MRVL » Topics » Our sales are concentrated in a few customers and if we lose or experience a significant reduction in sales to any of these key customers, our revenues may decrease substantially.This excerpt taken from the MRVL 10-Q filed Jun 11, 2009. Our sales are concentrated in a few customers, and if we lose or experience a significant reduction in sales to any of these key customers, our revenues may decrease substantially. We receive a significant amount of our revenues from a limited number of customers. For the first quarter ended May 2, 2009, two customers accounted for a total of approximately 39% of our net revenue. Sales to our largest customers have fluctuated significantly from period to period primarily due to the timing and number of design wins with each customer, as well as the continued diversification of our customer base as we expand into new markets, and will likely continue to fluctuate dramatically in the future. The loss of any of our large customers, a significant reduction in sales we make to them, or any problems we encounter collecting amounts due from them would likely harm our financial condition and results of operations. Our operating results in the foreseeable future will continue to depend on sales to a relatively small number of customers, as well as the ability of these customers to sell products that incorporate our products. In the future, these customers may decide not to purchase our products at all, purchase fewer products than they did in the past, or alter their purchasing patterns in some other way, particularly because:
42
Table of ContentsWe rely on independent foundries and subcontractors for the manufacture, assembly and testing of our integrated circuit products, and the failure of any of these third party vendors to deliver products or otherwise perform as requested could damage our relationships with our customers, decrease our sales and limit our growth. We do not have our own manufacturing or assembly facilities and have very limited in-house testing facilities. Therefore, we rely on third party vendors to manufacture, assemble and test the products we design. We currently rely on several third party foundries to produce substantially all of our integrated circuit products. We also currently rely on several third party assembly and test subcontractors to assemble, package and test our products. This exposes us to a variety of risks, including the following: Regional Concentration: Substantially all of our products are manufactured by third party foundries located in Taiwan. Currently our alternative manufacturing sources are located in China and Singapore. In addition, substantially all of our assembly and testing facilities are located in Singapore, Taiwan, Malaysia and the Philippines. Because of the geographic concentration of these third party foundries, we are exposed to the risk that their operations may be disrupted by regional disasters. For example, the risk of an earthquake in Taiwan and elsewhere in the Pacific Rim region is significant due to the proximity of major earthquake fault lines to the facilities of our foundries and assembly and test subcontractors. In September 1999, a major earthquake in Taiwan affected the facilities of several of these third party contractors. As a consequence of this earthquake, these contractors suffered power outages and disruptions that impaired their production capacity. Major earthquakes also occurred in Taiwan in 2002, 2003, 2004 and 2006. In addition, the resurgence of severe acute respiratory syndrome, the outbreak of avian flu and any similar future outbreaks in Asia, where these foundries are located, could affect the production capabilities of our manufacturers by resulting in quarantines or closures. In the event of such a quarantine or closure, if we were unable to quickly identify alternate manufacturing facilities, our revenues, cost of revenues and results of operations would be negatively impacted. If these vendors do not provide us with high-quality products and services in a timely manner, or if one or more of these vendors terminates its relationship with us, we may be unable to obtain satisfactory replacements to fulfill customer orders on a timely basis, our relationships with our customers could suffer, our sales could decrease and harm our business, financial condition or results of operations. No Guarantee of Capacity or Supply: Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need. Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us to transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income and cash flow. In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our results of operations, such as non-refundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all or any of the guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results.
