Environmental Matters

PPG is subject to existing and evolving standards relating to protection of the environment. Capital expenditures for environmental control projects were $15 million, $16 million and $14 million in 2008, 2007 and 2006, respectively. It is expected that expenditures for such projects in 2009 will be in the range of $15-$25 million. Although future capital expenditures are difficult to estimate accurately because of constantly changing regulatory standards and policies, it can be anticipated that environmental control standards will become increasingly stringent and the cost of compliance will increase.

 

Prior to 2007, about 20% of our chlor-alkali production capacity used mercury cell technology. PPG strives to operate these cells in accordance with applicable laws and regulations, and these cells are reviewed at least annually by state authorities. The USEPA has issued new regulations imposing significantly more stringent requirements on mercury emissions. These new rules took effect in December 2006. In order to meet the USEPA’s new air quality standards, a decision was made in July 2005 to replace the existing mercury cell production unit at the Lake Charles, La., chlor-alkali plant with newer membrane cell technology. The Louisiana Department of Environmental Quality granted the Company a one year extension to meet the new requirements on mercury emissions. This capital project began in 2005 and was completed in 2007. With the completion of this project in 2007, 4% of PPG’s chlor-alkali production uses mercury cell technology.

 

PPG is negotiating with various government agencies concerning 105 current and former manufacturing sites and offsite waste disposal locations, including 23 sites on the National Priority List. The number of sites has increased when compared to the prior year, primarily as a result of sites that were assumed as a result of the SigmaKalon acquisition. While PPG is not generally a major contributor of wastes to these offsite waste disposal locations, each potentially responsible party may face governmental agency assertions of joint and several liability. Generally, however, a final allocation of costs is made based on relative contributions of wastes to the site. There is a wide range of cost estimates for cleanup of these sites, due largely to uncertainties as to the nature

 

8   2008 PPG ANNUAL REPORT AND FORM 10-K


Table of Contents

 

and extent of their condition and the methods that may have to be employed for their remediation. The Company has established reserves for onsite and offsite remediation of those sites where it is probable that a liability has been incurred and the amount can be reasonably estimated. As of December 31, 2008 and 2007, PPG had reserves for environmental contingencies totaling $299 million and $276 million, respectively, of which $44 million and $57 million, respectively, were classified as current liabilities. Pretax charges against income for environmental remediation costs in 2008, 2007 and 2006 totaled $15 million, $12 million and $207 million, respectively. Cash outlays related to such environmental remediation aggregated $24 million, $19 million and $22 million in 2008, 2007 and 2006, respectively. As part of the allocation of the SigmaKalon purchase price to the assets acquired and liabilities assumed, the reserve for environmental contingencies was increased by $37 million in 2008. The impact of foreign currency translation decreased the liability by $5 million in 2008. Environmental remediation of a former chromium manufacturing plant site and associated sites in Jersey City, N.J., represented the major part of our 2006 environmental charges and our existing reserves. Included in the amounts mentioned above were $185 million of 2006 charges against income and $193 million and $195 million in reserves at December 31, 2008 and 2007, respectively, associated with all New Jersey chromium sites.

 

The Company’s experience to date regarding environmental matters leads PPG to believe that it will have continuing expenditures for compliance with provisions regulating the protection of the environment and for present and future remediation efforts at waste and plant sites. Management anticipates that such expenditures will occur over an extended period of time.

 

Charges for estimated environmental remediation costs in 2006 were significantly higher than our historical range. Our continuing efforts to analyze and assess the environmental issues associated with a former chromium manufacturing plant site located in Jersey City, N.J., and the Calcasieu River Estuary located near our Lake Charles, La., chlor-alkali plant resulted in a pre-tax charge of $173 million in the third quarter of 2006 for the estimated costs of remediating these sites. Excluding 2006, pre-tax charges against income have ranged between $10 million and $49 million per year for the past 15 years. We anticipate that charges against income in 2009 for environmental remediation costs will be within this historical range.

 

In management’s opinion, the Company operates in an environmentally sound manner, is well positioned, relative to environmental matters, within the industries in which it operates, and the outcome of these environmental contingencies will not have a material adverse effect on PPG’s financial position or liquidity; however, any such outcome may be material to the results of operations of any particular period in which costs, if any, are recognized. See Note 15, “Commitments and Contingent Liabilities,” under Item 8 of this Form 10-K for additional information related to environmental matters.

 

There are growing public and governmental concerns related to climate change, which have led to efforts to limit greenhouse gas (“GHG”) emissions. These concerns were reflected in the 2005 framework for GHG reduction under the Kyoto Protocol to the United Nations Framework Convention on Climate Change. The Kyoto Protocol has been adopted by many countries where PPG operates, including the EU and Canada, though not in the U.S. The EU has implemented a cap and trade approach with a mandatory emissions trading scheme for GHGs. In December 2007, delegates to the United Nations Framework Convention on Climate Change reached agreement on development of a plan for the second phase of Kyoto, scheduled to start in 2013. This could potentially lead to further reduction requirements. A substantial portion of PPG’s GHG emissions are generated by locations in the U.S.; however, at this time it is uncertain whether the U.S. will set GHG reduction goals under the Kyoto Protocol or by some other mechanism. PPG has joined the U.S.-based Climate Registry to assist in verification of future GHG reduction achievements in preparation for potential imposition in the U.S. of GHG reduction goals.

 

Energy prices and availability of supply continue to be a concern for major energy users. Since PPG’s GHG emissions arise principally from combustion of fossil fuels, PPG has for some time recognized the desirability of reducing energy consumption and GHG generation. We committed under the Business Roundtable’s Climate RESOLVE program to reduce our GHG intensity (GHGs produced per million dollars of revenue) by 18% between 2002 and 2012. PPG achieved this target in 2006, six years ahead of schedule. Recognizing the continuing importance of this matter, PPG has appointed an Energy Security and Climate Change Steering Group to guide the Company’s progress in this area. Additionally, in 2007 PPG announced new corporate targets, namely (i) a reduction in energy intensity by 25% from 2006 to 2016 and (ii) a 10% absolute reduction in GHG emissions from 2006 to 2011. PPG’s public disclosure on energy security and climate change can be viewed at the Carbon Disclosure Project www.cdproject.net.

Environmental Matters

STYLE="margin-top:0px;margin-bottom:0px; text-indent:3%">PPG is subject to existing and evolving standards relating to protection of the environment. Capital expenditures for environmental control projects were
$15 million, $16 million and $14 million in 2008, 2007 and 2006, respectively. It is expected that expenditures for such projects in 2009 will be in the range of $15-$25 million. Although future capital expenditures are difficult to estimate
accurately because of constantly changing regulatory standards and policies, it can be anticipated that environmental control standards will become increasingly stringent and the cost of compliance will increase.

