditions stated in the Joint Plan. At December 31, 2007, no draws had been taken against the credit facility.




DBCP Matters



Numerous lawsuits have been brought against the Company and other chemical companies, both inside and outside of the United States, alleging that the manufacture, distribution
or use of pesticides containing dibromochloropropane ("DBCP") has caused personal injury and property damage, including contamination of groundwater. It is the opinion of the Company's management that
the possibility is remote that the resolution of such lawsuits will have a material adverse impact on the Company's consolidated financial statements.



Environmental Matters



Accruals for environmental matters are recorded when it is probable that a liability has been incurred and the amount of the liability can be reasonably estimated, based on
current law and existing technologies. At December 31, 2007, the Company had accrued obligations of $322 million for environmental remediation and restoration costs, including
$28 million for the remediation of Superfund sites. This is management's best estimate of the costs for remediation and restoration with respect to environmental matters for which the Company
has accrued liabilities, although the ultimate cost with respect to these particular matters could range up to twice that amount. Inherent uncertainties exist in these estimates primarily due to
unknown conditions, changing governmental regulations and legal standards regarding liability, and evolving technologies for handling site remediation and restoration. At December 31, 2006, the
Company had accrued obligations of $347 million for environmental remediation and restoration costs, including $31 million for the remediation of Superfund sites.




       The
following table summarizes the activity in the Company's accrued obligations for environmental matters for the years ended December 31, 2007 and 2006:



83
















































































 
Accrued Obligations for Environmental Matters 
In millions 2007 2006 

 
Balance at January 1 $347 $339 
Additional accruals 113 130 
Charges against reserve (152)(124)
Adjustments to reserve 14 2 

 
Balance at December 31 $322 $347 

 




       The amounts charged to income on a pretax basis related to environmental remediation totaled $92 million in 2007, $125 million in
2006 and $79 million in 2005. Capital expenditures for environmental protection were $189 million in 2007, $193 million in 2006 and $150 million in 2005.



Midland Site Environmental Matters



On June 12, 2003, the Michigan Department of Environmental Quality ("MDEQ") issued a Hazardous Waste Operating License (the "License") to the Company's Midland, Michigan
manufacturing site (the "Midland site"), which included provisions requiring the Company to conduct an investigation to determine the nature and extent of off-site contamination in Midland
area soils; Tittabawassee and Saginaw River sediment and floodplain soils; and Saginaw Bay. The License required the Company, by August 11, 2003, to propose a detailed Scope of Work for the
off-site investigation for the City of Midland and the Tittabawassee River and floodplain for review and approval by the MDEQ. Revised Scopes of Work were approved by the MDEQ on
October 18, 2005. The Company was required to submit a Scope of Work for the investigation of the Saginaw River and Saginaw Bay by August 11, 2007. The Company submitted the Scope of
Work for the Saginaw River and Saginaw Bay on July 13, 2007. The Company received a Notice of Deficiency dated August 29, 2007, from the MDEQ with respect to the Scope of Work for the
Saginaw River and Saginaw Bay. The Company submitted a revised Scope of Work for the Saginaw River and Saginaw Bay to the MDEQ on October 15, 2007.



       Discussions
between the Company and the MDEQ that occurred in 2004 and early 2005 regarding how to proceed with off-site corrective action under the License resulted in the
execution of the Framework for an Agreement Between the State of Michigan and The Dow Chemical Company (the "Framework") on January 20, 2005. The Framework committed the Company to propose a
remedial investigation work plan by the end of 2005, conduct certain studies, and take certain immediate interim remedial actions in the City of Midland and along the Tittabawassee River.





    Remedial Investigation Work Plans



    The
    Company submitted Remedial Investigation Work Plans for the City of Midland and for the Tittabawassee River on December 29, 2005. By letters dated March 2, 2006 and April 13,
    2006, the MDEQ provided two Notices of Deficiency ("Notices") to the Company regarding the Remedial Investigation Work Plans. The Company responded, as required, to some of the items in the Notices on
    May 1, 2006, and as required responded to the balance of the items and submitted revised Remedial Investigation Work Plans on December 1, 2006. In response to subsequent discussions with
    the MDEQ, the Company submitted further revised Remedial Investigation Work Plans on September 17, 2007, for the Tittabawassee River and on October 15, 2007, for the City of Midland.