43
Table of ContentsUncertain Yields and Quality: The fabrication of integrated circuits is a complex and technically demanding process. Our foundries have from time to time experienced manufacturing defects and reduced manufacturing yields. Changes in manufacturing processes or the inadvertent use of defective or contaminated materials by our foundries could result in lower than anticipated manufacturing yields or unacceptable performance. Many of these problems are difficult to detect at an early stage of the manufacturing process and may be time consuming and expensive to correct. Poor yields from our foundries, or defects, integration issues or other performance problems in our products could cause us significant customer relations and business reputation problems, harm our financial results and result in financial or other damages to our customers. Our customers could also seek damages from us for their losses. A product liability claim brought against us, even if unsuccessful, would likely be time consuming and costly to defend. In addition, defects in our existing or new products could result in significant warranty, support and repair costs, and divert the attention of our engineering personnel from our product development efforts. To the extent that we rely on outside suppliers to manufacture or assemble and test our products, we may have a reduced ability to control directly product delivery schedules and quality assurance. This lack of control may result in product shortages or quality assurance problems that could delay shipments of products or increase manufacturing, assembly, testing or other costs. These excerpts taken from the MRVL 10-K filed Apr 1, 2009. Our sales are concentrated in a few customers, and if we lose or experience a significant reduction in sales to any of these key customers, our revenues may decrease substantially. We receive a significant amount of our revenues from a limited number of customers. For the year ended January 31, 2009, one customer accounted for a total of approximately 21% of our net revenue. Sales to our largest customers have fluctuated significantly from period to period primarily due to the timing and number of design wins with each customer, as well as the continued diversification of our customer base as we expand into new markets, and will likely continue to fluctuate dramatically in the future. The loss of any of our large customers, a significant reduction in sales we make to them, or any problems we encounter collecting amounts due from them would likely harm our financial condition and results of operations. Our operating results in the foreseeable future will continue to depend on sales to a relatively small number of customers, as well as the ability of these customers to sell products that incorporate our products. In the future, these customers may decide not to purchase our products at all, purchase fewer products than they did in the past, or alter their purchasing patterns in some other way, particularly because:
24
Table of ContentsWe rely on independent foundries and subcontractors for the manufacture, assembly and testing of our integrated circuit products, and the failure of any of these third party vendors to deliver products or otherwise perform as requested could damage our relationships with our customers, decrease our sales and limit our growth. We do not have our own manufacturing or assembly facilities and have very limited in-house testing facilities. Therefore, we rely on third party vendors to manufacture, assemble and test the products we design. We currently rely on several third party foundries to produce substantially all of our integrated circuit products. We also currently rely on several third party assembly and test subcontractors to assemble, package and test our products. This exposes us to a variety of risks, including the following: Regional Concentration: Substantially all of our products are manufactured by third party foundries located in Taiwan. Currently our alternative manufacturing sources are located in China and Singapore. In addition, substantially all of our assembly and testing facilities are located in Singapore, Taiwan, Malaysia and the Philippines. Because of the geographic concentration of these third party foundries, we are exposed to the risk that their operations may be disrupted by regional disasters. For example, the risk of an earthquake in Taiwan and elsewhere in the Pacific Rim region is significant due to the proximity of major earthquake fault lines to the facilities of our foundries and assembly and test subcontractors. In September 1999, a major earthquake in Taiwan affected the facilities of several of these third party contractors. As a consequence of this earthquake, these contractors suffered power outages and disruptions that impaired their production capacity. Major earthquakes also occurred in Taiwan in 2002, 2003, 2004 and 2006. In addition, the resurgence of severe acute respiratory syndrome, the outbreak of avian flu and any similar future outbreaks in Asia, where these foundries are located, could affect the production capabilities of our manufacturers by resulting in quarantines or closures. In the event of such a quarantine or closure, if we were unable to quickly identify alternate manufacturing facilities, our revenues, cost of revenues and results of operations would be negatively impacted. If these vendors do not provide us with high-quality products and services in a timely manner, or if one or more of these vendors terminates its relationship with us, we may be unable to obtain satisfactory replacements to fulfill customer orders on a timely basis, our relationships with our customers could suffer, our sales could decrease and harm our business, financial condition or results of operations. No Guarantee of Capacity or Supply: Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need. Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us
25
