|
|
![]() | ![]() | ![]() | ![]() |
| |||||||||
These excerpts taken from the FPU 10-K filed Mar 20, 2009. Legal Proceedings We use or have used several properties with contamination that have pending or threatened environmental litigation. We are in the process of investigating and assessing this litigation. We intend to vigorously defend our rights in this litigation. We have insurance and rate relief to cover losses or expenses incurred as a result of this litigation. We believe all future contamination assessment and remedial costs, legal fees and other related expenses would not exceed the combined sum of any insurance proceeds received and any rate relief granted. Legal Proceedings We use or have used several properties with contamination that have pending or threatened environmental litigation. We are in the process of investigating and assessing this litigation. We intend to vigorously defend our rights in this litigation. We have insurance and rate relief to cover losses or expenses incurred as a result of this litigation. We believe all future contamination assessment and remedial costs, legal fees and other related expenses would not exceed the combined sum of any insurance proceeds received and any rate relief granted. Legal Proceedings We use or have used several properties with contamination that have pending or threatened environmental litigation. We are in the process of investigating and assessing this litigation. We intend to vigorously defend our rights in this litigation. We have insurance and rate relief to cover losses or expenses incurred as a result of this litigation. We believe all future contamination assessment and remedial costs, legal fees and other related expenses would not exceed the combined sum of any insurance proceeds received and any rate relief granted. This excerpt taken from the FPU 10-K filed Mar 25, 2008. Item 3. Legal Proceedings We use or have used several properties with contamination that have pending or threatened environmental litigation. We are in the process of investigating and assessing this litigation. We intend to vigorously defend our rights in this litigation. We have insurance and rate relief to cover losses or expenses incurred as a result of this litigation. We believe all future contamination assessment and remedial costs, legal fees and other related expenses would not exceed the combined sum of any insurance proceeds received and any rate relief granted.
West Palm Beach Site The Company is currently evaluating remedial options to respond to environmental impacts to soil and groundwater at and in the immediate vicinity of a parcel of property owned by it in West Palm Beach, Florida upon which the Company previously operated a gasification plant. The Company entered into a Consent Order with the FDEP effective April 8, 1991, that requires the Company to delineate the extent of soil and groundwater impacts associated with the prior operation of the gasification plant and to remediate such soil and groundwater impacts, if necessary. The Company completed field investigations for the contamination assessment task in October 2006. Thereafter, the Company retained an engineering consultant, the RETEC Group, Inc. (RETEC), to perform a feasibility study to evaluate appropriate remedies for the site to respond to the reported soil and groundwater impacts. On November 30, 2006, RETEC transmitted a feasibility study to the Company and FDEP. The feasibility study evaluated a wide range of remedial alternatives. The total costs for the remedies evaluated in the feasibility study ranged from a low of $2.8 million to a high of $54.6 million. Based on the likely acceptability of proven remedial technologies described in the feasibility study and implemented at similar sites, consulting/remediation costs are projected to range from $4.6 million to $17.9 million. This range of costs covers such remedies as in situ solidification for the deeper impacts, excavation of surficial soils, installation of a barrier wall with a permeable biotreatment zone, or some combination of these remedies. By letter dated May 7, 2007, FDEP provided its comments to the feasibility study, the substance of which was discussed at a meeting between the Company and FDEP on September 14, 2007. A response to the comments was submitted by the Company to FDEP on October 31, 2007. We are currently awaiting FDEP's comments to the response.
Based on the information provided in the feasibility study, the remaining legal fees are currently projected to be approximately $295,000. Consulting and remediation costs are projected to range from $4.6 million to $17.9 million. Thus, the Company's total probable legal and cleanup costs for the West Palm Beach site are currently projected to range from $4.9 million to $18.2 million. Sanford Site The Company owns a parcel of property located in Sanford, Florida, upon which a gasification plant was operated prior to the Companys acquisition of the property. Following discovery of soil and groundwater impacts on the property, the Company has participated with four former owners and operators of the gasification plant in the funding of numerous investigations of the extent of the impacts and the identification of an appropriate remedy. On or about March 25, 1998, the Company executed an Administrative Order on Consent (AOC) with the four former owners and operators (collectively, the Group) and the EPA. This AOC obligated the Group to implement a Remedial Investigation/Feasibility Study (RI/FS) and to pay EPA's past and future oversight costs. The Group also entered into a Participation Agreement and an Escrow Agreement on or about April 13, 1998 (WFS Participation Agreement). Work under the RI/FS AOC and RI/FS Participation Agreement is now complete and the Company has no further obligations under either agreement.
