Manufacturing

 

We conduct our primary vaccine manufacturing operations at a multi-building campus on approximately 12.5 acres in Lansing, Michigan. To augment our existing manufacturing capabilities, we have constructed a new 50,000 square foot manufacturing facility on our Lansing campus. We have incurred costs of approximately $75 million through December 2008 for the building and associated capital equipment, as well as for validation and qualification activities required for regulatory approval and initiation of manufacturing. Although we have made progress on qualification and validation activities required for the commercial manufacture of BioThrax, we currently believe that we may use the facility for the manufacture of our rPA vaccine candidate in the event that we are awarded a development and procurement contract for our rPA vaccine candidate from HHS. We designed the plant to be campaignable subject to complying with appropriate change-over procedures, and we may seek permission from the FDA to use the facility for the manufacture of both BioThrax and our rPA vaccine candidate. In the event we do not get an award for the development and procurement of our rPA vaccine candidate, we intend to use the facility for the manufacture of BioThrax and potentially additional products.

 

We also own two buildings in Frederick, Maryland that are available to support our future manufacturing requirements. We have incurred costs of approximately $4 million through December 2008 related to initial engineering design and preliminary utility build out of one of these buildings. Moving forward with our plans for this building will be contingent on progress of our existing development programs or the acquisition of new product candidates. If we proceed with this project, we expect the costs to be substantial and to likely require external sources of funds to finance the project. However, we may elect to lease or sell one or both of these facilities to third parties.

 

We manufacture BioThrax at our facilities in Lansing, Michigan using well established vaccine manufacturing procedures. We currently rely on contract manufacturers and other third parties to manufacture the supplies for our other vaccine and therapeutic product candidates we require for our preclinical studies and clinical trials. We typically acquire these supplies on a purchase order basis. We anticipate that we may use our existing plant facilities in Michigan, including our recently commissioned pilot plant and our planned new plant facilities in Michigan to support both continued process development and the manufacture of clinical supplies of our product candidates. However, we also expect that we will continue to use third parties for production of preclinical and clinical supplies of some of our product candidates. We believe that manufacturing our products and product candidates independently will provide us cost savings and greater control over the manufacturing and regulatory approval and oversight processes as well as accelerate product development timelines and allow us to expand our base of manufacturing know-how that we can then apply to the development and manufacture of future product candidates.

 

Hollister-Stier Laboratories LLC performs the contract filling operation for BioThrax at its FDA-approved facility located in Spokane, Washington. Hollister-Stier has agreed to meet all of our firm purchase orders for contract filling of BioThrax based on a good faith annual estimate that we provide prior to each calendar year. In addition, Hollister-Stier has agreed to accommodate fill requests in excess of our annual estimate, subject to its available production capacity. Our contract with Hollister-Stier expires December 31, 2010. We have also entered into an agreement for contract filling operations with JHP Pharmaceuticals, LLC which must now be qualified and licensed by the FDA to fill BioThrax at its facilities.

 

Talecris Biotherapeutics has agreed to perform plasma fractionation and purification and contract filling of our anthrax immune globulin therapeutic candidate for preclinical, clinical and commercial use at its FDA-approved facilities located in Melville, New York and Clayton, North Carolina. Subject to limited exceptions, we have agreed to obtain all manufacturing requirements for our anthrax immune globulin therapeutic candidate exclusively from Talecris. While our agreement with Talecris remains in effect, Talecris has agreed not to market, sell or acquire any competing product that contains anthrax immune globulin as an active ingredient. We have agreed to pay Talecris royalties on net sales on a country-by-country basis for commercial product manufactured by Talecris under the contract. Our contract with Talecris expires December 31, 2014. We have the option to extend the term for an additional five-year period upon notice to Talecris at least 12 months prior to the expiration of the initial term. After three years following initiation of commercial manufacturing, either party may terminate the contract upon two years’ advance notice. We have the right to terminate the contract, under specified circumstances, if we discontinue our production of anthrax immune globulin source plasma or the development of our anthrax immune globulin therapeutic candidate. Talecris is in the process of being acquired by CSL. We do not anticipate that this acquisition will have an adverse impact on our relationship with Talecris.

21


We used a contract manufacturer for the supply of Typhella for the Phase I and Phase II trials in Vietnam, the United Kingdom and the U.S. We may use a different contract manufacturer for the supply of this vaccine candidate for future trials. We are in the process of identifying a new contract manufacturer for our monoclonal anthrax antibody product candidate.

 

We also expect that we will rely on third parties for a portion of the manufacturing process for commercial supplies of other product candidates that we successfully develop, including fermentation for some of our vaccine product candidates and contract fill and finish operations. The manufacture of biologic products and the scale-up process necessary to manufacture quantities of product sufficient for commercial launch are complex. If we are unable to secure relationships with third party contract manufacturers that can provide sufficient supplies for the commercial launch of our product candidates on commercially attractive terms, our ability to capture market share may be adversely affected.

 

In addition, we rely on third parties for supplies and raw materials used for the production of BioThrax and our product candidates. We purchase these supplies and raw materials from various suppliers in quantities adequate to meet our needs. We believe that there are adequate alternative sources of supply available for most of our raw materials if any of our current suppliers were unable to meet our needs.

 

Manufacturing

 

We conduct our primary vaccine manufacturing operations at a multi-building campus on approximately 12.5 acres in Lansing, Michigan. To augment our existing manufacturing capabilities, we have constructed a new 50,000 square foot manufacturing facility on our Lansing campus. We have incurred costs of approximately $75 million through December 2008 for the building and associated capital equipment, as well as for validation and qualification activities required for regulatory approval and initiation of manufacturing. Although we have made progress on qualification and validation activities required for the commercial manufacture of BioThrax, we currently believe that we may use the facility for the manufacture of our rPA vaccine candidate in the event that we are awarded a development and procurement contract for our rPA vaccine candidate from HHS. We designed the plant to be campaignable subject to complying with appropriate change-over procedures, and we may seek permission from the FDA to use the facility for the manufacture of both BioThrax and our rPA vaccine candidate. In the event we do not get an award for the development and procurement of our rPA vaccine candidate, we intend to use the facility for the manufacture of BioThrax and potentially additional products.