Table of Contentsto transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income and cash flow. In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our results of operations, such as non-refundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all or any of the guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results. Uncertain Yields and Quality: The fabrication of integrated circuits is a complex and technically demanding process. Our foundries have from time to time experienced manufacturing defects and reduced manufacturing yields. Changes in manufacturing processes or the inadvertent use of defective or contaminated materials by our foundries could result in lower than anticipated manufacturing yields or unacceptable performance. Many of these problems are difficult to detect at an early stage of the manufacturing process and may be time consuming and expensive to correct. Poor yields from our foundries, or defects, integration issues or other performance problems in our products could cause us significant customer relations and business reputation problems, harm our financial results and result in financial or other damages to our customers. Our customers could also seek damages from us for their losses. A product liability claim brought against us, even if unsuccessful, would likely be time consuming and costly to defend. In addition, defects in our existing or new products could result in significant warranty, support and repair costs, and divert the attention of our engineering personnel from our product development efforts. To the extent that we rely on outside suppliers to manufacture or assemble and test our products, we may have a reduced ability to control directly product delivery schedules and quality assurance. This lack of control may result in product shortages or quality assurance problems that could delay shipments of products or increase manufacturing, assembly, testing or other costs. Our sales are concentrated in a few customers, and if we lose or experience a significant reduction in sales to any of these key customers, our revenues may decrease substantially. We receive a significant amount of our revenues from a limited number of customers. For the year ended January 31, 2009, one customer accounted for a total of approximately 21% of our net revenue. Sales to our largest customers have fluctuated significantly from period to period primarily due to the timing and number of design wins with each customer, as well as the continued diversification of our customer base as we expand into new markets, and will likely continue to fluctuate dramatically in the future. The loss of any of our large customers, a significant reduction in sales we make to them, or any problems we encounter collecting amounts due from them would likely harm our financial condition and results of operations. Our operating results in the foreseeable future will continue to depend on sales to a relatively small number of customers, as well as the ability of these customers to sell products that incorporate our products. In the future, these customers may decide not to purchase our products at all, purchase fewer products than they did in the past, or alter their purchasing patterns in some other way, particularly because:
24
Table of ContentsWe rely on independent foundries and subcontractors for the manufacture, assembly and testing of our integrated circuit products, and the failure of any of these third party vendors to deliver products or otherwise perform as requested could damage our relationships with our customers, decrease our sales and limit our growth. We do not have our own manufacturing or assembly facilities and have very limited in-house testing facilities. Therefore, we rely on third party vendors to manufacture, assemble and test the products we design. We currently rely on several third party foundries to produce substantially all of our integrated circuit products. We also currently rely on several third party assembly and test subcontractors to assemble, package and test our products. This exposes us to a variety of risks, including the following: Regional Concentration: Substantially all of our products are manufactured by third party foundries located in Taiwan. Currently our alternative manufacturing sources are located in China and Singapore. In addition, substantially all of our assembly and testing facilities are located in Singapore, Taiwan, Malaysia and the Philippines. Because of the geographic concentration of these third party foundries, we are exposed to the risk that their operations may be disrupted by regional disasters. For example, the risk of an earthquake in Taiwan and elsewhere in the Pacific Rim region is significant due to the proximity of major earthquake fault lines to the facilities of our foundries and assembly and test subcontractors. In September 1999, a major earthquake in Taiwan affected the facilities of several of these third party contractors. As a consequence of this earthquake, these contractors suffered power outages and disruptions that impaired their production capacity. Major earthquakes also occurred in Taiwan in 2002, 2003, 2004 and 2006. In addition, the resurgence of severe acute respiratory syndrome, the outbreak of avian flu and any similar future outbreaks in Asia, where these foundries are located, could affect the production capabilities of our manufacturers by resulting in quarantines or closures. In the event of such a quarantine or closure, if we were unable to quickly identify alternate manufacturing facilities, our revenues, cost of revenues and results of operations would be negatively impacted. If these vendors do not provide us with high-quality products and services in a timely manner, or if one or more of these vendors terminates its relationship with us, we may be unable to obtain satisfactory replacements to fulfill customer orders on a timely basis, our relationships with our customers could suffer, our sales could decrease and harm our business, financial condition or results of operations. No Guarantee of Capacity or Supply: Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need. Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us
25