STYLE="margin-top:0px;margin-bottom:-6px"> 

Prior to 2007, about 20% of our chlor-alkali production capacity used
mercury cell technology. PPG strives to operate these cells in accordance with applicable laws and regulations, and these cells are reviewed at least annually by state authorities. The USEPA has issued new regulations imposing significantly more
stringent requirements on mercury emissions. These new rules took effect in December 2006. In order to meet the USEPA’s new air quality standards, a decision was made in July 2005 to replace the existing mercury cell production unit at the Lake
Charles, La., chlor-alkali plant with newer membrane cell technology. The Louisiana Department of Environmental Quality granted the Company a one year extension to meet the new requirements on mercury emissions. This capital project began in 2005
and was completed in 2007. With the completion of this project in 2007, 4% of PPG’s chlor-alkali production uses mercury cell technology.

 

STYLE="margin-top:0px;margin-bottom:0px; text-indent:3%">PPG is negotiating with various government agencies concerning 105 current and former manufacturing sites and offsite waste disposal locations, including
23 sites on the National Priority List. The number of sites has increased when compared to the prior year, primarily as a result of sites that were assumed as a result of the SigmaKalon acquisition. While PPG is not generally a major contributor of
wastes to these offsite waste disposal locations, each potentially responsible party may face governmental agency assertions of joint and several liability. Generally, however, a final allocation of costs is made based on relative contributions of
wastes to the site. There is a wide range of cost estimates for cleanup of these sites, due largely to uncertainties as to the nature

 













8 2008 PPG ANNUAL REPORT AND FORM 10-K






Table of Contents


 


and extent of their condition and the methods that may have to be employed for their remediation. The Company has established reserves for onsite and offsite
remediation of those sites where it is probable that a liability has been incurred and the amount can be reasonably estimated. As of December 31, 2008 and 2007, PPG had reserves for environmental contingencies totaling $299 million and $276 million,
respectively, of which $44 million and $57 million, respectively, were classified as current liabilities. Pretax charges against income for environmental remediation costs in 2008, 2007 and 2006 totaled $15 million, $12 million and $207 million,
respectively. Cash outlays related to such environmental remediation aggregated $24 million, $19 million and $22 million in 2008, 2007 and 2006, respectively. As part of the allocation of the SigmaKalon purchase price to the assets acquired and
liabilities assumed, the reserve for environmental contingencies was increased by $37 million in 2008. The impact of foreign currency translation decreased the liability by $5 million in 2008. Environmental remediation of a former chromium
manufacturing plant site and associated sites in Jersey City, N.J., represented the major part of our 2006 environmental charges and our existing reserves. Included in the amounts mentioned above were $185 million of 2006 charges against income and
$193 million and $195 million in reserves at December 31, 2008 and 2007, respectively, associated with all New Jersey chromium sites.

 

STYLE="margin-top:0px;margin-bottom:0px; text-indent:3%">The Company’s experience to date regarding environmental matters leads PPG to believe that it will have continuing expenditures for compliance with
provisions regulating the protection of the environment and for present and future remediation efforts at waste and plant sites. Management anticipates that such expenditures will occur over an extended period of time.

STYLE="margin-top:0px;margin-bottom:-6px"> 

Charges for estimated environmental remediation costs in 2006 were
significantly higher than our historical range. Our continuing efforts to analyze and assess the environmental issues associated with a former chromium manufacturing plant site located in Jersey City, N.J., and the Calcasieu River Estuary located
near our Lake Charles, La., chlor-alkali plant resulted in a pre-tax charge of $173 million in the third quarter of 2006 for the estimated costs of remediating these sites. Excluding 2006, pre-tax charges against income have ranged between $10
million and $49 million per year for the past 15 years. We anticipate that charges against income in 2009 for environmental remediation costs will be within this historical range.

SIZE="1"> 

In management’s opinion, the Company operates in an environmentally sound manner, is well positioned, relative to
environmental matters, within the industries in which it operates, and the outcome of these environmental contingencies will not have a material adverse effect on PPG’s financial position or liquidity;
SIZE="2">however, any such outcome may be material to the results of operations of any particular period in which costs, if any, are recognized. See Note 15, “Commitments and Contingent Liabilities,” under Item 8 of this Form 10-K for
additional information related to environmental matters.

 

SIZE="2">There are growing public and governmental concerns related to climate change, which have led to efforts to limit greenhouse gas (“GHG”) emissions. These concerns were reflected in the 2005 framework for GHG reduction under the
Kyoto Protocol to the United Nations Framework Convention on Climate Change. The Kyoto Protocol has been adopted by many countries where PPG operates, including the EU and Canada, though not in the U.S. The EU has implemented a cap and trade
approach with a mandatory emissions trading scheme for GHGs. In December 2007, delegates to the United Nations Framework Convention on Climate Change reached agreement on development of a plan for the second phase of Kyoto, scheduled to start in
2013. This could potentially lead to further reduction requirements. A substantial portion of PPG’s GHG emissions are generated by locations in the U.S.; however, at this time it is uncertain whether the U.S. will set GHG reduction goals under
the Kyoto Protocol or by some other mechanism. PPG has joined the U.S.-based Climate Registry to assist in verification of future GHG reduction achievements in preparation for potential imposition in the U.S. of GHG reduction goals.

STYLE="margin-top:0px;margin-bottom:-6px"> 

Energy prices and availability of supply continue to be a concern for major
energy users. Since PPG’s GHG emissions arise principally from combustion of fossil fuels, PPG has for some time recognized the desirability of reducing energy consumption and GHG generation. We committed under the Business Roundtable’s
Climate RESOLVE program to reduce our GHG intensity (GHGs produced per million dollars of revenue) by 18% between 2002 and 2012. PPG achieved this target in 2006, six years ahead of schedule. Recognizing the continuing importance of this matter, PPG
has appointed an Energy Security and Climate Change Steering Group to guide the Company’s progress in this area. Additionally, in 2007 PPG announced new corporate targets, namely (i) a reduction in energy intensity by 25% from 2006 to 2016 and
(ii) a 10% absolute reduction in GHG emissions from 2006 to 2011. PPG’s public disclosure on energy security and climate change can be viewed at the Carbon Disclosure Project www.cdproject.net.