 

We also own two buildings in Frederick, Maryland that are available to support our future manufacturing requirements. We have incurred costs of approximately $4 million through December 2008 related to initial engineering design and preliminary utility build out of one of these buildings. Moving forward with our plans for this building will be contingent on progress of our existing development programs or the acquisition of new product candidates. If we proceed with this project, we expect the costs to be substantial and to likely require external sources of funds to finance the project. However, we may elect to lease or sell one or both of these facilities to third parties.

 

We manufacture BioThrax at our facilities in Lansing, Michigan using well established vaccine manufacturing procedures. We currently rely on contract manufacturers and other third parties to manufacture the supplies for our other vaccine and therapeutic product candidates we require for our preclinical studies and clinical trials. We typically acquire these supplies on a purchase order basis. We anticipate that we may use our existing plant facilities in Michigan, including our recently commissioned pilot plant and our planned new plant facilities in Michigan to support both continued process development and the manufacture of clinical supplies of our product candidates. However, we also expect that we will continue to use third parties for production of preclinical and clinical supplies of some of our product candidates. We believe that manufacturing our products and product candidates independently will provide us cost savings and greater control over the manufacturing and regulatory approval and oversight processes as well as accelerate product development timelines and allow us to expand our base of manufacturing know-how that we can then apply to the development and manufacture of future product candidates.

 

Hollister-Stier Laboratories LLC performs the contract filling operation for BioThrax at its FDA-approved facility located in Spokane, Washington. Hollister-Stier has agreed to meet all of our firm purchase orders for contract filling of BioThrax based on a good faith annual estimate that we provide prior to each calendar year. In addition, Hollister-Stier has agreed to accommodate fill requests in excess of our annual estimate, subject to its available production capacity. Our contract with Hollister-Stier expires December 31, 2010. We have also entered into an agreement for contract filling operations with JHP Pharmaceuticals, LLC which must now be qualified and licensed by the FDA to fill BioThrax at its facilities.

 

Talecris Biotherapeutics has agreed to perform plasma fractionation and purification and contract filling of our anthrax immune globulin therapeutic candidate for preclinical, clinical and commercial use at its FDA-approved facilities located in Melville, New York and Clayton, North Carolina. Subject to limited exceptions, we have agreed to obtain all manufacturing requirements for our anthrax immune globulin therapeutic candidate exclusively from Talecris. While our agreement with Talecris remains in effect, Talecris has agreed not to market, sell or acquire any competing product that contains anthrax immune globulin as an active ingredient. We have agreed to pay Talecris royalties on net sales on a country-by-country basis for commercial product manufactured by Talecris under the contract. Our contract with Talecris expires December 31, 2014. We have the option to extend the term for an additional five-year period upon notice to Talecris at least 12 months prior to the expiration of the initial term. After three years following initiation of commercial manufacturing, either party may terminate the contract upon two years’ advance notice. We have the right to terminate the contract, under specified circumstances, if we discontinue our production of anthrax immune globulin source plasma or the development of our anthrax immune globulin therapeutic candidate. Talecris is in the process of being acquired by CSL. We do not anticipate that this acquisition will have an adverse impact on our relationship with Talecris.

21


We used a contract manufacturer for the supply of Typhella for the Phase I and Phase II trials in Vietnam, the United Kingdom and the U.S. We may use a different contract manufacturer for the supply of this vaccine candidate for future trials. We are in the process of identifying a new contract manufacturer for our monoclonal anthrax antibody product candidate.

 

We also expect that we will rely on third parties for a portion of the manufacturing process for commercial supplies of other product candidates that we successfully develop, including fermentation for some of our vaccine product candidates and contract fill and finish operations. The manufacture of biologic products and the scale-up process necessary to manufacture quantities of product sufficient for commercial launch are complex. If we are unable to secure relationships with third party contract manufacturers that can provide sufficient supplies for the commercial launch of our product candidates on commercially attractive terms, our ability to capture market share may be adversely affected.

 

In addition, we rely on third parties for supplies and raw materials used for the production of BioThrax and our product candidates. We purchase these supplies and raw materials from various suppliers in quantities adequate to meet our needs. We believe that there are adequate alternative sources of supply available for most of our raw materials if any of our current suppliers were unable to meet our needs.

 

Manufacturing



 



We conduct our primary vaccine manufacturing operations at a multi-building campus on approximately 12.5 acres in Lansing, Michigan. To augment our existing manufacturing capabilities, we have constructed a new 50,000 square foot manufacturing facility on our Lansing campus. We have incurred costs of approximately $75 million through December 2008 for the building and associated capital equipment, as well as for validation and qualification activities required for regulatory approval and initiation of manufacturing. Although we have made progress on qualification and validation activities required for the commercial manufacture of BioThrax, we currently believe that we may use the facility for the manufacture of our rPA vaccine candidate in the event that we are awarded a development and procurement contract for our rPA vaccine candidate from HHS. We designed the plant to be campaignable
subject to complying with appropriate change-over procedures, and we may seek permission from the FDA to use the facility for the manufacture of both BioThrax and our rPA vaccine candidate. In the event we do not get an award for the development and procurement of our rPA vaccine candidate, we intend to use the facility for the manufacture of BioThrax and potentially additional products.