In late September 2006, EPA sent a Special Notice Letter to the Company, notifying it, and the other responsible parties at the site (Florida Power Corporation, Florida Power & Light Company, Atlanta Gas Light Company, and the City of Sanford, Florida, collectively with FPUC, "the Sanford Group"), of EPA's selection of a final remedy for OU1 (soils), OU2 (groundwater), and OU3 (sediments) for the site. The total estimated remediation costs for the Sanford gasification plant site are now projected to be $12.9 million. The Sanford Group was further advised that EPA was willing to negotiate a consent decree with the Sanford Group to provide for the implementation of the final remedy approved by EPA for the site. In January 2007, the Company and other members of the Sanford Group signed a Third Participation Agreement, which provides for funding the final remedy approved by EPA for the site. The Company's share of remediation costs under the Third Participation Agreement is set at a maximum of $650,000, providing the total cost of the final remedy does not exceed $13 million. At present, it is not anticipated that the total cost will exceed $13 million. If it does, the Sanford Group members have agreed to negotiate in good faith at such time that it appears that the total cost will exceed $13 million for the allocation of the additional cost. The Company has advised the other members of the Sanford Group that the Company is unwilling at this time to agree to pay any sum in excess of the $650,000 committed by the Company in the Third Participation Agreement.
On June 26, 2007, the Sanford Group transmitted to EPA a Consent Decree signed by all Group Members, providing for the implementation by the Sanford Group of the remedy selected by EPA for the site. The consent decree is currently being circulated within EPA and the United States Department of Justice for execution by those parties. Thereafter, the consent decree will be lodged with the federal court in Orlando, Florida. Following a public comment period, it is anticipated that the federal court will enter the consent decree. The Sanford Group will then be obligated to implement the remedy approved by EPA for the site.
Remaining legal fees/costs are currently projected to be approximately $77,000. The Company's obligation under the Third Participation Agreement is $650,000. Thus, the Company's total probable legal and cleanup costs for the Sanford site are currently projected to be approximately $727,000. Pensacola Site We are the prior owner/operator of the former Pensacola gasification plant, located in Pensacola, Florida. Following notification on October 5, 1990 that FDEP had determined that we were one of several responsible parties for any environmental impacts associated with the former gasification plant site, we entered into cost sharing agreements with three other responsible parties providing for the funding of certain contamination assessment activities at the site. Consulting and remediation costs are projected to be $26,000 and legal fees are projected to be $4,000, for total probable costs for the Pensacola site of $30,000. Key West Site From 1927-1938, we owned and operated a gasification plant in Key West, Florida. The plant discontinued operations in the late 1940s; the property on which the plant was located is currently used for a propane gas distribution business. In March 1993, a Preliminary Contamination Assessment Report (PCAR) was prepared by a consultant jointly retained by the current site owner and the Company and was delivered to FDEP. The PCAR reported that very limited soil and groundwater impacts were present at the site. By letter dated December 20, 1993, FDEP notified us that the site did not warrant further "CERCLA consideration and a Site Evaluation Accomplished disposition is recommended." FDEP then referred the matter to its Marathon office for consideration of whether additional work would be required by FDEP's district office under Florida law. Consulting and remediation costs are projected to be $83,000 and legal fees are projected to be $10,000, for total probable costs for the Key West site of $93,000. This excerpt taken from the FPU 10-K filed Mar 19, 2007. Item 3. Legal Proceedings In our operations, we currently use or have used several contamination sites that have pending or threatened environmental litigation. We are in the process of investigating and assessing this litigation. We intend to vigorously defend our rights in this litigation. We have insurance and rate relief to cover losses or expenses incurred as a result