Table of Contentsto transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income and cash flow. In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our results of operations, such as non-refundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all or any of the guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results. Uncertain Yields and Quality: The fabrication of integrated circuits is a complex and technically demanding process. Our foundries have from time to time experienced manufacturing defects and reduced manufacturing yields. Changes in manufacturing processes or the inadvertent use of defective or contaminated materials by our foundries could result in lower than anticipated manufacturing yields or unacceptable performance. Many of these problems are difficult to detect at an early stage of the manufacturing process and may be time consuming and expensive to correct. Poor yields from our foundries, or defects, integration issues or other performance problems in our products could cause us significant customer relations and business reputation problems, harm our financial results and result in financial or other damages to our customers. Our customers could also seek damages from us for their losses. A product liability claim brought against us, even if unsuccessful, would likely be time consuming and costly to defend. In addition, defects in our existing or new products could result in significant warranty, support and repair costs, and divert the attention of our engineering personnel from our product development efforts. To the extent that we rely on outside suppliers to manufacture or assemble and test our products, we may have a reduced ability to control directly product delivery schedules and quality assurance. This lack of control may result in product shortages or quality assurance problems that could delay shipments of products or increase manufacturing, assembly, testing or other costs. Our sales total of approximately 21% of our net revenue. Sales to our largest customers have fluctuated significantly from period to period primarily due to the timing and number of design wins with each customer, as well as the continued diversification of our customer base as we expand into new markets, and will likely continue to fluctuate dramatically in the future. The loss of any of our large customers, a significant reduction in sales we make to them, or any problems we encounter collecting amounts due from them would likely harm our financial condition and results of operations. Our operating results in the foreseeable future will continue to depend on sales to a relatively small number of customers, as well as the ability of these customers to sell products that incorporate our products. In the future, these customers may decide not to purchase our products at all, purchase fewer products than they did in the past, or alter their purchasing patterns in some other way, particularly because:
24 Table of ContentsWe rely on independent foundries and subcontractors for the manufacture, assembly and testing of our integrated to manufacture, assemble and test the products we design. We currently rely on several third party foundries to produce substantially all of our integrated circuit products. We also currently rely on several third party assembly and test subcontractors to assemble, package and test our products. This exposes us to a variety of risks, including the following: Regional Substantially all of our products are manufactured by third party foundries located in Taiwan. Currently our alternative No Guarantee of Capacity or Supply: Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are Although we use several independent foundries to manufacture substantially all of our
25 Table of Contents
In order to secure sufficient foundry capacity Uncertain Yields and Quality: SIZE="2">The fabrication of integrated circuits is a complex and technically demanding process. Our foundries have from time to time experienced manufacturing defects and reduced manufacturing yields. Changes in manufacturing processes or the product delivery schedules and quality assurance. This lack of control may result in product shortages or quality assurance problems that could delay shipments of products or increase manufacturing, assembly, testing or other costs. STYLE="margin-top:18px;margin-bottom:0px">If we are unable to accurately predict our future sales and to appropriately budget for our expenses, our results of operations could suffer. The rapidly changing nature of the global economy and the markets in which we sell our products limits our ability to accurately forecast quarterly and
26 Table of ContentsWe have had material weaknesses in internal control over financial reporting in prior fiscal years. Although we We strongly believe that effective internal controls are necessary Our management, including our Chief Executive Officer and Chief Financial Officer, does not expect that our internal This excerpt taken from the MRVL 10-Q filed Dec 11, 2008. Our sales are concentrated in a few customers, and if we lose or experience a significant reduction in sales to any of these key customers, our revenues may decrease substantially.
We receive a significant amount of our revenues from a limited number of customers. For the nine months ended November 1, 2008, one customer accounted for a total of approximately 21% of our net revenue. Sales to our largest customers have fluctuated significantly from period to period primarily due to the timing and number of design wins with each customer, as well as the continued diversification of our customer base as we expand into new markets, and will likely continue to fluctuate dramatically in the future. The loss of any of our large customers, a significant reduction in sales we make to them, or any problems we encounter collecting amounts due from them would likely harm our financial condition and results of operations. Our operating results in the foreseeable future will continue to depend on sales to a relatively small number of customers, as well as the ability of these customers to sell products that incorporate our products. In the future, these customers may decide not to purchase our products at all, purchase fewer products than they did in the past, or alter their purchasing patterns in some other way, particularly because:
· substantially all of our sales are made on a purchase order basis, which permits our customers to cancel, change or delay product purchase commitments with little or no notice to us and without penalty;
49
· our customers may develop their own solutions;
· our customers may purchase integrated circuits from our competitors; or
· our customers may discontinue sales or lose market share in the markets for which they purchase our products.
We rely on independent foundries and subcontractors for the manufacture, assembly and testing of our integrated circuit products, and the failure of any of these third party vendors to deliver products or otherwise perform as requested could damage our relationships with our customers, decrease our sales and limit our growth.