STYLE="margin-top:0px;margin-bottom:0px">Available Information

The
Company’s website address is www.ppg.com. The Company posts, and shareholders may access without charge, the Company’s recent filings and any amendments thereto of its annual reports on Form 10-K, quarterly reports on Form 10-Q and
its proxy statements as soon as reasonably practicable after such reports are filed with the Securities and Exchange Commission (“SEC”). The

 













2008 PPG ANNUAL REPORT AND FORM 10-K 9






Table of Contents


 


Company also posts all financial press releases and earnings releases to its website. All other reports filed or furnished to the SEC, including reports on
Form 8-K, are available via direct link on PPG’s website to the SEC’s website, www.sec.gov. Reference to the Company’s and SEC’s websites herein does not incorporate by reference any information contained on those websites
and such information should not be considered part of this Form 10-K.

 

COLOR="#0c4f87">Item 1a. Risk Factors

As a global manufacturer of coatings, glass and chemicals products, we
operate in a business environment that includes risks. These risks are not unlike the risks we have faced in the recent past. Each of the risks described in this section could adversely affect our operating results, financial position and liquidity.
While the factors listed here are considered to be the more significant factors, no such list should be considered to be a complete statement of all potential risks and uncertainties. Unlisted factors may present significant additional obstacles
which may adversely affect our business.

 

This excerpt taken from the PPG 10-Q filed Oct 27, 2008.

Environmental Matters

It is PPG’s policy to accrue expenses for environmental contingencies when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. Reserves for environmental contingencies are exclusive of claims against third parties and are generally not discounted. In management’s opinion, the Company operates in an environmentally sound manner and the outcome of the Company’s environmental contingencies will not have a material effect on PPG’s financial position or liquidity; however, any such outcome may be material to the results of operations of any particular period in which costs, if any, are recognized. Management anticipates that the resolution of the Company’s environmental contingencies will occur over an extended period of time.

As of September 30, 2008 and December 31, 2007, PPG had reserves for environmental contingencies totaling $280 million and $276 million, respectively, of which $49 million and $57 million, respectively, were classified as current liabilities. Pretax charges against income for environmental remediation costs totaled $5 million and $12 million, respectively, for the three and nine months ended September 30, 2008, and $3 million and $8 million, respectively, for the three and nine months ended September 30, 2007, and are included in “Other charges” in the accompanying condensed consolidated statement of income. Cash outlays related to such environmental remediation aggregated $9 million and $17 million, respectively, for the three and nine months ended September 30, 2008 and $4 million and $14 million, respectively, for the three and nine months ended September 30, 2007. As part of the preliminary allocation of the SigmaKalon purchase price to the assets acquired and liabilities assumed, the PPG reserve for environmental contingencies was increased by $9 million in 2008.

Charges for estimated environmental remediation costs in 2006 were significantly higher than our historical range. Our continuing efforts to analyze and assess the environmental issues associated with a former chromium manufacturing plant site located in Jersey City, NJ and at the Calcasieu River Estuary located near our Lake Charles, LA chlor-alkali plant resulted in a pre-tax charge of $173 million in the third quarter of 2006 for the estimated costs of remediating these sites. Excluding 2006, pretax charges against income have ranged between $10 million and $49 million per year for the past 15 years. We anticipate that charges against income in 2008 for environmental remediation costs will be within this historical range.

We expect cash outlays for environmental remediation costs to be approximately $30 million in 2008 and to range from $35 million to $60 million annually through 2012. It is possible that technological, regulatory and enforcement developments, the results of environmental studies and other factors could alter our expectations with respect to charges against income and future cash outlays. Specifically, the level of expected cash outlays is highly dependent upon activity related to the former chromium manufacturing plant site in New Jersey, as PPG awaits approval of workplans that have been submitted to the applicable regulatory agencies.

In New Jersey, PPG continues to perform its obligations under an Administrative Consent Order (“ACO”) with the New Jersey Department of Environmental Protection (“NJDEP”). Since 1990, PPG has remediated 47 of 61 residential and nonresidential sites under the ACO. The most significant of the 14 remaining sites is the former chromium manufacturing location in Jersey City. The principal contaminant of concern is hexavalent chromium. Based on current estimates, at least 500,000 tons of soil may be potentially impacted for all remaining sites. As of September 30, 2008 and December 31, 2007 PPG had reserves of $193 million and $195

 

28


Table of Contents

million, respectively, for environmental contingencies associated with all New Jersey sites. The Company submitted a feasibility study work plan to the NJDEP in October 2006 that includes review of the available remediation technology alternatives for the former chromium manufacturing location. Under the feasibility study work plan, remedial alternatives which will be assessed include, but are not limited to, soil excavation and offsite disposal in a licensed disposal facility, in situ chemical stabilization of soil and groundwater, and in situ solidification of soils. A feasibility study is expected to be completed in 2010. In addition, PPG is planning to conduct Interim Remedial Measures (“IRMs”) at the site during 2009. Implementation of these IRMs will assist in the evaluation of remedial technologies required in the feasibility study. PPG has submitted a Remedial Action Work Plan for one other of the remaining sites under the ACO. This proposal has been submitted to the NJDEP for approval. In addition, investigation activities are ongoing for an additional six sites covered by the ACO adjacent to the former manufacturing site with completion expected in 2009. Investigation activities have not yet begun for the remaining six sites covered by the ACO, but we believe the results of the study at the former chromium manufacturing location will also provide us with relevant information concerning remediation alternatives at these sites.

As a result of the extensive analysis undertaken in connection with the preparation and submission of the feasibility study work plan for the former chromium manufacturing location described above, the Company recorded a pretax charge of $165 million in the third quarter of 2006. The charge included estimated costs for remediation at the 14 remaining ACO sites, including the former manufacturing site, and for the resolution of litigation filed by NJDEP in May 2005 as discussed below. The principal estimated cost elements of the third quarter 2006 charge and of the remaining reserve at September 30, 2008 were based on competitively derived or readily available remediation industry cost data for representative remedial options e.g., excavation and in situ stabilization/solidification. The major cost components are (i) in place soil treatment and transportation and disposal of excavated soil and (ii) construction services (related to soil excavation, groundwater management and site security), which account for approximately 50% and 30% of the reserve, respectively, as of September 30, 2008. The reserve also includes estimated costs for remedial investigation, interim remedial measures, engineering and project management. The most significant assumptions underlying the reserve are those related to the extent and concentration of chromium impacts in the soil, as these will determine the quantity of soil that must be treated in place, the quantity that will have to be excavated and transported for offsite disposal, and the nature of disposal required. The charges are exclusive of any third party indemnification, as management believes the likelihood of receiving any such amounts to be remote.