of this litigation. We believe all future contamination assessment and remedial costs, legal fees and other related expenses would not exceed the combined sum of any insurance proceeds received and any rate relief granted. West Palm Beach Site We are currently evaluating remedial options to respond to environmental impacts to soil and groundwater at and in the immediate vicinity of a parcel of property we own in West Palm Beach, Florida. We previously operated a gasification plant at this site. We entered into a Consent Order with the FDEP effective April 8, 1991. This requires us to delineate the extent of soil and groundwater impacts associated with the prior operation of the gasification plant and to remediate such soil and groundwater impacts, if necessary. We have submitted numerous reports to FDEP describing the results of soil and groundwater sampling conducted at the site. We completed the delineation of soil and groundwater impacts at the site in October 2006. An engineering consultant performed a feasibility study to evaluate appropriate remedies for the site. The feasibility study was transmitted to FDEP on November 30, 2006. The feasibility study evaluated a wide range of remedial alternatives based on criteria provided by applicable laws and regulations. The total costs for the remedies evaluated in the feasibility study ranged from a low of $2.8 million to a high of $54.6 million. Based on the likely acceptability of proven remedial technologies described in the feasibility study and implemented at similar sites, consulting/remediation costs to address the impacts now characterized at the West Palm Beach site are projected to range from $4.6 million to $17.9 million. This range of costs covers such remedies as in situ solidification for deeper soil impacts, excavation of superficial soil impacts, installation of a barrier wall with a permeable biotreatment zone (PBZ), monitored natural attenuation of dissolved impacts in groundwater (MNA) or some combination of these remedies. The feasibility study proposed a remedy of superficial soil excavation, and installation of a hanging barrier wall with PBZ and MNA, the cost of which is projected to range from $4.6 million to $9.9 million. Prior to FDEP's approval of a final remedy for the site, we are unable to determine, to a reasonable degree of certainty, the complete extent or cost of remedial action that may be required. As of December 31, 2006, and subject to the limitations described above, remediation costs (including attorneys' fees and costs) for this site are projected to range from approximately $4.8 million to $18 million. Sanford Site We own a parcel of property located in Sanford, Florida, upon which a gasification plant was operated prior to our acquisition of the property. Following discovery of soil and groundwater impacts on the property, we have participated with four former owners and operators of the gasification plant in the funding of numerous investigations of the extent of the impacts and the identification of an appropriate remedy. On or about March 25, 1998, we executed an Administrative Order on Consent (AOC) with the four former owners and operators (Group) and the United States Environmental Protection Agency (EPA) that obligated the Group to implement a Remedial Investigation/Feasibility Study (RI/FS) and to pay EPA's past and future oversight costs. The Group also entered into a Participation Agreement and an Escrow Agreement on or about April 13, 1998 (WFS Participation Agreement). Work under the RI/FS AOC and RI/FS Participation Agreement is now complete and we have no further obligations under either document. In late September 2006, EPA sent us a Special Notice Letter, notifying us of EPAs selection of a final remedy for OU1 (soils), OU2 (groundwater), and OU3 (sediments), and giving the other Group members and us sixty (60) days within which to submit a "good faith offer" to EPA to provide for implementation of the selected remedies. The Special Notice Letter included an Amended Record of Decision (ROD) for OU1 (the ROD for OU1 was amended to account for a significant increase in the volume of off-site soil impacts and a change in the selected remedy), the original ROD for OU2, and a ROD for OU3. The total estimated remediation costs for the Sanford Gasification Plant Site are now projected to be $12.5 million. On November 30, 2006, we, along with the Group, submitted to EPA a good faith offer to implement the approved remedies as set forth in the RODs for OU1 through OU3. In January, we, along with the other members of the