 



We also own two buildings in Frederick, Maryland that are available to support our future manufacturing requirements. We have incurred costs of approximately $4 million through December 2008 related to initial engineering design and preliminary utility build out of one of these buildings. Moving forward with our plans for this building will be contingent on progress of our existing development programs or the acquisition of new product candidates. If we proceed with this project, we expect the costs to be substantial and to likely require external sources of funds to finance the project. However, we may elect to lease or sell one or both of these facilities to third parties.



 



We manufacture BioThrax at our facilities in Lansing, Michigan using well established vaccine manufacturing procedures. We currently rely on contract manufacturers and other third parties to manufacture the supplies for our other vaccine and therapeutic product candidates we require for our preclinical studies and clinical trials. We typically acquire these supplies on a purchase order basis. We anticipate that we may use our existing plant facilities in Michigan, including our recently commissioned pilot plant and our planned new plant facilities in Michigan to support both continued process development and the manufacture of clinical supplies of our product candidates. However, we also expect that we will continue to use third parties for production of preclinical and clinical supplies of some of our product candidates. We believe that manufacturing our products and product candidates
independently will provide us cost savings and greater control over the manufacturing and regulatory approval and oversight processes as well as accelerate product development timelines and allow us to expand our base of manufacturing know-how that we can then apply to the development and manufacture of future product candidates.



 



Hollister-Stier Laboratories LLC performs the contract filling operation for BioThrax at its FDA-approved facility located in Spokane, Washington. Hollister-Stier has agreed to meet all of our firm purchase orders for contract filling of BioThrax based on a good faith annual estimate that we provide prior to each calendar year. In addition, Hollister-Stier has agreed to accommodate fill requests in excess of our annual estimate, subject to its available production capacity. Our contract with Hollister-Stier expires December 31, 2010. We have also entered into an agreement for contract filling operations with JHP Pharmaceuticals, LLC which must now be qualified and licensed by the FDA to fill BioThrax at its facilities.



 



Talecris Biotherapeutics has agreed to perform plasma fractionation and purification and contract filling of our anthrax immune globulin therapeutic candidate for preclinical, clinical and commercial use at its FDA-approved facilities located in Melville, New York and Clayton, North Carolina. Subject to limited exceptions, we have agreed to obtain all manufacturing requirements for our anthrax immune globulin therapeutic candidate exclusively from Talecris. While our agreement with Talecris remains in effect, Talecris has agreed not to market, sell or acquire any competing product that contains anthrax immune globulin as an active ingredient. We have agreed to pay Talecris royalties on net sales on a country-by-country basis for commercial product manufactured by Talecris under the contract. Our contract with Talecris expires December 31, 2014. We have the option to extend the term for an
additional five-year period upon notice to Talecris at least 12 months prior to the expiration of the initial term. After three years following initiation of commercial manufacturing, either party may terminate the contract upon two years’ advance notice. We have the right to terminate the contract, under specified circumstances, if we discontinue our production of anthrax immune globulin source plasma or the development of our anthrax immune globulin therapeutic candidate. Talecris is in the process of being acquired by CSL. We do not anticipate that this acquisition will have an adverse impact on our relationship with Talecris.




21











We used a contract manufacturer for the supply of Typhella for the Phase I and Phase II trials in Vietnam, the United Kingdom and the U.S. We may use a different contract manufacturer for the supply of this vaccine candidate for future trials. We are in the process of identifying a new contract manufacturer for our monoclonal anthrax antibody product candidate.



 



We also expect that we will rely on third parties for a portion of the manufacturing process for commercial supplies of other product candidates that we successfully develop, including fermentation for some of our vaccine product candidates and contract fill and finish operations. The manufacture of biologic products and the scale-up process necessary to manufacture quantities of product sufficient for commercial launch are complex. If we are unable to secure relationships with third party contract manufacturers that can provide sufficient supplies for the commercial launch of our product candidates on commercially attractive terms, our ability to capture market share may be adversely affected.



 



In addition, we rely on third parties for supplies and raw materials used for the production of BioThrax and our product candidates. We purchase these supplies and raw materials from various suppliers in quantities adequate to meet our needs. We believe that there are adequate alternative sources of supply available for most of our raw materials if any of our current suppliers were unable to meet our needs.



 



Manufacturing



 



We conduct our primary vaccine manufacturing operations at a multi-building campus on approximately 12.5 acres in Lansing, Michigan. To augment our existing manufacturing capabilities, we have constructed a new 50,000 square foot manufacturing facility on our Lansing campus. We have incurred costs of approximately $75 million through December 2008 for the building and associated capital equipment, as well as for validation and qualification activities required for regulatory approval and initiation of manufacturing. Although we have made progress on qualification and validation activities required for the commercial manufacture of BioThrax, we currently believe that we may use the facility for the manufacture of our rPA vaccine candidate in the event that we are awarded a development and procurement contract for our rPA vaccine candidate from HHS. We designed the plant to be campaignable
subject to complying with appropriate change-over procedures, and we may seek permission from the FDA to use the facility for the manufacture of both BioThrax and our rPA vaccine candidate. In the event we do not get an award for the development and procurement of our rPA vaccine candidate, we intend to use the facility for the manufacture of BioThrax and potentially additional products.



 



We also own two buildings in Frederick, Maryland that are available to support our future manufacturing requirements. We have incurred costs of approximately $4 million through December 2008 related to initial engineering design and preliminary utility build out of one of these buildings. Moving forward with our plans for this building will be contingent on progress of our existing development programs or the acquisition of new product candidates. If we proceed with this project, we expect the costs to be substantial and to likely require external sources of funds to finance the project. However, we may elect to lease or sell one or both of these facilities to third parties.