Multiple future events, including completion of feasibility studies, remedy selection, remedy design and remedy implementation involving governmental agency action or approvals will be required, and considerable uncertainty exists regarding the timing of these future events for the remaining 14 sites covered by the ACO. Final resolution of these events is expected to occur over an extended period of time. However, based on current information, it is expected that feasibility study approval and remedy selection could occur during 2010 for the former chromium plant and six adjacent sites, while remedy design and approval could occur during 2010 to 2011, and remedy implementation could occur during 2011 to 2015, with some period of long-term monitoring for remedy effectiveness to follow related to these seven sites. One other site is expected to be remediated during 2009 to 2010. Activities at the six other sites have not yet begun and the timing of future events related to these sites cannot be predicted at this time. As these events occur and to the extent that the cost estimates of the environmental remediation remedies change, the existing reserve for this environmental remediation will be adjusted. Based on current information, we expect cash outlays related to remediation efforts in New Jersey to range from $5 million to $10 million in 2008 and $30 million to $45 million annually from 2009 through 2012.

 

29


Table of Contents

In May 2005, the NJDEP filed a complaint against PPG and two other former chromium producers seeking to hold the parties responsible for a further 53 sites where the source of chromium contamination is not known and to recover costs incurred by the agency in connection with its response activities at certain of those sites. During the third quarter, the parties reached an agreement in principle on all claims relating to these 53 sites. Under the terms of the proposed settlement, PPG would, among other things, accept responsibility for remediation of 6 of the 53 sites, reimburse the NJDEP for a portion of past costs in the amount of $5 million and be responsible for the NJDEP’s oversight costs associated with the sites for which PPG is wholly or partially responsible. This settlement would not affect PPG’s responsibilities for the 14 remaining unremediated sites covered by PPG’s ACO. PPG’s estimated costs under this proposed settlement are included in the September 30, 2008 previously established reserve for New Jersey chrome environmental remediation matters.

In Lake Charles, the U.S. Environmental Protection Agency (“USEPA”) completed investigation of contamination levels in the Calcasieu River Estuary and issued a Final Remedial Investigation Report in September 2003, which incorporates the Human Health and Ecological Risk Assessments, indicating that elevated levels of risk exist in the estuary. PPG and other potentially responsible parties are performing a feasibility study under the authority of the Louisiana Department of Environmental Quality (“LDEQ”). PPG’s exposure with respect to the Calcasieu Estuary is focused on the lower few miles of Bayou d’Inde, a small tributary to the Calcasieu Estuary near PPG’s Lake Charles facility, and about 150 to 200 acres of adjacent marshes. The Company and three other potentially responsible parties submitted a draft remediation feasibility study report to the LDEQ in October 2006. The proposed remedial alternatives include sediment dredging, sediment capping, and biomonitoring of fish and shellfish. Principal contaminants of concern which may require remediation include various metals, dioxins and furans, and polychlorinated biphenyls. In response to agency comments on the draft study, the companies conducted additional investigations and submitted a revised feasibility report to the agencies in the third quarter 2008.

Multiple future events, such as feasibility study approval, remedy selection, remedy design and remedy implementation involving agency action or approvals will be required and considerable uncertainty exists regarding the timing of these future events. Final resolution of these events is expected to occur over an extended period of time. However, based on currently available information it is expected that feasibility study approval and remedy selection could occur in 2009, remedy design and approval could occur during 2010, and remedy implementation could occur during 2010 to 2013, with some period of long-term monitoring for remedy effectiveness to follow.

In addition to the amounts currently reserved for environmental remediation, the Company may be subject to loss contingencies related to environmental matters estimated to be as much as $200 million to $300 million, which range is unchanged since December 31, 2007. Such unreserved losses are reasonably possible but are not currently considered to be probable of occurrence. This range of reasonably possible unreserved loss relates to environmental matters at a number of sites; however, about 40% of this range relates to additional costs at the former chromium manufacturing plant site and related sites in Jersey City, NJ, and about 30% relates to three operating PPG plant sites in our chemicals businesses. The loss contingencies related to these sites include significant unresolved issues such as the nature and extent of contamination at these sites and the methods that may have to be employed to remediate them.

 

30


Table of Contents

We expect to complete our evaluation of pre-acquisition SigmaKalon environmental remediation contingencies during the fourth quarter of 2008. As a result of the evaluation, it is reasonably possible that the amount of recorded reserves will increase resulting in an increase in goodwill and that the range of reasonably possible exposure to loss in excess of the amounts reserved may also increase.

The status of the remediation activity at the sites in New Jersey and at the Calcasieu River Estuary in Louisiana and the factors that could result in the need for additional environmental remediation reserves at those sites are described above. Initial remedial actions are occurring at the three operating plant sites in our chemicals businesses. These three operating plant sites include our Barberton, OH, Lake Charles, LA and Natrium, WV locations. At Barberton, we have completed a Facility Investigation and Corrective Measure Study (“CMS”) under USEPA’s Resource Conservation and Recycling Act (“RCRA”) Corrective Action Program. Currently, we are implementing the remediation alternatives recommended in the CMS using a performance-based approach with USEPA Region V oversight. Similarly, we have completed a Facility Investigation and CMS for our Lake Charles facility under the oversight of the LDEQ. The LDEQ has accepted our proposed remedial alternatives which are expected to be incorporated into the facility’s RCRA operating permit during 2009. Planning for or implementation of these proposed alternatives is in progress. At our Natrium facility, a facility investigation has been completed, initial interim remedial measures have been implemented to mitigate soil impacts but additional investigation is required to more fully define the nature and extent of groundwater contamination and to identify appropriate, additional remedial actions.

With respect to certain waste sites, the financial condition of any other potentially responsible parties also contributes to the uncertainty of estimating PPG’s final costs. Although contributors of waste to sites involving other potentially responsible parties may face governmental agency assertions of joint and several liability, in general, final allocations of costs are made based on the relative contributions of wastes to such sites. PPG is generally not a major contributor to such sites.

The impact of evolving programs, such as natural resource damage claims, industrial site reuse initiatives and state remediation programs, also adds to the present uncertainties with regard to the ultimate resolution of this unreserved exposure to future loss. The Company’s assessment of the potential impact of these environmental contingencies is subject to considerable uncertainty due to the complex, ongoing and evolving process of investigation and remediation, if necessary, of such environmental contingencies, and the potential for technological and regulatory developments.

This excerpt taken from the PPG 10-Q filed Jul 28, 2008.

Environmental Matters

It is PPG’s policy to accrue expenses for environmental contingencies when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. Reserves for environmental contingencies are exclusive of claims against third parties and are generally not discounted. In management’s opinion, the Company operates in an environmentally sound manner and the outcome of the Company’s environmental contingencies will not have a material effect on PPG’s financial position or liquidity; however, any such outcome may be material to the results of operations of any particular period in which costs, if any, are recognized. Management anticipates that the resolution of the Company’s environmental contingencies will occur over an extended period of time.