Group signed a Third Participation Agreement, which provides for funding the remediation work specified in the RODs for OU1 through OU3 and supercedes and replaces the Second Participation Agreement. Our share of remediation costs under the Third Participation Agreement is set at 5% of a maximum of $13 million or $650,000. At present, it is not anticipated that the total cost of remediation will exceed $13 million. If it does, the Group members have agreed to negotiate in good faith to allocate the excess costs at such time that it reasonably appears that the total remediation costs will exceed $13 million. In any such event, we do not expect our share of such additional costs to be greater than 5% and our share of such additional costs may be less than 5%. Our future legal costs and expenses and our share future remediation expenses for this site are currently projected to be approximately $710,000. Pensacola Site We are the prior owner/operator of the former Pensacola gasification plant, located in Pensacola, Florida. Following notification on October 5, 1990 that FDEP had determined that we were one of several responsible parties for any environmental impacts associated with the former gasification plant site, we entered into cost sharing agreements with three other responsible parties providing for the funding of certain contamination assessment activities at the site. Following field investigations performed on behalf of the responsible parties, on July 16, 1997, FDEP approved a final remedy for the site that provides for annual sampling of selected monitoring wells. Such annual sampling has been undertaken at the site since 1998. Our share of these costs is less than $2,000 annually or a total cost of $27,000. In March 1999, EPA requested site access in order to undertake an Expanded Site Inspection (ESI). The ESI was completed by EPA's contractor in 1999 and an ESI Report was transmitted to us in January 2000. The ESI Report recommends additional work at the site. The responsible parties met with FDEP on February 7, 2000 to discuss EPA's plans for the site. In February 2000, EPA indicated preliminarily that it will defer management of the site to FDEP; however, as of December 31, 2006, we have not received any written confirmation from EPA or FDEP regarding this matter. Prior to receipt of EPA's written determination regarding site management, we are unable to determine whether additional fieldwork or site remediation will be required by EPA and, if so, the scope or costs of such work. Key West Site From 1927-1938, we owned and operated a gasification plant in Key West, Florida. The plant discontinued operations in the late 1940s; the property on which the plant was located is currently used for a propane gas distribution business. In March 1993, a Preliminary Contamination Assessment Report (PCAR) was prepared by a consultant jointly retained by the current site owner and us and was delivered to FDEP. The PCAR reported that very limited soil and groundwater impacts were present at the site. By letter dated December 20, 1993, FDEP notified us that the site did not warrant further "CERCLA consideration and a Site Evaluation Accomplished disposition is recommended." FDEP then referred the matter to its Marathon office for consideration of whether additional work would be required by FDEP's district office under Florida law. As of December 31, 2006, we have received no further communication from FDEP with respect to the site. At this time, we are unable to determine whether additional fieldwork will be required by FDEP and, if so, the scope or costs of such work. In 1999, we received an estimate from our consultant that additional costs to assess and remediate the reported impacts would be approximately $166,000. Assuming the current owner shared in such costs according to the allocation agreed upon by the parties for the PCAR, our share would be approximately $83,000. This excerpt taken from the FPU 10-K filed Mar 20, 2006. Item 3. Legal Proceedings In our operations, we currently use or have used several contamination sites that have pending or threatened environmental litigation. We are in the process of investigating and assessing this litigation. We intend to vigorously defend our rights in this litigation. We have insurance and rate relief to cover any losses or expenses incurred as a result of this litigation. We believe all future contamination assessment and remedial costs, legal fees and other related expenses would not exceed the combined sum of any insurance proceeds received and any rate relief granted.