 



We manufacture BioThrax at our facilities in Lansing, Michigan using well established vaccine manufacturing procedures. We currently rely on contract manufacturers and other third parties to manufacture the supplies for our other vaccine and therapeutic product candidates we require for our preclinical studies and clinical trials. We typically acquire these supplies on a purchase order basis. We anticipate that we may use our existing plant facilities in Michigan, including our recently commissioned pilot plant and our planned new plant facilities in Michigan to support both continued process development and the manufacture of clinical supplies of our product candidates. However, we also expect that we will continue to use third parties for production of preclinical and clinical supplies of some of our product candidates. We believe that manufacturing our products and product candidates
independently will provide us cost savings and greater control over the manufacturing and regulatory approval and oversight processes as well as accelerate product development timelines and allow us to expand our base of manufacturing know-how that we can then apply to the development and manufacture of future product candidates.



 



Hollister-Stier Laboratories LLC performs the contract filling operation for BioThrax at its FDA-approved facility located in Spokane, Washington. Hollister-Stier has agreed to meet all of our firm purchase orders for contract filling of BioThrax based on a good faith annual estimate that we provide prior to each calendar year. In addition, Hollister-Stier has agreed to accommodate fill requests in excess of our annual estimate, subject to its available production capacity. Our contract with Hollister-Stier expires December 31, 2010. We have also entered into an agreement for contract filling operations with JHP Pharmaceuticals, LLC which must now be qualified and licensed by the FDA to fill BioThrax at its facilities.



 



Talecris Biotherapeutics has agreed to perform plasma fractionation and purification and contract filling of our anthrax immune globulin therapeutic candidate for preclinical, clinical and commercial use at its FDA-approved facilities located in Melville, New York and Clayton, North Carolina. Subject to limited exceptions, we have agreed to obtain all manufacturing requirements for our anthrax immune globulin therapeutic candidate exclusively from Talecris. While our agreement with Talecris remains in effect, Talecris has agreed not to market, sell or acquire any competing product that contains anthrax immune globulin as an active ingredient. We have agreed to pay Talecris royalties on net sales on a country-by-country basis for commercial product manufactured by Talecris under the contract. Our contract with Talecris expires December 31, 2014. We have the option to extend the term for an
additional five-year period upon notice to Talecris at least 12 months prior to the expiration of the initial term. After three years following initiation of commercial manufacturing, either party may terminate the contract upon two years’ advance notice. We have the right to terminate the contract, under specified circumstances, if we discontinue our production of anthrax immune globulin source plasma or the development of our anthrax immune globulin therapeutic candidate. Talecris is in the process of being acquired by CSL. We do not anticipate that this acquisition will have an adverse impact on our relationship with Talecris.




21











We used a contract manufacturer for the supply of Typhella for the Phase I and Phase II trials in Vietnam, the United Kingdom and the U.S. We may use a different contract manufacturer for the supply of this vaccine candidate for future trials. We are in the process of identifying a new contract manufacturer for our monoclonal anthrax antibody product candidate.



 



We also expect that we will rely on third parties for a portion of the manufacturing process for commercial supplies of other product candidates that we successfully develop, including fermentation for some of our vaccine product candidates and contract fill and finish operations. The manufacture of biologic products and the scale-up process necessary to manufacture quantities of product sufficient for commercial launch are complex. If we are unable to secure relationships with third party contract manufacturers that can provide sufficient supplies for the commercial launch of our product candidates on commercially attractive terms, our ability to capture market share may be adversely affected.



 



In addition, we rely on third parties for supplies and raw materials used for the production of BioThrax and our product candidates. We purchase these supplies and raw materials from various suppliers in quantities adequate to meet our needs. We believe that there are adequate alternative sources of supply available for most of our raw materials if any of our current suppliers were unable to meet our needs.



 



These excerpts taken from the EBS 10-K filed Mar 13, 2008.
Manufacturing

 

We conduct our primary vaccine manufacturing operations at a multi-building campus on approximately 12.5 acres in Lansing, Michigan. To augment our existing manufacturing capabilities, we have constructed a new 50,000 square foot manufacturing facility on our Lansing campus. We substantially completed construction of this facility in 2006, and are currently conducting validation and qualification activities required for regulatory approval. This new facility is a large scale manufacturing plant that we can use to produce multiple fermentation based vaccine products, subject to complying with appropriate change-over procedures.

 

We also own two buildings in Frederick, Maryland that are available to support our future manufacturing requirements. We are also performing initial engineering designs and preliminary utility build out of one of these buildings. We may elect to lease all or a substantial portion of, or sell, one of these facilities to third parties.

 


We manufacture BioThrax at our facilities in Lansing, Michigan using well established vaccine manufacturing procedures. We currently rely on contract manufacturers and other third parties to manufacture the supplies for our other vaccine and therapeutic product candidates we require for our preclinical studies and clinical trials. We typically acquire these supplies on a purchase order basis. We anticipate that we may use our existing plant facilities in Michigan, including our recently commissioned pilot plant and, when completed and approved, our planned new plant facilities in Michigan to support both continued process development and the manufacture of clinical supplies of our product candidates. However, we also expect that we will continue to use third parties for production of preclinical and clinical supplies of some of our product candidates. We believe that manufacturing our products and product candidates independently will provide us cost savings and greater control over the manufacturing and regulatory approval and oversight processes accelerate product development timelines and allow us to expand our base of manufacturing know-how that we can then apply to the development and manufacture of future product candidates.

 

Hollister-Stier Laboratories LLC performs the contract filling operation for BioThrax vials at its FDA-approved facility located in Spokane, Washington. Hollister-Stier has agreed to meet all of our firm purchase orders for contract filling of BioThrax based on a good faith annual estimate that we provide prior to each calendar year. In addition, Hollister-Stier has agreed to accommodate fill requests in excess of our annual estimate, subject to its available production capacity. Our contract with Hollister-Stier expires December 31, 2010.