As of June 30, 2008 and December 31, 2007, PPG had reserves for environmental contingencies totaling $284 million and $276 million, respectively, of which $53 million and $57 million, respectively, were classified as current liabilities. Pretax charges against income for environmental remediation costs totaled $5 million and $7 million, respectively, for the three and six months ended June 30, 2008, and $2 million and $5 million, respectively, for the three and six months ended June 30, 2007, and are included in “Other charges” in the accompanying condensed consolidated statement of income. Cash outlays related to such environmental remediation aggregated $6 million and $8 million, respectively, for the three and six months ended June 30, 2008 and $5 million and $10 million, respectively, for the three and six months ended June 30, 2007. As part of the preliminary allocation of the SigmaKalon purchase price to the assets acquired and liabilities assumed, the PPG reserve for environmental contingencies was increased by $9 million in 2008.

 

26


Table of Contents

Charges for estimated environmental remediation costs in 2006 were significantly higher than our historical range. Our continuing efforts to analyze and assess the environmental issues associated with a former chromium manufacturing plant site located in Jersey City, NJ and at the Calcasieu River Estuary located near our Lake Charles, LA chlor-alkali plant resulted in a pre-tax charge of $173 million in the third quarter of 2006 for the estimated costs of remediating these sites. Excluding 2006, pretax charges against income have ranged between $10 million and $49 million per year for the past 15 years. We anticipate that charges against income in 2008 for environmental remediation costs will be within this historical range.

We expect cash outlays for environmental remediation costs to be approximately $40 million in 2008 and to range from $35 million to $60 million annually through 2012. It is possible that technological, regulatory and enforcement developments, the results of environmental studies and other factors could alter our expectations with respect to charges against income and future cash outlays. Specifically, the level of expected cash outlays is highly dependent upon activity related to the former chromium manufacturing plant site in New Jersey, as PPG awaits approval of workplans that have been submitted to the applicable regulatory agencies.

In New Jersey, PPG continues to perform its obligations under an Administrative Consent Order (“ACO”) with the New Jersey Department of Environmental Protection (“NJDEP”). Since 1990, PPG has remediated 47 of 61 residential and nonresidential sites under the ACO. The most significant of the 14 remaining sites is the former chromium manufacturing location in Jersey City. The principal contaminant of concern is hexavalent chromium. Based on current estimates, at least 500,000 tons of soil may be potentially impacted for all remaining sites. As of June 30, 2008 and December 31, 2007 PPG had reserves of $194 million and $195 million, respectively, for environmental contingencies associated with all New Jersey sites. The Company submitted a feasibility study work plan to the NJDEP in October 2006 that includes review of the available remediation technology alternatives for the former chromium manufacturing location. Under the feasibility study work plan, remedial alternatives which will be assessed include, but are not limited to, soil excavation and offsite disposal in a licensed disposal facility, in situ chemical stabilization of soil and groundwater, and in situ solidification of soils. A feasibility study is expected to be completed in 2009. In addition, PPG is planning to conduct Interim Remedial Measures (“IRMs”) at the site during 2008. Implementation of these IRMs will assist in the evaluation of remedial technologies required in the feasibility study. PPG has submitted a Remedial Action Work Plan for one other of the remaining sites under the ACO. This proposal has been submitted to the NJDEP for approval. In addition, investigation activities are ongoing for an additional six sites covered by the ACO adjacent to the former manufacturing site with completion expected in 2008. Investigation activities have not yet begun for the remaining six sites covered by the ACO, but we believe the results of the study at the former chromium manufacturing location will also provide us with relevant information concerning remediation alternatives at these sites.

As a result of the extensive analysis undertaken in connection with the preparation and submission of the feasibility study work plan for the former chromium manufacturing location described above, the Company recorded a pretax charge of $165 million in the third quarter of 2006. The charge included estimated costs for remediation at the 14 remaining ACO sites, including the former manufacturing site, and for the resolution of litigation filed by NJDEP in May 2005 as discussed below. The principal estimated cost elements of the third quarter 2006 charge and of the remaining reserve at June 30, 2008 were based on competitively derived or readily available remediation industry cost data for representative remedial options e.g., excavation and in situ stabilization/solidification. The major cost components are (i) in place soil treatment and transportation and disposal of excavated soil and (ii) construction services (related to soil excavation, groundwater management and site security), which account for

 

27


Table of Contents

approximately 50% and 30% of the reserve, respectively, as of June 30, 2008. The reserve also includes estimated costs for remedial investigation, interim remedial measures, engineering and project management. The most significant assumptions underlying the reserve are those related to the extent and concentration of chromium impacts in the soil, as these will determine the quantity of soil that must be treated in place, the quantity that will have to be excavated and transported for offsite disposal, and the nature of disposal required. The charges are exclusive of any third party indemnification, as management believes the likelihood of receiving any such amounts to be remote.

Multiple future events, including completion of feasibility studies, remedy selection, remedy design and remedy implementation involving governmental agency action or approvals will be required, and considerable uncertainty exists regarding the timing of these future events for the remaining 14 sites covered by the ACO. Final resolution of these events is expected to occur over an extended period of time. However, based on current information, it is expected that feasibility study approval and remedy selection could occur during 2009 for the former chromium plant and six adjacent sites, while remedy design and approval could occur during 2009 to 2010, and remedy implementation could occur during 2010 to 2014, with some period of long-term monitoring for remedy effectiveness to follow related to these seven sites. One other site is expected to be remediated during 2008 to 2009. Activities at the six other sites have not yet begun and the timing of future events related to these sites cannot be predicted at this time. As these events occur and to the extent that the cost estimates of the environmental remediation remedies change, the existing reserve for this environmental remediation will be adjusted. Based on current information, we expect cash outlays related to remediation efforts in New Jersey to range from $10 million to $15 million in 2008 and $30 million to $45 million annually from 2009 through 2012.

In May 2005, the NJDEP filed a complaint against PPG and two other former chromium producers seeking to hold the parties responsible for a further 53 sites where the source of chromium contamination is not known and to recover costs incurred by the agency in connection with its response activities at certain of those sites. This case is in discovery with ongoing mediation to resolve the allocation of these additional sites among the three companies.