    Studies Conducted



    On
    July 12, 2006, the MDEQ approved the sampling for the first six miles of the Tittabawassee River. On December 1, 2006, the MDEQ approved the Sampling and Analysis Plan in Support of
    Bioavailability Study for Midland (the "Plan"). The results of the Plan were provided to the MDEQ on March 22, 2007. On May 3, 2007, the MDEQ approved the GeoMorph® Pilot
    Site Characterization Report for the first six miles and approved this approach for the balance of the Tittabawassee River with some qualifications. On July 12, 2007, the MDEQ approved, with
    qualifications, the sampling for the next 11 miles of the Tittabawassee River.



    Interim Remedial Actions



    The
    Company has been working with the MDEQ to implement Interim Response Activities and Pilot Corrective Action Plans in specific areas in and along the Tittabawassee River, where elevated levels of
    dioxins and furans were found during the investigation of the first six miles of the river.



    Removal Actions



    On
    June 27, 2007, the U.S. Environmental Protection Agency ("EPA") sent a letter to the Company demanding that the Company enter into consent orders under Section 106 of the
    Comprehensive Environmental Response, Compensation, and Liability Act ("CERCLA") for three areas identified during investigation of the first six miles of the Tittabawassee




84










    River
    as areas for interim remedial actions under MDEQ oversight. The EPA sought a commitment that the Company immediately engage in remedial actions to remove soils and sediments. Three removal
    orders were negotiated and were signed on July 12, 2007, and the soil and sediment required to be removed by these orders has been completed. On November 15, 2007, the Company and the
    EPA entered into a CERCLA removal order requiring the Company to remove sediment in the Saginaw River where elevated concentrations were identified during investigative work conducted on the Saginaw
    River. The sediment removal work was completed in December 2007.





       The
Framework also contemplates that the Company, the State of Michigan and other federal and tribal governmental entities will negotiate the terms of an agreement or agreements to
resolve potential governmental claims against the Company related to historical off-site contamination associated with the Midland site. The Company and the governmental parties began to
meet in the fall of 2005 and entered into a Confidentiality Agreement in December 2005. The Company continues to conduct negotiations with the governmental parties under the Federal Alternative
Dispute Resolution Act.



       On
September 12, 2007, the EPA issued a press release reporting that they were withdrawing from the alternative dispute resolution process. On September 28, 2007, the
Company entered into a Funding and Participation Agreement with the natural resource damage trustees that addressed the Company's payment of past costs incurred by the trustees, payment of the costs
of a trustee coordinator and a process to review additional cooperative studies that the Company might agree to fund or conduct with the natural resource damage trustees.



       On
October 10, 2007, the EPA presented a Special Notice letter to the Company offering to enter into negotiations for an administrative order on consent for the Company to conduct
or fund a remedial investigation, a feasibility study, interim remedial actions and a remedial design for the Tittabawassee River, Saginaw River, and Saginaw Bay. The Company agreed to enter into
negotiations and submitted its Good Faith Offer to the EPA on December 10, 2007. On January 4, 2008, the EPA terminated negotiations under the Special Notice Letter.




       At
the end of 2007, the Company had an accrual for off-site corrective action of $5 million (included in the total accrued obligation of $322 million at
December 31, 2007) based on the range of activities that the Company proposed and discussed implementing with the MDEQ and which is set forth in the Framework. At December 31, 2006, the
accrual for off-site corrective action was $7 million (included in the total accrued obligation of $347 million at December 31, 2006).



Environmental Matters Summary




It is the opinion of the Company's management that the possibility is remote that costs in excess of those disclosed will have a material adverse impact on the Company's
consolidated financial statements.



This excerpt taken from the DOW 10-Q filed May 1, 2007.