 

Talecris Biotherapeutics has agreed to perform plasma fractionation and purification and contract filling of our anthrax immune globulin therapeutic candidate at its FDA-approved facilities located in Melville, New York and Clayton, North Carolina. Subject to limited exceptions, we have agreed to obtain all manufacturing requirements for our anthrax immune globulin therapeutic candidate exclusively from Talecris. While our agreement with Talecris remains in effect, Talecris has agreed not to market, sell or acquire any competing product that contains anthrax immune globulin as an active ingredient. Talecris has agreed to perform plasma fractionation and purification and contract filling for the manufacture of our anthrax immune globulin therapeutic candidate for preclinical or animal studies, for clinical use or for non-clinical testing required for clinical trials and for commercial sale. We have agreed to pay Talecris royalties on net sales on a country-by-country basis for commercial product manufactured by Talecris under the contract. Our contract with Talecris expires December 31, 2013 or five years following initiation of commercial manufacturing. We have the option to extend the term for an additional five-year period upon notice to Talecris at least 12 months prior to the expiration of the initial term. After three years following initiation of commercial manufacturing, either party may terminate the contract upon two years’ advance notice. We have the right to terminate the contract, under specified circumstances, if we discontinue our production of anthrax immune globulin source plasma or the development of our anthrax immune globulin therapeutic candidate.

 

We used a contract manufacturer for the supply of our typhoid vaccine candidate for the Phase I and Phase II trials in Vietnam. We may use a different contract manufacturer for the supply of this vaccine candidate for the Phase II study in India, for the Phase III clinical supply, and for commercial manufacturing. We also plan to use a contract manufacturer for the clinical and commercial supplies of our group B streptococcus vaccine candidate.

 

We also expect that we will rely on third parties for a portion of the manufacturing process for commercial supplies of other product candidates that we successfully develop, including fermentation for some of our vaccine product candidates and contract fill and finish operations. The manufacture of immunobiotic products and the scale-up process necessary to manufacture quantities of immunobiotics sufficient for commercial launch are complex. If we are unable to secure a relationship with third party contract manufacturers that can provide sufficient supplies for the commercial launch of our product candidates, our ability to capture market share may be adversely affected.

 

In addition, we rely on third parties for supplies and raw materials used for the production of BioThrax and our immunobiotic product candidates. We purchase these supplies and raw materials from various suppliers in quantities adequate to meet our needs. We believe that there are adequate alternative sources of supply available if any of our current suppliers were unable to meet our needs.

 

Manufacturing



 



We conduct our primary vaccine manufacturing operations at a multi-building campus on approximately 12.5 acres in Lansing, Michigan. To augment our existing manufacturing capabilities, we have constructed a new 50,000 square foot manufacturing facility on our Lansing campus. We substantially completed construction of this facility in 2006, and are currently conducting validation and qualification activities required for regulatory approval. This new facility is a large scale manufacturing plant that we can use to produce multiple fermentation based vaccine products, subject to complying with appropriate change-over procedures.



 



We also own two buildings in Frederick, Maryland that are available to support our future manufacturing requirements. We are also performing initial engineering designs and preliminary utility build out of one of these buildings. We may elect to lease all or a substantial portion of, or sell, one of these facilities to third parties.



 










We manufacture BioThrax at our facilities in Lansing, Michigan using well established vaccine manufacturing procedures. We currently rely on contract manufacturers and other third parties to manufacture the supplies for our other vaccine and therapeutic product candidates we require for our preclinical studies and clinical trials. We typically acquire these supplies on a purchase order basis. We anticipate that we may use our existing plant facilities in Michigan, including our recently commissioned pilot plant and, when completed and approved, our planned new plant facilities in Michigan to support both continued process development and the manufacture of clinical supplies of our product candidates. However, we also expect that we will continue to use third parties for production of preclinical and clinical supplies of some of our product candidates. We believe that manufacturing our
products and product candidates independently will provide us cost savings and greater control over the manufacturing and regulatory approval and oversight processes accelerate product development timelines and allow us to expand our base of manufacturing know-how that we can then apply to the development and manufacture of future product candidates.



 



Hollister-Stier Laboratories LLC performs the contract filling operation for BioThrax vials at its FDA-approved facility located in Spokane, Washington. Hollister-Stier has agreed to meet all of our firm purchase orders for contract filling of BioThrax based on a good faith annual estimate that we provide prior to each calendar year. In addition, Hollister-Stier has agreed to accommodate fill requests in excess of our annual estimate, subject to its available production capacity. Our contract with Hollister-Stier expires December 31, 2010.



 



Talecris Biotherapeutics has agreed to perform plasma fractionation and purification and contract filling of our anthrax immune globulin therapeutic candidate at its FDA-approved facilities located in Melville, New York and Clayton, North Carolina. Subject to limited exceptions, we have agreed to obtain all manufacturing requirements for our anthrax immune globulin therapeutic candidate exclusively from Talecris. While our agreement with Talecris remains in effect, Talecris has agreed not to market, sell or acquire any competing product that contains anthrax immune globulin as an active ingredient.
Talecris has agreed to perform plasma fractionation and purification and contract filling for the manufacture of our anthrax immune globulin therapeutic candidate for preclinical or animal studies, for clinical use or for non-clinical testing required for clinical trials and for commercial sale. We have agreed to pay Talecris royalties on net sales on a country-by-country basis for commercial product manufactured by Talecris under the contract. Our contract with Talecris expires December 31, 2013 or five years following initiation of commercial manufacturing. We have the option to extend the term for an additional five-year period upon notice to Talecris at least 12 months prior to the expiration of the initial term. After three years following initiation of commercial manufacturing, either party may terminate the contract upon two years’ advance notice. We have the right to terminate
the contract, under specified circumstances, if we discontinue our production of anthrax immune globulin source plasma or the development of our anthrax immune globulin therapeutic candidate.