In Lake Charles, the U.S. Environmental Protection Agency (“USEPA”) has completed investigation of contamination levels in the Calcasieu River Estuary and issued a Final Remedial Investigation Report in September 2003, which incorporates the Human Health and Ecological Risk Assessments, indicating that elevated levels of risk exist in the estuary. PPG and other potentially responsible parties are performing a feasibility study under the authority of the Louisiana Department of Environmental Quality (“LDEQ”). PPG’s exposure with respect to the Calcasieu Estuary is focused on the lower few miles of Bayou d’Inde, a small tributary to the Calcasieu Estuary near PPG’s Lake Charles facility, and about 150 to 200 acres of adjacent marshes. The Company and three other potentially responsible parties submitted a draft remediation feasibility study report to the LDEQ in October 2006. The proposed remedial alternatives include sediment dredging, sediment capping, and biomonitoring of fish and shellfish. Principal contaminants of concern which may require remediation include various metals, dioxins and furans, and polychlorinated biphenyls. In response to agency comments on the draft study, the companies conducted additional investigations and will be submitting an updated feasibility report to the agencies in the third quarter of 2008.

Multiple future events, such as feasibility study approval, remedy selection, remedy design and remedy implementation involving agency action or approvals will be required and considerable uncertainty exists regarding the timing of these future events. Final resolution of these events is expected to occur over an extended period of time. However, based on currently available

 

28


Table of Contents

information it is expected that feasibility study approval and remedy selection could occur in 2008, remedy design and approval could occur during 2008 or 2009, and remedy implementation could occur during 2009 to 2012 with some period of long-term monitoring for remedy effectiveness to follow.

In addition to the amounts currently reserved for environmental remediation, the Company may be subject to loss contingencies related to environmental matters estimated to be as much as $200 million to $300 million, which range is unchanged since December 31, 2007. Such unreserved losses are reasonably possible but are not currently considered to be probable of occurrence. This range of reasonably possible unreserved loss relates to environmental matters at a number of sites; however, about 40% of this range relates to additional costs at the former chromium manufacturing plant site and related sites in Jersey City, NJ, and about 30% relates to three operating PPG plant sites in our chemicals businesses. The loss contingencies related to these sites include significant unresolved issues such as the nature and extent of contamination at these sites and the methods that may have to be employed to remediate them.

The status of the remediation activity at the sites in New Jersey and at the Calcasieu River Estuary in Louisiana and the factors that could result in the need for additional environmental remediation reserves at those sites are described above. Initial remedial actions are occurring at the three operating plant sites in our chemicals businesses. These three operating plant sites include our Barberton, OH, Lake Charles, LA and Natrium, WV locations. At Barberton, we have completed a Facility Investigation and Corrective Measure Study (“CMS”) under USEPA’s Resource Conservation and Recycling Act (“RCRA”) Corrective Action Program. Currently, we are implementing the remediation alternatives recommended in the CMS using a performance-based approach with USEPA Region V oversight. Similarly, we have completed a Facility Investigation and CMS for our Lake Charles facility under the oversight of the LDEQ. The LDEQ has accepted our proposed remedial alternatives which are expected to be incorporated into the facility’s RCRA operating permit during 2008. Planning for or implementation of these proposed alternatives is in progress. At our Natrium facility, a Facility Investigation has been completed, initial interim remedial measures have been implemented to mitigate soil impacts but additional investigation is required to more fully define the nature and extent of groundwater contamination and to identify appropriate, additional remedial actions.

With respect to certain waste sites, the financial condition of any other potentially responsible parties also contributes to the uncertainty of estimating PPG’s final costs. Although contributors of waste to sites involving other potentially responsible parties may face governmental agency assertions of joint and several liability, in general, final allocations of costs are made based on the relative contributions of wastes to such sites. PPG is generally not a major contributor to such sites.

The impact of evolving programs, such as natural resource damage claims, industrial site reuse initiatives and state remediation programs, also adds to the present uncertainties with regard to the ultimate resolution of this unreserved exposure to future loss. The Company’s assessment of the potential impact of these environmental contingencies is subject to considerable uncertainty due to the complex, ongoing and evolving process of investigation and remediation, if necessary, of such environmental contingencies, and the potential for technological and regulatory developments.

This excerpt taken from the PPG 10-Q filed Apr 28, 2008.

Environmental Matters

It is PPG’s policy to accrue expenses for environmental contingencies when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. Reserves for environmental contingencies are exclusive of claims against third parties and are generally not discounted. In management’s opinion, the Company operates in an environmentally sound manner and the outcome of the Company’s environmental contingencies will not have a material effect on PPG’s financial position or liquidity; however, any such outcome may be material to the results of operation of any particular period in which costs, if any, are recognized. Management anticipates that the resolution of the Company’s environmental contingencies will occur over an extended period of time.

As of March 31, 2008 and December 31, 2007, PPG had reserves for environmental contingencies totaling $285 million and $276 million, respectively, of which $56 million and $57 million, respectively, were classified as current liabilities. Pretax charges against income for environmental remediation costs totaled $2 million and $3 million for the three months ended March 31, 2008 and 2007, respectively, and are included in “Other charges” in the accompanying condensed consolidated statement of income. Cash outlays related to such environmental remediation aggregated $2 million and $5 million for the three months ended March 31, 2008 and 2007, respectively. As part of the preliminary allocation of the SigmaKalon purchase price to the assets acquired and liabilities assumed, the liability for environmental contingencies was increased by $9 million.

Charges for estimated environmental remediation costs in 2006 were significantly higher than our historical range. Our continuing efforts to analyze and assess the environmental issues associated with a former chromium manufacturing plant site located in Jersey City, NJ and at the Calcasieu River Estuary located near our Lake Charles, LA chlor-alkali plant resulted in a pre-tax charge of $173 million in the third quarter of 2006 for the estimated costs of remediating these sites. Excluding 2006, pretax charges against income have ranged between $10 million and $49 million per year for the past 15 years. We anticipate that charges against income in 2008 for environmental remediation costs will be within this historical range.

We expect cash outlays for environmental remediation costs to be approximately $40 million in 2008 and to range from $35 million to $60 million annually through 2012. It is possible that technological, regulatory and enforcement developments, the results of environmental studies and other factors could alter our expectations with respect to charges against income and future cash outlays. Specifically, the level of expected cash outlays is highly dependent upon activity related to the former chromium manufacturing plant site in New Jersey, as PPG awaits approval of workplans that have been submitted to the applicable regulatory agencies.