West Palm Beach Site We are currently evaluating remedial options to respond to environmental impacts to soil and groundwater at and in the immediate vicinity of a parcel of property we own in West Palm Beach, Florida. We previously operated a gasification plant at this site. We entered into a Consent Order with the Florida Department of Environmental Protection (FDEP) effective April 8, 1991. This requires us to delineate the extent of soil and groundwater impacts associated with the prior operation of the gasification plant and to remediate such soil and groundwater impacts, if necessary. We have submitted numerous reports to FDEP describing the results of soil and groundwater sampling conducted at the site. On November 29, 2005, our consultant submitted a status report of additional sampling to FDEP, in which the consultant recommended that we should be permitted to proceed with a feasibility study to evaluate appropriate remedies for the site. To date, FDEP has not responded to the status report. Sanford Site We own a parcel of property located in Sanford, Florida. A gasification plant was operated on this site prior to our acquisition of the property. Following discovery of soil and groundwater impacts on the property, we participated with four former owners and operators of the gasification plant in the funding of numerous investigations of the extent of the impacts and the identification of an appropriate remedy. On or about March 25, 1998, we executed an Administrative Order on Consent (AOC) with the four former owners and operators (Group) and the United States Environmental Protection Agency (EPA) that obligated the Group to implement a Remedial Investigation and Feasibility Study (RI/FS) task and to pay EPAs past and future oversight costs for the RI/FS. The Group also entered into a Participation Agreement and an Escrow Agreement on or about April 13, 1998 (RI/FS Participation Agreement). These agreements governed the manner and means by which all parties were to satisfy their respective obligations under the AOC for the RI/FS task. We agreed to pay approximately 13.7% of the cost for the RI/FS. Our share of the cost of these tasks was previously paid in full. The RI/FS Participation Agreement was amended on September 18, 2003, to authorize an additional $400,000 to be incurred by the Group to complete the ecological risk assessment and cover EPA oversight costs for the RI/FS. We paid our share ($54,822) of the additional RI/FS funding in November 2003. On July 5, 2000, EPA issued a Record of Decision (ROD) approving the final remedial action for contaminated soils at the site (OU1 Remedy). The initial estimated cost for the OU1 Remedy described in the ROD ranges from $5.6 million to $5.8 million. On June 12, 2001, EPA issued a ROD approving the final remedial action for contaminated groundwater
at the site (OU2 Remedy). The present worth cost estimate for the OU2 Remedy is $320,252. We are a party to the Second Participation Agreement entered into by members of the Group on August 1, 2000, as amended through June 19, 2002 (RD/RA Participation Agreement). The RD/RA Participation Agreement provides for funding the remedial design/remedial action (RD/RA) task for OU1 and OU2. Our share of costs for implementation of the RD/RA task for OU1 and OU2, including the pre-remedial design fieldwork is 10.5%, providing the total cost of the RD/RA task, including the pre-remedial design fieldwork, does not exceed $6 million. Pensacola site We are the prior owner and operator of the former Pensacola gasification plant, located in Pensacola, Florida. Following notification on October 5, 1990 that FDEP had determined that we were one of several responsible parties for any environmental impacts associated with the former gasification plant site, we entered into cost sharing agreements with three other responsible parties providing for the funding of certain contamination assessment activities at the site. Following field investigations performed on behalf of the responsible parties, on July 16, 1997, FDEP approved a final remedy for the site that provides for annual sampling of selected monitoring wells. Such annual sampling has been undertaken at the site since 1998. Our share of these costs is less than $2,000 annually. In March 1999, EPA requested site access in order to undertake an Expanded Site Inspection (ESI). The ESI was completed by EPAs contractor in 1999 and an ESI Report was transmitted to us in January 2000. The ESI Report recommends additional work at the site. The responsible parties met with FDEP on February 7, 2000 to discuss EPAs plans for the site. In February 2000, EPA indicated preliminarily that it would defer management of the site to FDEP; however, as of this date, we have not received any written confirmation from EPA or FDEP regarding this matter. Key West site From 1927 to 1938, we owned and operated a gasification plant in Key West, Florida. The plant discontinued operations in the late 1940s; the property on which the plant was located is currently used for a propane gas distribution business. In March 1993, a Preliminary Contamination Assessment Report (PCAR) was prepared by a consultant jointly retained by the current site owner and us and was delivered to FDEP. The PCAR reported that very limited soil and groundwater impacts were present at the site. By letter dated December 20, 1993, FDEP notified us that the site did not warrant further "CERCLA consideration and a Site Evaluation Accomplished (SEA) disposition is recommended." FDEP then referred the matter to its Marathon office for consideration of whether additional work would be required by FDEP's district office under Florida law. To date, we have received no further communication from FDEP with respect to the site.