Litigation

Breast Implant Matters

On May 15, 1995, Dow Corning Corporation (“Dow Corning”), in which the Company is a 50 percent shareholder, voluntarily filed for protection under Chapter 11 of the Bankruptcy Code to resolve litigation related to Dow Corning’s breast implant and other silicone medical products. On June 1, 2004, Dow Corning’s Joint Plan of Reorganization (the “Joint Plan”) became effective and Dow Corning emerged from bankruptcy. The Joint Plan contains release and injunction provisions resolving all tort claims brought against various entities, including the Company, involving Dow Corning’s breast implant and other silicone medical products.

To the extent not previously resolved in state court actions, cases involving Dow Corning’s breast implant and other silicone medical products filed against the Company were transferred to the U.S. District Court for the Eastern District of Michigan (the “District Court”) for resolution in the context of the Joint Plan. On October 6, 2005, all such cases then pending in the District Court against the Company were dismissed. Should cases involving Dow Corning’s breast implant and other silicone medical products be filed against the Company in the future, they will be accorded similar treatment. It is the opinion of the Company’s management that the possibility is remote that a resolution of all future cases will have a material adverse impact on the Company’s consolidated financial statements.

As part of the Joint Plan, Dow and Corning Incorporated have agreed to provide a credit facility to Dow Corning in an aggregate amount of $300 million. The Company’s share of the credit facility is $150 million and is subject to the terms and conditions stated in the Joint Plan. At March 31, 2007, no draws had been taken against the credit facility.

DBCP Matters

Numerous lawsuits have been brought against the Company and other chemical companies, both inside and outside of the United States, alleging that the manufacture, distribution or use of pesticides containing dibromochloropropane (“DBCP”) has caused personal injury and property damage, including contamination of groundwater. It is the opinion of the Company’s management that the possibility is remote that the resolution of such lawsuits will have a material adverse impact on the Company’s consolidated financial statements.

Environmental Matters

Accruals for environmental matters are recorded when it is probable that a liability has been incurred and the amount of the liability can be reasonably estimated, based on current law and existing technologies. At March 31, 2007, the Company had accrued obligations of $345 million for environmental remediation and restoration costs, including $33 million for the remediation of Superfund sites. This is management’s best estimate of the costs for remediation and restoration with respect to environmental matters for which the Company has accrued liabilities, although the ultimate cost with respect to these particular matters could range up to twice that amount. Inherent uncertainties exist in these estimates primarily due to unknown conditions, changing governmental regulations and legal standards regarding liability, and evolving technologies for handling site remediation and restoration. At December 31, 2006, the Company had accrued obligations of $347 million for environmental remediation and restoration costs, including $31 million for the remediation of Superfund sites.

On June 12, 2003, the Michigan Department of Environmental Quality (“MDEQ”) issued a Hazardous Waste Operating License (the “License”) to the Company’s Midland, Michigan manufacturing site (the “Midland site”), which included provisions requiring the Company to conduct an investigation to determine the nature and extent of off-site contamination in Midland area soils; Tittabawassee and Saginaw River sediment and floodplain soils; and Saginaw Bay. The License required the Company, by August 11, 2003, to propose a detailed Scope of Work for the off-site investigation for review and approval by the MDEQ. Revised Scopes of Work were approved by the MDEQ on October 18, 2005. Discussions between the Company and the MDEQ that occurred in 2004 and early 2005 regarding how to proceed with off-site corrective action under the License resulted in the execution of the Framework for an Agreement Between the State of Michigan and The Dow Chemical Company (the “Framework”) on January 20, 2005. The Framework committed the Company to take certain immediate interim remedial actions in the City of Midland and along the Tittabawassee River, conduct certain studies, and propose a remedial investigation work plan by the end of 2005. The interim remedial actions required by the Framework are currently underway. The Company submitted Remedial Investigation Work Plans for the City of Midland and for the Tittabawassee River on December 29, 2005. By letters dated March 2, 2006 and April 13, 2006, the MDEQ provided two Notices of Deficiency (“Notices”) to the Company regarding the Remedial Investigation Work Plans. The Company responded, as required, to some of the items in the Notices on May 1, 2006, and as required responded to the balance of the items and submitted revised Remedial Investigation Work Plans on December 1, 2006. On July 12, 2006, the MDEQ approved the sampling for the first six miles of the Tittabawassee River. On December 1, 2006, the MDEQ approved the Sampling and Analysis Plan in Support of Bioavailability Study for Midland (the “Plan”). The results of the Plan were