In New Jersey, PPG continues to perform its obligations under an Administrative Consent Order (“ACO”) with the New Jersey Department of Environmental Protection (“NJDEP”). Since 1990, PPG has remediated 47 of 61 residential and nonresidential sites under the ACO. The most significant of the 14 remaining sites is the former chromium manufacturing location in Jersey City. The principal contaminant of concern is hexavalent chromium. Based on current estimates, at least 500,000 tons of soil may be potentially impacted for all remaining sites. As of March 31, 2008 and December 31, 2007 PPG had reserves of $194 million and $195 million, respectively, for environmental contingencies associated with all New Jersey sites. The Company submitted a feasibility study work plan to the NJDEP in October 2006 that includes review of the available remediation technology alternatives for the former chromium manufacturing location. Under the feasibility study work plan, remedial alternatives which will be assessed include, but are not limited to, soil excavation and offsite disposal in a licensed

 

27


Table of Contents

disposal facility, in situ chemical stabilization of soil and groundwater, and in situ solidification of soils. A feasibility study is expected to be completed in 2009. In addition, PPG is planning to conduct Interim Remedial Measures (“IRMs”) at the site during 2008. Implementation of these IRMs will assist in the evaluation of remedial technologies required in the feasibility study. PPG has submitted a Remedial Action Work Plan for one other of the remaining sites under the ACO. This proposal has been submitted to the NJDEP for approval. In addition, investigation activities are ongoing for an additional six sites covered by the ACO adjacent to the former manufacturing site with completion expected in 2008. Investigation activities have not yet begun for the remaining six sites covered by the ACO, but we believe the results of the study at the former chromium manufacturing location will also provide us with relevant information concerning remediation alternatives at these sites.

As a result of the extensive analysis undertaken in connection with the preparation and submission of the feasibility study work plan for the former chromium manufacturing location described above, the Company recorded a pretax charge of $165 million in the third quarter of 2006. The charge included estimated costs for remediation at the 14 remaining ACO sites, including the former manufacturing site, and for the resolution of litigation filed by NJDEP in May 2005 as discussed below. The principal estimated cost elements of the third quarter 2006 charge and of the remaining reserve at March 31, 2008 were based on competitively derived or readily available remediation industry cost data for representative remedial options e.g., excavation and in situ stabilization/solidification. The major cost components are (i) in place soil treatment and transportation and disposal of excavated soil and (ii) construction services (related to soil excavation, groundwater management and site security), which account for approximately 50% and 30% of the reserve, respectively, as of March 31, 2008. The reserve also includes estimated costs for remedial investigation, interim remedial measures, engineering and project management. The most significant assumptions underlying the reserve are those related to the extent and concentration of chromium impacts in the soil, as these will determine the quantity of soil that must be treated in place, the quantity that will have to be excavated and transported for offsite disposal, and the nature of disposal required. The charges are exclusive of any third party indemnification, as management believes the likelihood of receiving any such amounts to be remote.

Multiple future events, including completion of feasibility studies, remedy selection, remedy design and remedy implementation involving governmental agency action or approvals will be required, and considerable uncertainty exists regarding the timing of these future events for the remaining 14 sites covered by the ACO. Final resolution of these events is expected to occur over an extended period of time. However, based on current information, it is expected that feasibility study approval and remedy selection could occur during 2009 for the former chromium plant and six adjacent sites, while remedy design and approval could occur during 2009 to 2010, and remedy implementation could occur during 2010 to 2014, with some period of long-term monitoring for remedy effectiveness to follow related to these seven sites. One other site is expected to be remediated during 2008 to 2009. Activities at the six other sites have not yet begun and the timing of future events related to these sites cannot be predicted at this time. As these events occur and to the extent that the cost estimates of the environmental remediation remedies change, the existing reserve for this environmental remediation will be adjusted. Based on current information, we expect cash outlays related to remediation efforts in New Jersey to range from $15 million to $20 million in 2008 and $30 million to $45 million annually from 2009 through 2012.

In May 2005, the NJDEP filed a complaint against PPG and two other former chromium producers seeking to hold the parties responsible for a further 53 sites where the source of chromium contamination is not known and to recover costs incurred by the agency in connection with its response activities at certain of those sites. This case is in discovery with ongoing mediation to resolve the allocation of these additional sites among the three companies.

 

28


Table of Contents

In Lake Charles, the U.S. Environmental Protection Agency (“USEPA”) has completed investigation of contamination levels in the Calcasieu River Estuary and issued a Final Remedial Investigation Report in September 2003, which incorporates the Human Health and Ecological Risk Assessments, indicating that elevated levels of risk exist in the estuary. PPG and other potentially responsible parties are performing a feasibility study under the authority of the Louisiana Department of Environmental Quality (“LDEQ”). PPG’s exposure with respect to the Calcasieu Estuary is focused on the lower few miles of Bayou d’Inde, a small tributary to the Calcasieu Estuary near PPG’s Lake Charles facility, and about 150 to 200 acres of adjacent marshes. The Company and three other potentially responsible parties submitted a draft remediation feasibility study report to the LDEQ in October 2006. The proposed remedial alternatives include sediment dredging, sediment capping, and biomonitoring of fish and shellfish. Principal contaminants of concern which may require remediation include various metals, dioxins and furans, and polychlorinated biphenyls. In response to agency comments on the draft study, the companies are undertaking additional investigation and will update the study. As a result of the analysis undertaken in connection with the preparation and submission of the draft feasibility study, PPG recorded a pretax charge of $8 million in the third quarter of 2006 for its estimated share of the remediation costs at this site.

Multiple future events, such as feasibility studies, remedy selection, remedy design and remedy implementation involving agency action or approvals will be required and considerable uncertainty exists regarding the timing of these future events. Final resolution of these events is expected to occur over an extended period of time. However, based on currently available information it is expected that feasibility study approval and remedy selection could occur in 2008, remedy design and approval could occur during 2008 or 2009, and remedy implementation could occur during 2009 to 2012 with some period of long-term monitoring for remedy effectiveness to follow.

In addition to the amounts currently reserved for environmental remediation, the Company may be subject to loss contingencies related to environmental matters estimated to be as much as $200 million to $300 million, which range is unchanged since December 31, 2007. Such unreserved losses are reasonably possible but are not currently considered to be probable of occurrence. This range of reasonably possible unreserved loss relates to environmental matters at a number of sites; however, about 40% of this range relates to additional costs at the former chromium manufacturing plant site and related sites in Jersey City, NJ, and about 30% relates to three operating PPG plant sites in our chemicals businesses. The loss contingencies related to these sites include significant unresolved issues such as the nature and extent of contamination at these sites and the methods that may have to be employed to remediate them.