This excerpt taken from the FPU 10-K filed Mar 24, 2005. Item 3. Legal Proceedings. FPU currently uses or used in the past, in connection with its operations, several contamination sites with respect to which there is now pending or threatened environmental litigation and is in the process of investigating and assessing that litigation. FPU intends to vigorously defend its rights in this litigation. FPU has insurance to cover a portion of any losses or expenses incurred as a result of this litigation and plans to apply to the FPSC for rate relief on any uninsured losses or expenses. FPU believes that the aggregate of all future contamination assessment and remedial costs, legal fees and other related expenses will not exceed the combined sum of any insurance proceeds received and any rate relief granted. The natural gas rate relief, granted in late 2004, included provisions for recovery of $9.1 million for environmental liabilities. FPU is subject to federal and state legislation with respect to soil, groundwater and employee health and safety matters and to environmental regulations issued by the Florida Department of Environmental Protection (FDEP), the United States Environmental Protection Agency (EPA) and other federal and state agencies. Except as discussed below, FPU does not expect to incur material future expenditures for compliance with existing environmental laws and regulations. West Palm Beach Site The Company is currently evaluating remedial options to respond to environmental impacts to soil and groundwater at and in the immediate vicinity of a parcel of property owned by it in West Palm Beach, Florida upon which the Company previously operated a gasification plant. The Company entered into a Consent Order with the FDEP effective April 8, 1991, that requires FPU to delineate the extent of soil and groundwater impacts associated with the prior operation of the gasification plant and to remediate such soil and groundwater impacts, if necessary. Numerous reports have been submitted by FPU to FDEP, describing the results of soil and groundwater sampling conducted at the site. A Supplemental Contamination Assessment Report Addendum ("SCARA") was submitted to FDEP in December 2001, summarizing the results of past investigations and providing the results of additional fieldwork conducted in 2001, in response to comments received previously from FDEP. On September 29, 2003, FPU submitted to FDEP a Comprehensive Soil and Groundwater Assessment Report which described the results of substantial additional fieldwork undertaken in 2003 to respond to FDEP's comments to the SCARA. Following a meeting with FDEP in October 2004 to discuss FDEP's comments to the Comprehensive Soil and Groundwater Assessment Report, FPU agreed to implement additional fieldwork that was initiated in December 2004 and will be completed by Spring 2005. The cost of the additional fieldwork is projected to be approximately $50,000. Based on the likely acceptability of proven remedial technologies implemented at similar sites in other states, consulting/remediation costs to address the impacts now characterized at the West Palm Beach site are projected to range from $10.0-$15.0 million. This range of costs covers such remedies as in situ solidification, slurry wall and cap containment, air sparge/soil vapor extraction, or in situ chemical oxidation, or some combination of these remedies. Prior to FDEP's approval of a final remedy for the site, we are unable to determine the complete extent or cost of remedial action which may be required. Remediation costs (including attorneys' fees and costs) for this site are currently projected to range from $10.2 million to $15.2 million. Sanford Site FPU owns a parcel of property located in Sanford, Florida, upon which a gasification plant was operated prior to FPU's acquisition of the property. Following discovery of soil and groundwater impacts on the property, FPU has participated with four former owners and operators of the gasification plant in the funding of numerous investigations of the extent of the impacts and the identification of an appropriate remedy. On or about March 25, 1998, FPU executed an Administrative Order on Consent ("AOC") with the four former owners and operators (collectively, the "Group") and the EPA that obligated the Group to implement a Remedial Investigation/Feasibility Study ("RI/FS") task and to pay EPA's past and future oversight costs for the RI/FS. The Group also entered into a Participation Agreement and an Escrow Agreement on or about April 13, 1998 ("RI/FS Participation Agreement"). These agreements governed the manner and means by which all parties were to satisfy their respective obligations under the AOC for the RI/FS task. FPU agreed to pay approximately 13.7% of the cost for the RI/FS. Fieldwork for the RI/FS was initiated in 1998. A final RI report was submitted to EPA in July 1999. The Group also submitted a Baseline Risk Assessment to EPA in January 2000, including an Ecological Risk Assessment ("ERA"). FPU's share of the cost of these tasks was previously paid in full. The RI/FS Participation Agreement was amended on September 18, 2003, to authorize an additional $400,000 to be incurred by the Group to complete the ecological risk assessment and cover EPA oversight costs for the RI/FS. FPU paid its share of $54,822.40 of the