10




provided to the MDEQ on March 22, 2007. The MDEQ is requiring the Company to implement Interim Response Activities and Pilot Corrective Action Plans in specific areas in and along the Tittabawassee River, where elevated levels of dioxins and furans were found during the investigation of the first six miles of the river. Implementation will occur as soon as the MDEQ approves the final plans and schedules, and as necessary permits are issued. The Framework also contemplates that the Company, the State of Michigan and other federal and tribal governmental entities will negotiate the terms of an agreement or agreements to resolve potential governmental claims against the Company related to historical off-site contamination associated with the Midland site. The Company and the governmental parties began to meet in the fall of 2005 and entered into a Confidentiality Agreement in December 2005. At the end of 2006, the Company had an accrual for off-site corrective action of $7 million (included in the total accrued obligation of $347 million at December 31, 2006) based on the range of activities that the Company proposed and discussed implementing with the MDEQ and which is set forth in the Framework. At March 31, 2007, the accrual for off-site corrective action was $9 million (included in the total accrued obligation of $345 million at March 31, 2007).

It is the opinion of the Company’s management that the possibility is remote that costs in excess of those disclosed will have a material adverse impact on the Company’s consolidated financial statements.

Asbestos-Related Matters of Union Carbide Corporation

Union Carbide Corporation (“Union Carbide”), a wholly owned subsidiary of the Company, is and has been involved in a large number of asbestos-related suits filed primarily in state courts during the past three decades. These suits principally allege personal injury resulting from exposure to asbestos-containing products and frequently seek both actual and punitive damages. The alleged claims primarily relate to products that Union Carbide sold in the past, alleged exposure to asbestos-containing products located on Union Carbide’s premises, and Union Carbide’s responsibility for asbestos suits filed against a former Union Carbide subsidiary, Amchem Products, Inc. (“Amchem”). In many cases, plaintiffs are unable to demonstrate that they have suffered any compensable loss as a result of such exposure, or that injuries incurred in fact resulted from exposure to Union Carbide’s products.

Influenced by the bankruptcy filings of numerous defendants in asbestos-related litigation and the prospects of various forms of state and national legislative reform, the rate at which plaintiffs filed asbestos-related suits against various companies, including Union Carbide and Amchem, increased in 2001, 2002 and the first half of 2003. Since then, the rate of filing has significantly abated. Union Carbide expects more asbestos-related suits to be filed against Union Carbide and Amchem in the future, and will aggressively defend or reasonably resolve, as appropriate, both pending and future claims.

Based on a study completed by Analysis, Research & Planning Corporation (“ARPC”) in January 2003, Union Carbide increased its December 31, 2002 asbestos-related liability for pending and future claims for the 15-year period ending in 2017 to $2.2 billion, excluding future defense and processing costs. Since then, Union Carbide has compared current asbestos claim and resolution activity to the results of the most recent ARPC study at each balance sheet date to determine whether the accrual continues to be appropriate.

In November 2004, Union Carbide requested ARPC to review Union Carbide’s historical asbestos claim and resolution activity and determine the appropriateness of updating its January 2003 study. In January 2005, ARPC provided Union Carbide with a report summarizing the results of its study. At December 31, 2004, Union Carbide’s recorded asbestos-related liability for pending and future claims was $1.6 billion. Based on the low end of the range in the January 2005 study, Union Carbide’s recorded asbestos-related liability for pending and future claims at December 31, 2004 would be sufficient to resolve asbestos-related claims against Union Carbide and Amchem into 2019. As in its January 2003 study, ARPC did provide estimates for a longer period of time in its January 2005 study, but also reaffirmed its prior advice that forecasts for shorter periods of time are more accurate than those for longer periods of time.