 



We used a contract manufacturer for the supply of our typhoid vaccine candidate for the Phase I and Phase II trials in Vietnam. We may use a different contract manufacturer for the supply of this vaccine candidate for the Phase II study in India, for the Phase III clinical supply, and for commercial manufacturing. We also plan to use a contract manufacturer for the clinical and commercial supplies of our group B streptococcus vaccine candidate.



 



We also expect that we will rely on third parties for a portion of the manufacturing process for commercial supplies of other product candidates that we successfully develop, including fermentation for some of our vaccine product candidates and contract fill and finish operations. The manufacture of immunobiotic products and the scale-up process necessary to manufacture quantities of immunobiotics sufficient for commercial launch are complex. If we are unable to secure a relationship with third party contract manufacturers that can provide sufficient supplies for the commercial launch of our product candidates, our ability to capture market share may be adversely affected.



 



In addition, we rely on third parties for supplies and raw materials used for the production of BioThrax and our immunobiotic product candidates. We purchase these supplies and raw materials from various suppliers in quantities adequate to meet our needs. We believe that there are adequate alternative sources of supply available if any of our current suppliers were unable to meet our needs.



 



These excerpts taken from the EBS 10-K filed Mar 10, 2008.
Manufacturing

 

We conduct our primary vaccine manufacturing operations at a multi-building campus on approximately 12.5 acres in Lansing, Michigan. To augment our existing manufacturing capabilities, we have constructed a new 50,000 square foot manufacturing facility on our Lansing campus. We substantially completed construction of this facility in 2006, and are currently conducting validation and qualification activities required for regulatory approval. This new facility is a large scale manufacturing plant that we can use to produce multiple fermentation based vaccine products, subject to complying with appropriate change-over procedures.

 

We also own two buildings in Frederick, Maryland that are available to support our future manufacturing requirements. We are also performing initial engineering designs and preliminary utility build out of one of these buildings. We may elect to lease all or a substantial portion of, or sell, one of these facilities to third parties.

 


We manufacture BioThrax at our facilities in Lansing, Michigan using well established vaccine manufacturing procedures. We currently rely on contract manufacturers and other third parties to manufacture the supplies for our other vaccine and therapeutic product candidates we require for our preclinical studies and clinical trials. We typically acquire these supplies on a purchase order basis. We anticipate that we may use our existing plant facilities in Michigan, including our recently commissioned pilot plant and, when completed and approved, our planned new plant facilities in Michigan to support both continued process development and the manufacture of clinical supplies of our product candidates. However, we also expect that we will continue to use third parties for production of preclinical and clinical supplies of some of our product candidates. We believe that manufacturing our products and product candidates independently will provide us cost savings and greater control over the manufacturing and regulatory approval and oversight processes accelerate product development timelines and allow us to expand our base of manufacturing know-how that we can then apply to the development and manufacture of future product candidates.

 

Hollister-Stier Laboratories LLC performs the contract filling operation for BioThrax vials at its FDA-approved facility located in Spokane, Washington. Hollister-Stier has agreed to meet all of our firm purchase orders for contract filling of BioThrax based on a good faith annual estimate that we provide prior to each calendar year. In addition, Hollister-Stier has agreed to accommodate fill requests in excess of our annual estimate, subject to its available production capacity. Our contract with Hollister-Stier expires December 31, 2010.

 

Talecris Biotherapeutics has agreed to perform plasma fractionation and purification and contract filling of our anthrax immune globulin therapeutic candidate at its FDA-approved facilities located in Melville, New York and Clayton, North Carolina. Subject to limited exceptions, we have agreed to obtain all manufacturing requirements for our anthrax immune globulin therapeutic candidate exclusively from Talecris. While our agreement with Talecris remains in effect, Talecris has agreed not to market, sell or acquire any competing product that contains anthrax immune globulin as an active ingredient. Talecris has agreed to perform plasma fractionation and purification and contract filling for the manufacture of our anthrax immune globulin therapeutic candidate for preclinical or animal studies, for clinical use or for non-clinical testing required for clinical trials and for commercial sale. We have agreed to pay Talecris royalties on net sales on a country-by-country basis for commercial product manufactured by Talecris under the contract. Our contract with Talecris expires December 31, 2013 or five years following initiation of commercial manufacturing. We have the option to extend the term for an additional five-year period upon notice to Talecris at least 12 months prior to the expiration of the initial term. After three years following initiation of commercial manufacturing, either party may terminate the contract upon two years’ advance notice. We have the right to terminate the contract, under specified circumstances, if we discontinue our production of anthrax immune globulin source plasma or the development of our anthrax immune globulin therapeutic candidate.

 

We used a contract manufacturer for the supply of our typhoid vaccine candidate for the Phase I and Phase II trials in Vietnam. We may use a different contract manufacturer for the supply of this vaccine candidate for the Phase II study in India, for the Phase III clinical supply, and for commercial manufacturing. We also plan to use a contract manufacturer for the clinical and commercial supplies of our group B streptococcus vaccine candidate.

 

We also expect that we will rely on third parties for a portion of the manufacturing process for commercial supplies of other product candidates that we successfully develop, including fermentation for some of our vaccine product candidates and contract fill and finish operations. The manufacture of immunobiotic products and the scale-up process necessary to manufacture quantities of immunobiotics sufficient for commercial launch are complex. If we are unable to secure a relationship with third party contract manufacturers that can provide sufficient supplies for the commercial launch of our product candidates, our ability to capture market share may be adversely affected.