additional RI/FS funding in November 2003. On July 5, 2000, EPA issued a Record of Decision ("ROD") approving the final remedial action for contaminated soils at the site ("OU1 Remedy"). The initial estimated cost for the OU1 Remedy described in the ROD ranges from $5.6 million to $5.8 million. On June 12, 2001, EPA issued a ROD approving the final remedial action for contaminated groundwater at the site ("OU2 Remedy"). The present worth cost estimate for the OU2 Remedy is $320,252. FPU is a party to the Second Participation Agreement entered into by members of the Group on August 1, 2000, as amended through June 19, 2002. The Second Participation Agreement provides for funding the remedial design/remedial action task for OU1 and OU2. FPU's share of costs for implementation of the remedial design/remedial action task for OU1 and OU2, including the pre-remedial design fieldwork described below, is 10.5%, providing the total cost of the remedial design/remedial action task, including the pre-remedial design fieldwork, does not exceed $6.0 million. Pre-remedial design fieldwork was performed in 2002-2003 to assist in the design of the final remedy for OU1 and OU2. Based on the pre-remedial design fieldwork, it is now anticipated that the final cost of the remedy for OU1 and OU2 will significantly exceed the $6.0 million combined estimate provided in the RODs for OU1 and OU2. In 2002, FPU paid $210,178 to the Escrow Agent pursuant to a first call for funds under the Second Participation Agreement. FPU's remaining obligation under the Second Participation Agreement for the remedial design/remedial action task for OU1 and OU2 is $420,356. This assumes FPU's total allocated share remains no greater than 10.5% of $6.0 million, as currently set forth in the Second Participation Agreement, as amended through June 19, 2002. FPU has notified Group members that FPU will oppose any effort by the Group to increase FPU's share of total remedial costs above 10.5% of the current $6.0 million cap, since the increased remedial cost is due to the discovery of additional impacted soils on property not owned by FPU. In addition, FPU will be obligated to pay for a share of EPA's oversight costs for the remedial design/remedial action task for OU1 and OU2. It is anticipated that FPU's share of these costs will be 10.5% of EPA's total bill. It is not possible at this time to calculate, to a reasonable degree of certainty, EPA's oversight cost. However, based on other similar sites, it would be reasonable to assume such oversight cost to be approximately 20% of the projected remedial design/remedial action costs for OU1 and OU2. Assuming FPU's maximum exposure for the remedial design/remedial action cost for OUI and OU2 does not exceed 10.5% of $6.0 million, a reasonable estimate of FPU's share of oversight cost would be approximately $125,000. Prior to EPA's approval of a final remedy for the site, and the completion of negotiations among members of the Group on FPU's maximum allocated share, we are unable to determine the complete extent of FPU's remaining exposure at this site. Based on the existing Second Participation Agreement, FPU's remaining exposure for the remedial design/remedial action task for OU1 and OU2, EPA's oversight costs, and FPU's attorneys' fees and costs, is projected to be approximately $705,000. Pensacola site FPU is the prior owner/operator of the former Pensacola gasification plant, located at the intersection of Cervantes Street and the Louisville and Nashville (CSX) Railroad line, Pensacola, Florida. Following notification on October 5, 1990, that FDEP had determined that FPU was one of several responsible parties for any environmental impacts associated with the former gasification plant site, FPU entered into cost sharing agreements with three other responsible parties providing for the funding of certain contamination assessment activities at the site. A final report describing the results of contamination assessment activities at the site was submitted to FDEP in November 1995. The report concluded that soil or groundwater remediation was not warranted at the site. The report further recommended that existing environmental impacts be monitored through periodic sampling of groundwater at the site. By letter dated July 16, 1997, FDEP approved a groundwater-monitoring plan that provides for annual sampling of selected monitoring wells at the site. Such annual sampling has been undertaken at the site since 1998. To date, FPU's share of these costs has not exceeded $3,000 annually. In March 1999, EPA requested site access in order to undertake an Expanded Site Inspection ("ESI"). The ESI was completed by EPA's contractor in 1999 and an ESI Report was transmitted to FPU in January 2000. The ESI Report recommends additional work at the site. The responsible parties met with FDEP on February 7, 2000 to discuss EPA's plans for the site. In February 2000, EPA indicated preliminarily that it will defer management of the site to FDEP; however, as of this date, FPU has not received any written confirmation from EPA or FDEP regarding this matter. Prior to receipt of EPA's written determination regarding site management, FPU is unable to determine whether additional fieldwork or site remediation will be required by EPA, and if so, the scope or costs of such work. | EXCERPTS ON THIS PAGE:
|
| |||||||