In November 2005, Union Carbide requested ARPC to review Union Carbide’s 2005 asbestos claim and resolution activity and determine the appropriateness of updating its January 2005 study. In response to that request, ARPC reviewed and analyzed data through October 31, 2005. In January 2006, ARPC stated that an update of its study would not provide a more likely estimate of future events than the estimate reflected in its study of the previous year and, therefore, the estimate in that study remained applicable. Based on Union Carbide’s own review of the asbestos claim and resolution activity and ARPC’s response, Union Carbide determined that no change to the accrual was required. At December 31, 2005, Union Carbide’s asbestos-related liability for pending and future claims was $1.5 billion.

In November 2006, Union Carbide requested ARPC to review Union Carbide’s historical asbestos claim and resolution activity and determine the appropriateness of updating its January 2005 study. In response to that request, ARPC reviewed and analyzed data through October 31, 2006 and concluded that the experience from 2004 through 2006 was sufficient for the purpose of forecasting future filings and values of asbestos claims filed against Union Carbide and Amchem, and could be used in place of previous assumptions to update its January 2005 study. The resulting study, completed by ARPC in December 2006, stated that the undiscounted cost of resolving pending and future asbestos-related claims against Union Carbide and Amchem, excluding future defense and processing costs, through 2021 was estimated to be between approximately $1.2 billion and $1.5 billion. As in its January 2005 study, ARPC provided estimates for a longer period of

11




time in its December 2006 study, but also reaffirmed its prior advice that forecasts for shorter periods of time are more accurate than those for longer periods of time.

Based on ARPC’s December 2006 study and Union Carbide’s own review of the asbestos claim and resolution activity, Union Carbide decreased its asbestos-related liability for pending and future claims to $1.2 billion at December 31, 2006 which covers the 15-year period ending in 2021 (excluding future defense and processing costs). The reduction was $177 million and was shown as “Asbestos-related credit” in the consolidated statements of income for 2006. At December 31, 2006, approximately 25 percent of the recorded liability related to pending claims and approximately 75 percent related to future claims.

Based on Union Carbide’s review of 2007 activity, Union Carbide determined that no adjustment to the accrual was required at March 31, 2007. Union Carbide’s asbestos-related liability for pending and future claims was $1.2 billion at March 31, 2007. Approximately 28 percent of the recorded liability related to pending claims and approximately 72 percent related to future claims.

At December 31, 2002, Union Carbide increased the receivable for insurance recoveries related to its asbestos liability to $1.35 billion, substantially exhausting its asbestos product liability coverage. The insurance receivable related to the asbestos liability was determined by Union Carbide after a thorough review of applicable insurance policies and the 1985 Wellington Agreement, to which Union Carbide and many of its liability insurers are signatory parties, as well as other insurance settlements, with due consideration given to applicable deductibles, retentions and policy limits, and taking into account the solvency and historical payment experience of various insurance carriers. The Wellington Agreement and other agreements with insurers are designed to facilitate an orderly resolution and collection of Union Carbide’s insurance policies and to resolve issues that the insurance carriers may raise.

In September 2003, Union Carbide filed a comprehensive insurance coverage case, now proceeding in the Supreme Court of the State of New York, County of New York, seeking to confirm its rights to insurance for various asbestos claims and to facilitate an orderly and timely collection of insurance proceeds. This lawsuit was filed against insurers that are not signatories to the Wellington Agreement and/or do not otherwise have agreements in place with Union Carbide regarding their asbestos-related insurance coverage, in order to facilitate an orderly resolution and collection of such insurance policies and to resolve issues that the insurance carriers may raise. Although the lawsuit is continuing, through the end of the first quarter of 2007, Union Carbide had reached settlements with several of the carriers involved in this litigation.

Union Carbide’s receivable for insurance recoveries related to its asbestos liability was $484 million at March 31, 2007 and $495 million at December 31, 2006. At March 31, 2007 and December 31, 2006, all of the receivable for insurance recoveries was related to insurers that are not signatories to the Wellington Agreement and/or do not otherwise have agreements in place regarding their asbestos-related insurance coverage.