We do not have our own manufacturing or assembly facilities and have very limited in-house testing facilities. Therefore, we rely on third party vendors to manufacture, assemble and test the products we design. We currently rely on several third party foundries to produce substantially all of our integrated circuit products. We also currently rely on several third party assembly and test subcontractors to assemble, package and test our products. This exposes us to a variety of risks, including the following:
Regional Concentration:
Substantially all of our products are manufactured by third party foundries located in Taiwan. Currently our only alternative manufacturing sources are located in Taiwan, China and Singapore. In addition, substantially all of our assembly and testing facilities are located in Singapore, Taiwan, Malaysia and the Philippines. Because of the geographic concentration of these third party foundries, we are exposed to the risk that their operations may be disrupted by regional disasters. For example, the risk of an earthquake in Taiwan and elsewhere in the Pacific Rim region is significant due to the proximity of major earthquake fault lines to the facilities of our foundries and assembly and test subcontractors. In September 1999, a major earthquake in Taiwan affected the facilities of several of these third party contractors. As a consequence of this earthquake, these contractors suffered power outages and disruptions that impaired their production capacity. Major earthquakes also occurred in Taiwan in 2002, 2003, 2004 and more recently in 2006. In addition, the resurgence of severe acute respiratory syndrome, the outbreak of avian flu and any similar future outbreaks in Asia, where these foundries are located, could affect the production capabilities of our manufacturers by resulting in quarantines or closures. In the event of such a quarantine or closure, if we were unable to quickly identify alternate manufacturing facilities, our revenues, cost of revenues and results of operations would be negatively impacted. If these vendors do not provide us with high-quality products and services in a timely manner, or if one or more of these vendors terminates its relationship with us, we may be unable to obtain satisfactory replacements to fulfill customer orders on a timely basis, our relationships with our customers could suffer, our sales could decrease and harm our business, financial condition or results of operations.
No Guarantee of Capacity or Supply:
Availability of foundry capacity has from time to time in the past been constrained due to strong demand, and with limited exceptions, our vendors are not obligated to perform services or supply products to us for any specific period, in any specific quantities, or at any specific price, except as may be provided in a particular purchase order. The ability of each foundry to provide us with semiconductor devices is limited by its available capacity and existing obligations. Although we have entered into contractual commitments to supply specified levels of products to some of our customers, we may not have sufficient levels of production capacity with all of our foundries, despite signing a long-term guaranteed production capacity agreement with one of our foundries. Despite this agreement, foundry capacity may not be available when we need it or at reasonable prices. We place our orders on the basis of our customers purchase orders or our forecast of customer demand, and the foundries can allocate capacity to the production of other companies products and reduce deliveries to us on short notice. It is possible that foundry customers that are larger and better financed than we are or that have long-term agreements with our main foundries, may induce our foundries to reallocate capacity to those customers. This reallocation could impair our ability to secure the supply of components that we need.
Although we use several independent foundries to manufacture substantially all of our semiconductor products, most of our components are not manufactured at more than one foundry at any given time, and our products typically are designed to be manufactured in a specific process at only one of these foundries. Accordingly, if one of our foundries is unable to provide us with components as needed, it may be difficult for us to transition the manufacture of our products to other foundries, and we could experience significant delays in securing sufficient supplies of those components. This could result in a material decline in revenues, net income and cash flow.
50
In order to secure sufficient foundry capacity when demand is high and mitigate the risks described in the foregoing paragraph, we may enter into various arrangements with suppliers that could be costly and harm our results of operations, such as nonrefundable deposits with or loans to foundries in exchange for capacity commitments, and contracts that commit us to purchase specified quantities of integrated circuits over extended periods. We may not be able to make any such arrangement in a timely fashion or at all, and any arrangements may be costly, reduce our financial flexibility, and not be on terms favorable to us. For example, amounts payable under our foundry capacity are non-refundable regardless of whether we are able to utilize all of any of the guaranteed wafer capacity under the terms of the agreement. Moreover, if we are able to secure foundry capacity, we may be obligated to use all of that capacity or incur penalties. These penalties may be expensive and could harm our financial results.
Uncertain Yields and Quality:
The fabrication of integrated circuits is a complex and technically demanding process. Our foundries have from time to time experienced manufacturing defects and reduced manufacturing yields. Changes in manufacturing processes or the inadvertent use of defective or contaminated materials by our foundries could result in lower than anticipated manufacturing yields or unacceptable performance. Many of these problems are difficult to detect at an early stage of the manufacturing process and may be time consuming and expensive to correct. Poor yields from our foundries, or defects, integration issues or other performance problems in our products could cause us significant customer relations and business reputation problems, harm our financial results and result in financial or other damages to our customers. Our customers could also seek damages from us for their losses. A product liability claim brought against us, even if unsuccessful, would likely be time consuming and costly to defend. In addition, defects in our existing or new products could result in significant warranty, support and repair costs, and divert the attention of our engineering personnel from our product development efforts.
