This excerpt taken from the NFLX 10-Q filed Aug 9, 2006. 3. Shell:
All work required to obtain a shell permit final inspection (not a TCO for occupancy). All work shall conform to local building codes, ADA and Title 24 for the shell. Exterior doors to have electronic hardware (system provided by Tenant). Stairs for access and egress with one set to the roof. Interior walls to be furred out above and below windows. Fire riser and complete shell system, including up heads with capped tees for Tenant improvements at all floors and roof, monitors and PIV (monitoring system by Tenant). Provided shaft locations and HVAC equipment are determined prior to steel fabrication, steel framework shall be designed to accommodate shaft and elevator openings and mechanical support and leveling pads at no cost to Tenant. Complete sewer gut line under podium slab connecting restroom cores to site utility.
|
| |||||||