 

In addition, we rely on third parties for supplies and raw materials used for the production of BioThrax and our immunobiotic product candidates. We purchase these supplies and raw materials from various suppliers in quantities adequate to meet our needs. We believe that there are adequate alternative sources of supply available if any of our current suppliers were unable to meet our needs.

 

Manufacturing



 



We conduct our primary vaccine manufacturing operations at a multi-building campus on approximately 12.5 acres in Lansing, Michigan. To augment our existing manufacturing capabilities, we have constructed a new 50,000 square foot manufacturing facility on our Lansing campus. We substantially completed construction of this facility in 2006, and are currently conducting validation and qualification activities required for regulatory approval. This new facility is a large scale manufacturing plant that we can use to produce multiple fermentation based vaccine products, subject to complying with appropriate change-over procedures.



 



We also own two buildings in Frederick, Maryland that are available to support our future manufacturing requirements. We are also performing initial engineering designs and preliminary utility build out of one of these buildings. We may elect to lease all or a substantial portion of, or sell, one of these facilities to third parties.



 










We manufacture BioThrax at our facilities in Lansing, Michigan using well established vaccine manufacturing procedures. We currently rely on contract manufacturers and other third parties to manufacture the supplies for our other vaccine and therapeutic product candidates we require for our preclinical studies and clinical trials. We typically acquire these supplies on a purchase order basis. We anticipate that we may use our existing plant facilities in Michigan, including our recently commissioned pilot plant and, when completed and approved, our planned new plant facilities in Michigan to support both continued process development and the manufacture of clinical supplies of our product candidates. However, we also expect that we will continue to use third parties for production of preclinical and clinical supplies of some of our product candidates. We believe that manufacturing our
products and product candidates independently will provide us cost savings and greater control over the manufacturing and regulatory approval and oversight processes accelerate product development timelines and allow us to expand our base of manufacturing know-how that we can then apply to the development and manufacture of future product candidates.



 



Hollister-Stier Laboratories LLC performs the contract filling operation for BioThrax vials at its FDA-approved facility located in Spokane, Washington. Hollister-Stier has agreed to meet all of our firm purchase orders for contract filling of BioThrax based on a good faith annual estimate that we provide prior to each calendar year. In addition, Hollister-Stier has agreed to accommodate fill requests in excess of our annual estimate, subject to its available production capacity. Our contract with Hollister-Stier expires December 31, 2010.



 



Talecris Biotherapeutics has agreed to perform plasma fractionation and purification and contract filling of our anthrax immune globulin therapeutic candidate at its FDA-approved facilities located in Melville, New York and Clayton, North Carolina. Subject to limited exceptions, we have agreed to obtain all manufacturing requirements for our anthrax immune globulin therapeutic candidate exclusively from Talecris. While our agreement with Talecris remains in effect, Talecris has agreed not to market, sell or acquire any competing product that contains anthrax immune globulin as an active ingredient.
Talecris has agreed to perform plasma fractionation and purification and contract filling for the manufacture of our anthrax immune globulin therapeutic candidate for preclinical or animal studies, for clinical use or for non-clinical testing required for clinical trials and for commercial sale. We have agreed to pay Talecris royalties on net sales on a country-by-country basis for commercial product manufactured by Talecris under the contract. Our contract with Talecris expires December 31, 2013 or five years following initiation of commercial manufacturing. We have the option to extend the term for an additional five-year period upon notice to Talecris at least 12 months prior to the expiration of the initial term. After three years following initiation of commercial manufacturing, either party may terminate the contract upon two years’ advance notice. We have the right to terminate
the contract, under specified circumstances, if we discontinue our production of anthrax immune globulin source plasma or the development of our anthrax immune globulin therapeutic candidate.



 



We used a contract manufacturer for the supply of our typhoid vaccine candidate for the Phase I and Phase II trials in Vietnam. We may use a different contract manufacturer for the supply of this vaccine candidate for the Phase II study in India, for the Phase III clinical supply, and for commercial manufacturing. We also plan to use a contract manufacturer for the clinical and commercial supplies of our group B streptococcus vaccine candidate.



 



We also expect that we will rely on third parties for a portion of the manufacturing process for commercial supplies of other product candidates that we successfully develop, including fermentation for some of our vaccine product candidates and contract fill and finish operations. The manufacture of immunobiotic products and the scale-up process necessary to manufacture quantities of immunobiotics sufficient for commercial launch are complex. If we are unable to secure a relationship with third party contract manufacturers that can provide sufficient supplies for the commercial launch of our product candidates, our ability to capture market share may be adversely affected.



 



In addition, we rely on third parties for supplies and raw materials used for the production of BioThrax and our immunobiotic product candidates. We purchase these supplies and raw materials from various suppliers in quantities adequate to meet our needs. We believe that there are adequate alternative sources of supply available if any of our current suppliers were unable to meet our needs.



 



This excerpt taken from the EBS 10-K filed Mar 27, 2007.
Manufacturing

 

We manufacture BioThrax at our facilities in Lansing, Michigan using well established vaccine manufacturing procedures. We currently rely on contract manufacturers and other third parties to manufacture the supplies of our immunobiotic product candidates that we require for preclinical and clinical development. We acquire these supplies on a purchase order basis. We anticipate that we may use our existing plant facilities in Michigan, including our recently commissioned pilot plant, and, when completed and approved, our planned new plant facilities in Michigan and Maryland to support both continued process development and the manufacture of clinical supplies of our product candidates. However, we also expect that we will continue to use third parties for production of preclinical and clinical supplies of some of our product candidates. We believe that manufacturing our products and product candidates independently will provide us cost savings and greater control over the manufacturing and regulatory approval and oversight process, accelerate product development timelines and allow us to expand our base of manufacturing know-how that we can then apply to the development and manufacture of future product candidates.