In addition to the receivable for insurance recoveries related to its asbestos liability, Union Carbide had receivables for defense and resolution costs submitted to insurance carriers for reimbursement as follows:

This excerpt taken from the DOW 10-K filed Feb 20, 2007.

Litigation

The Company is subject to legal proceedings and claims arising out of the normal course of business. The Company routinely assesses the likelihood of any adverse judgments or outcomes to these matters, as well as ranges of probable losses. A determination of the amount of the reserves required, if any, for these contingencies is made after thoughtful analysis of each known issue and an actuarial analysis of historical claims experience for incurred but not reported matters. Dow has an active risk management program consisting of numerous insurance policies secured from many carriers. These policies provide coverage that is utilized to minimize the impact, if any, of the legal proceedings. The required reserves may change in the future due to new developments in each matter. For further discussion, see Note J to the Consolidated Financial Statements.

This excerpt taken from the DOW 10-K filed Feb 17, 2006.

Litigation

The Company is subject to legal proceedings and claims arising out of the normal course of business. The Company routinely assesses the likelihood of any adverse judgments or outcomes to these matters, as well as ranges of probable losses. A determination of the amount of the reserves required, if any, for these contingencies is made after thoughtful analysis of each known issue and an actuarial analysis of historical claims experience for incurred but not reported matters. Dow has an active risk management program consisting of numerous insurance policies secured from many carriers. These policies provide coverage that is utilized to minimize the impact, if any, of the legal proceedings. The required reserves may change in the future due to new developments in each matter. For further discussion, see Note K to the Consolidated Financial Statements.

This excerpt taken from the DOW 10-Q filed May 2, 2005.

Litigation

        The Company is subject to legal proceedings and claims arising out of the normal course of business. The Company routinely assesses the likelihood of any adverse judgments or outcomes to these matters, as well as ranges of probable losses. A determination of the amount of the reserves required, if any, for these contingencies is made after thoughtful analysis of each known issue and an actuarial analysis of historical claims experience for incurred but not reported matters. Dow has an active risk management program consisting of numerous insurance policies secured from many carriers. These policies provide coverage that is utilized to minimize the impact, if any, of the legal proceedings. The required reserves may change in the future due to new developments in each matter. For further discussion, see Note G to the Consolidated Financial Statements.

This excerpt taken from the DOW 10-K filed Feb 18, 2005.

Litigation

The Company is subject to legal proceedings and claims arising out of the normal course of business. The Company routinely assesses the likelihood of any adverse judgments or outcomes to these matters, as well as ranges of probable losses. A determination of the amount of the reserves required, if any, for these contingencies is made after thoughtful analysis of each known issue and an actuarial analysis of historical claims experience for incurred but not reported matters. Dow has an active risk management program consisting of numerous insurance policies secured from many carriers. These policies provide coverage that is utilized to minimize the impact, if any, of the legal proceedings. The required reserves may change in the future due to new developments in each matter. For further discussion, see Note K to the Consolidated Financial Statements.

Wikinvest © 2006, 2007, 2008, 2009, 2010, 2011, 2012. Use of this site is subject to express Terms of Service, Privacy Policy, and Disclaimer. By continuing past this page, you agree to abide by these terms. Any information provided by Wikinvest, including but not limited to company data, competitors, business analysis, market share, sales revenues and other operating metrics, earnings call analysis, conference call transcripts, industry information, or price targets should not be construed as research, trading tips or recommendations, or investment advice and is provided with no warrants as to its accuracy. Stock market data, including US and International equity symbols, stock quotes, share prices, earnings ratios, and other fundamental data is provided by data partners. Stock market quotes delayed at least 15 minutes for NASDAQ, 20 mins for NYSE and AMEX. Market data by Xignite. See data providers for more details. Company names, products, services and branding cited herein may be trademarks or registered trademarks of their respective owners. The use of trademarks or service marks of another is not a representation that the other is affiliated with, sponsors, is sponsored by, endorses, or is endorsed by Wikinvest.