MRVL » Topics » No Guarantee of Capacity or Supply:

This excerpt taken from the MRVL 10-Q filed Jun 11, 2009.

No Guarantee of Capacity or Supply:

Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers’ purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies’ products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need.

Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us to transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income and cash flow.

In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our results of operations, such as non-refundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all or any of the guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results.

 

43


Table of Contents
These excerpts taken from the MRVL 10-K filed Apr 1, 2009.

No Guarantee of Capacity or Supply:

Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers’ purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies’ products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need.

Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us

 

25


Table of Contents

to transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income and cash flow.

In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our results of operations, such as non-refundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all or any of the guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results.

No Guarantee of Capacity or Supply:

Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers’ purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies’ products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need.

Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us

 

25


Table of Contents

to transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income and cash flow.

In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our results of operations, such as non-refundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all or any of the guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results.

No Guarantee of Capacity or Supply:


Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are
not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with
semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of
production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We
place our orders on the basis of our customers’ purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies’ products and reduce deliveries to us on short notice. It is
possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability
to secure the supply of components that we need.

Although we use several independent foundries to manufacture substantially all of our
semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of
our foundries is unable to provide us with components as needed, it may be difficult for us

 


25







Table of Contents



to transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those
components. This could result in a material decline in revenues, net income and cash flow.

In order to secure sufficient foundry capacity
when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our results of operations, such as non-refundable deposits with or loans to
foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any
arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all or any of the guaranteed
wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results.

This excerpt taken from the MRVL 10-Q filed Dec 11, 2008.

No Guarantee of Capacity or Supply:

 

Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers’ purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies’ products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need.

 

Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us to transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income and cash flow.

 

50



Table of Contents

 

In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our results of operations, such as nonrefundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all of any of the guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results.

 

This excerpt taken from the MRVL 10-Q filed Sep 10, 2008.

No Guarantee of Capacity or Supply:

 

Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers’ purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies’ products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need.

 

Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us to transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income and cash flow.

 

In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our results of operations, such as nonrefundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all of any of the guaranteed wafer

 

50



Table of Contents

 

capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results.

 

This excerpt taken from the MRVL 10-Q filed Jun 6, 2008.

No Guarantee of Capacity or Supply:

 

Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers’ purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies’ products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need.

 

Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us to transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income and cash flow.

 

In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our operating results, such as nonrefundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all of any of the guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results.

 

These excerpts taken from the MRVL 10-K filed Mar 28, 2008.

No Guarantee of Capacity or Supply:

        Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers' purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies' products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need.

        Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries.

30



Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us to transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income, and cash flow.

        In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our operating results, such as nonrefundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all of any of the guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results.

No Guarantee of Capacity or Supply:





        Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not
obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The
ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply
specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production
capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers'
purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies' products and reduce deliveries to us on short notice. It is possible
that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those
customers. This reallocation could impair our ability to secure the supply of components that we need.



        Although
we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any
given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries.



30











Accordingly,
if one of our foundries is unable to provide us with components as needed, it may be difficult for us to transition the manufacture of our products to other foundries, and we could
experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income, and cash flow.



        In
order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that
could be costly and harm our operating results, such as nonrefundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified
quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial
flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all of any of the
guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may
be expensive and could harm our financial results.





Wikinvest © 2006, 2007, 2008, 2009, 2010, 2011, 2012. Use of this site is subject to express Terms of Service, Privacy Policy, and Disclaimer. By continuing past this page, you agree to abide by these terms. Any information provided by Wikinvest, including but not limited to company data, competitors, business analysis, market share, sales revenues and other operating metrics, earnings call analysis, conference call transcripts, industry information, or price targets should not be construed as research, trading tips or recommendations, or investment advice and is provided with no warrants as to its accuracy. Stock market data, including US and International equity symbols, stock quotes, share prices, earnings ratios, and other fundamental data is provided by data partners. Stock market quotes delayed at least 15 minutes for NASDAQ, 20 mins for NYSE and AMEX. Market data by Xignite. See data providers for more details. Company names, products, services and branding cited herein may be trademarks or registered trademarks of their respective owners. The use of trademarks or service marks of another is not a representation that the other is affiliated with, sponsors, is sponsored by, endorses, or is endorsed by Wikinvest.