This excerpt taken from the MRVL 10-Q filed Jun 6, 2008. Our sales are concentrated in a few customers and if we lose or experience a significant reduction in sales to any of these key customers, our revenues may decrease substantially.
We receive a significant amount of our revenues from a limited number of customers. For the quarter ended May 3, 2008, one customer accounted for more than 10% of our net revenue, for a total of 21% of our net revenue. Sales to our largest customers have fluctuated significantly from period to period primarily due to the timing and number of design wins with each customer, as well as the continued diversification of our customer base as we expand into new markets, and will likely continue to fluctuate dramatically in the future. The loss of any of our largest customers, a significant reduction in sales we make to them, or any problems we encounter collecting amounts due from them would likely harm our financial condition and results of operations. Our operating results in the foreseeable future will continue to depend on sales to a relatively small number of customers, as well as the ability of these customers to sell products that incorporate our products. In the future, these customers may decide not to purchase our products at all, purchase fewer products than they did in the past, or alter their purchasing patterns in some other way, particularly because:
· substantially all of our sales are made on a purchase order basis, which permits our customers to cancel, change or delay product purchase commitments with little or no notice to us and without penalty;
· our customers may develop their own solutions;
· our customers may purchase integrated circuits from our competitors; or
· our customers may discontinue sales or lose market share in the markets for which they purchase our products.
49
These excerpts taken from the MRVL 10-K filed Mar 28, 2008. Our sales are concentrated in a few customers and if we lose or experience a significant reduction in sales to any of these key customers, our revenues may decrease substantially. We receive a significant amount of our revenues from a limited number of customers. For the year ended February 2, 2008 one customer accounted for more than 10% of our net revenue, for a total of 17% of our net revenue. Sales to our largest customers have fluctuated significantly from period to period primarily due to the timing and number of design wins with each customer, as well as the continued diversification of our customer base as we expand into new markets, and will likely continue to fluctuate dramatically in the future. The loss of any of our largest customers, a significant reduction in sales we make to them, or any problems we encounter collecting amounts due from them would likely harm our financial condition and results of operations. Our operating results in the foreseeable future will continue to depend on sales to a relatively small number of customers, as well as the ability of these customers to sell products that incorporate our products. In the future, these customers may decide not to purchase our products at all, purchase fewer products than they did in the past, or alter their purchasing patterns in some other way, particularly because:
Our sales are concentrated in a few customers and if we lose or experience a significant reduction in sales to any of these key customers, our revenues We receive a significant amount of our revenues from a limited number of customers. For the year ended February 2, 2008 one customer accounted for more
This excerpt taken from the MRVL 10-Q filed Sep 6, 2007. Our sales are concentrated in a few customers and if we lose or experience a significant reduction in sales to any of these key customers, our revenues may decrease substantially. We receive a significant amount of our revenues from a limited number of customers. For the six months ended July 28, 2007 one customer accounted for 15% of our net revenue. For the six months ended July 29, 2006, four customers each represented more than 10% of our net revenue, for a combined total of 51% of our net revenue. Sales to our largest customers have fluctuated significantly from period to period primarily due to the timing and number of design wins with each customer, as well as the continued diversification of our customer base as we expand into new markets, and will likely continue to fluctuate dramatically in the future. The loss of any of our largest customers, a significant reduction in sales we make to them, or any problems we encounter collecting amounts due from them would likely harm our financial condition and results of operations. Our operating results in the foreseeable future will continue to depend on sales to a relatively small number of customers, as well as the ability of these customers to sell products that incorporate our products. In the future, these customers may decide not to purchase our products at all, purchase fewer products than they did in the past, or alter their purchasing patterns in some other way, particularly because: · substantially all of our sales are made on a purchase order basis, which permits our customers to cancel, change or delay product purchase commitments with little or no notice to us and without penalty; · our customers may develop their own solutions; · our customers may purchase integrated circuits from our competitors; or · our customers may discontinue sales or lose market share in the markets for which they purchase our products. | EXCERPTS ON THIS PAGE:
|
| |||||||