Hollister-Stier Laboratories LLC performs the contract filling operation for BioThrax vials at its FDA-approved facility located in Spokane, Washington. Hollister-Stier has agreed to meet all of our firm purchase orders for contract filling of BioThrax based on a good faith annual estimate that we provide prior to each calendar year. In addition, Hollister-Stier has agreed to accommodate fill requests in excess of our annual estimate subject to its available production capacity. Our contract with Hollister-Stier expires December 31, 2007. The contract also can be terminated by either party following an uncured material breach by the other party.

 

20


Talecris Biotherapeutics has agreed to perform plasma fractionation and purification and contract filling relating to the manufacture of our anthrax immune globulin candidate at its FDA-approved facilities located in Melville, New York and Clayton, North Carolina. Subject to limited exceptions, we have agreed to obtain all of our anthrax immune globulin requirements exclusively from Talecris. While our agreement with Talecris remains in effect, Talecris has agreed not to market, sell or acquire any competing product that contains anthrax immune globulin as an active ingredient. Talecris has agreed to perform plasma fractionation and purification and contract filling for the manufacture of our anthrax immune globulin candidate for preclinical or animal studies, for clinical use or for non-clinical testing required for clinical trials and for commercial sale. We have agreed to pay Talecris royalties on net sales on a country-by-country basis for commercial product manufactured by Talecris under the contract. Our contract with Talecris expires December 31, 2013 or five years following initiation of commercial manufacturing. We have the option to extend the term for an additional five-year period upon notice to Talecris at least 12 months prior to the expiration of the initial term. After three years following initiation of commercial manufacturing, either party may terminate the contract upon two years’ advance notice. The contract can also be terminated by either party following an uncured material breach by the other party. We have the right to terminate the contract, under specified circumstances, if we discontinue our production of anthrax immune globulin source plasma or the development of our anthrax immune globulin candidate.

We expect to engage one or more third parties to perform the plasma fractionation and purification processes and contract filling for our botulinum immune globulin candidate.

We used a contract manufacturer for the supply of our typhoid vaccine candidate for the Phase I studies and Phase II trial in Vietnam. We may use a different contract manufacturer for the supply of this vaccine candidate for the Phase II study in India, for Phase III clinical supply, and for commercial manufacturing.

We also plan to use a contract manufacturer for the clinical and commercial supplies of our Group B Streptococcus vaccine candidate.

We also expect that we will rely on third parties for a portion of the manufacturing process for commercial supplies of other product candidates that we successfully develop, including fermentation for some of our vaccine product candidates and contract fill and finish operations. The manufacture of immunobiotic products and the scale-up process necessary to manufacture quantities of immunobiotics sufficient for commercial launch are complex. If we are unable to secure a relationship with third party contract manufacturers that can provide sufficient supplies for the commercial launch of our product candidates, our ability to capture market share may be adversely affected.

In addition, we rely on third parties for supplies and raw materials used for the production of BioThrax and our immunobiotic product candidates. We purchase these supplies and raw materials from various suppliers in quantities adequate to meet our needs. We believe that there are adequate alternative sources of supply available if any of our current suppliers were unable to meet our needs.

To augment our existing manufacturing capabilities, we are constructing a new 50,000 square foot manufacturing facility on our Lansing, Michigan campus. We expect the construction of the facility to cost approximately $75 million, including approximately $55 million for the building and associated capital equipment, with the balance related to validation and qualification activities required for regulatory approval and initiation of manufacturing. We incurred approximately $37 million for these purposes through 2006. We substantially completed construction of this facility in 2006, and expect to conduct installation, validation and qualification activities required for regulatory approval during 2007 and 2008. We are constructing this new facility as a large-scale manufacturing plant that we can use to produce multiple vaccine products, subject to complying with appropriate change-over procedures. We anticipate that we will initiate large scale manufacturing of BioThrax for commercial sale at the new facility in 2008. Our plans assume that the FDA will not require us to complete a human bridging trial demonstrating that BioThrax manufactured at our new facility is bioequivalent to BioThrax manufactured at our existing facility. We currently expect to rely on non-clinical studies for these purposes. However, the FDA has not approved our plan to rely on non-clinical studies without conducting a human bridging trial and may not do so. If the FDA requires us to conduct a human bridging trial, the initiation of large scale manufacturing of BioThrax for commercial sale at our new facility will be delayed and we will incur additional unanticipated costs.

We also own two buildings in Frederick, Maryland that are available to support our future manufacturing requirements. We incurred approximately $1 million related to initial engineering design and preliminary utility build out for these facilities during 2006. Because we are in the preliminary planning stages of our Frederick build out, we cannot reasonably estimate the timing and costs that will be necessary to complete this project. If we proceed with this project, we expect the costs to be substantial and to likely require external sources of funds to finance the project. We may elect to lease all or a substantial portion of one of these facilities to third parties.

Wikinvest © 2006, 2007, 2008, 2009, 2010, 2011, 2012. Use of this site is subject to express Terms of Service, Privacy Policy, and Disclaimer. By continuing past this page, you agree to abide by these terms. Any information provided by Wikinvest, including but not limited to company data, competitors, business analysis, market share, sales revenues and other operating metrics, earnings call analysis, conference call transcripts, industry information, or price targets should not be construed as research, trading tips or recommendations, or investment advice and is provided with no warrants as to its accuracy. Stock market data, including US and International equity symbols, stock quotes, share prices, earnings ratios, and other fundamental data is provided by data partners. Stock market quotes delayed at least 15 minutes for NASDAQ, 20 mins for NYSE and AMEX. Market data by Xignite. See data providers for more details. Company names, products, services and branding cited herein may be trademarks or registered trademarks of their respective owners. The use of trademarks or service marks of another is not a representation that the other is affiliated with, sponsors, is sponsored by, endorses, or is endorsed by Wikinvest.