The status of the remediation activity at the sites in New Jersey and at the Calcasieu River Estuary in Louisiana and the factors that could result in the need for additional environmental remediation reserves at those sites are described above. Initial remedial actions are occurring at the three operating plant sites in our chemicals businesses. These three operating plant sites include our Barberton, OH, Lake Charles, LA and Natrium, WV locations. At Barberton, we have completed a Facility Investigation and Corrective Measure Study (“CMS”) under USEPA’s Resource Conservation and Recycling Act (“RCRA”) Corrective Action Program. Currently, we are implementing the remediation alternatives recommended in the CMS using a performance-based approach with USEPA Region V oversight. Similarly, we have completed a Facility Investigation and CMS for our Lake Charles facility under the oversight of the LDEQ. The LDEQ has accepted our proposed remedial alternatives which are expected to be incorporated

 

29


Table of Contents

into the facility’s RCRA operating permit during 2008. Planning for or implementation of these proposed alternatives is in progress. At our Natrium facility, a Facility Investigation has been completed, initial interim remedial measures have been implemented to mitigate soil impacts but additional investigation is required to more fully define the nature and extent of groundwater contamination and to identify appropriate, additional remedial actions.

With respect to certain waste sites, the financial condition of any other potentially responsible parties also contributes to the uncertainty of estimating PPG’s final costs. Although contributors of waste to sites involving other potentially responsible parties may face governmental agency assertions of joint and several liability, in general, final allocations of costs are made based on the relative contributions of wastes to such sites. PPG is generally not a major contributor to such sites.

The impact of evolving programs, such as natural resource damage claims, industrial site reuse initiatives and state remediation programs, also adds to the present uncertainties with regard to the ultimate resolution of this unreserved exposure to future loss. The Company’s assessment of the potential impact of these environmental contingencies is subject to considerable uncertainty due to the complex, ongoing and evolving process of investigation and remediation, if necessary, of such environmental contingencies, and the potential for technological and regulatory developments.

These excerpts taken from the PPG 10-K filed Feb 21, 2008.

Environmental Matters

PPG is subject to existing and evolving standards relating to protection of the environment. Capital expenditures for environmental control projects were $16 million, $14 million and $18 million in 2007, 2006 and 2005, respectively. It is expected that expenditures for such projects in 2008 will approximate $31 million. Although future capital expenditures are difficult to estimate accurately because of constantly changing regulatory standards and policies, it can be anticipated that environmental control standards will become increasingly stringent and the cost of compliance will increase.

 

Prior to 2007, about 20% of our chlor-alkali production capacity used mercury cell technology. PPG strives to operate these cells in accordance with applicable laws and regulations, and these cells are reviewed at least

 

14   2007 PPG ANNUAL REPORT AND FORM 10-K


Table of Contents

 

annually by state authorities. The U.S. Environmental Protection Agency (“USEPA”) has issued new regulations imposing significantly more stringent requirements on mercury emissions. These new rules took effect in December 2006. In order to meet the USEPA’s new air quality standards, a decision was made in July 2005 to replace the existing mercury cell production unit at the Lake Charles, LA chlor-alkali plant with newer membrane cell technology. The Louisiana Department of Environmental Quality granted the Company a one year extension to meet the new requirements on mercury emissions. This capital project began in 2005 and was completed in 2007. With the completion of this project, 4% of PPG’s chlor-alkali production uses mercury cell technology.

 

PPG is negotiating with various government agencies concerning 94 current and former manufacturing sites and offsite waste disposal locations, including 22 sites on the National Priority List. The number of sites is comparable with the prior year. While PPG is not generally a major contributor of wastes to these offsite waste disposal locations, each potentially responsible party may face governmental agency assertions of joint and several liability. Generally, however, a final allocation of costs is made based on relative contributions of wastes to the site. There is a wide range of cost estimates for cleanup of these sites, due largely to uncertainties as to the nature and extent of their condition and the methods that may have to be employed for their remediation. The Company has established reserves for those sites where it is probable that a liability has been incurred and the amount can be reasonably estimated. As of December 31, 2007 and 2006, PPG had reserves for environmental contingencies totaling $276 million and $282 million, respectively, of which $57 million and $65 million, respectively, were classified as current liabilities. Pretax charges against income for environmental remediation costs in 2007, 2006 and 2005 totaled $12 million, $207 million and $27 million, respectively. Cash outlays related to such environmental remediation aggregated $19 million, $22 million and $14 million in 2007, 2006 and 2005, respectively. Environmental remediation of a former chromium manufacturing plant site and associated sites in Jersey City, NJ represented the major part of our 2006 environmental charges and our existing reserves. Included in the amounts mentioned above were $185 million of 2006 charges against income and $195 million and $198 million in reserves at December 31, 2007 and 2006, respectively associated with all New Jersey chromium sites.

 

The Company’s experience to date regarding environmental matters leads PPG to believe that it will have continuing expenditures for compliance with provisions regulating the protection of the environment and for present and future remediation efforts at waste and plant sites. Management anticipates that such expenditures will occur over an extended period of time.

 

Charges for estimated environmental remediation costs in 2006 were significantly higher than our historical range. Our continuing efforts to analyze and assess the environmental issues associated with a former chromium manufacturing plant site located in Jersey City, NJ and the Calcasieu River Estuary located near our Lake Charles, LA chlor-alkali plant resulted in a pre-tax charge of $173 million in the third quarter of 2006 for the estimated costs of remediating these sites. Excluding 2006, pre-tax charges against income have ranged between $10 million and $49 million per year for the past 15 years. We anticipate that charges against income in 2008 for environmental remediation costs will be within this historical range.

 

In management’s opinion, the Company operates in an environmentally sound manner, is well positioned, relative to environmental matters, within the industries in which it operates, and the outcome of these environmental contingencies will not have a material adverse effect on PPG’s financial position or liquidity; however, any such outcome may be material to the results of operations of any particular period in which costs, if any, are recognized. See Note 15, “Commitments and Contingent Liabilities,” under Item 8 of this Form 10-K for additional information related to environmental matters.

 

There are growing public and governmental concerns related to climate change, which have led to efforts to limit the greenhouse gas (“GHG”) emissions believed to be responsible. These concerns were reflected in the 2005 framework for GHG reduction under the Kyoto Protocol to the United Nations Framework Convention on Climate Change. The Kyoto Protocol has been adopted by many countries where PPG operates, including the European Union and Canada, but not in the U.S. The European Union has implemented a cap and trade approach with a mandatory emissions trading scheme for GHGs. In December 2007, delegates to the United Nations Framework Convention on Climate Change reached agreement on development of a plan for the second phase of Kyoto, scheduled to start in 2013. This could potentially lead to further reduction requirements. A substantial portion of PPG’s GHG emissions are generated by locations in the U.S.; however, at this time it is uncertain whether the U.S. will set GHG reduction goals under the Kyoto Protocol or by some other mechanism. PPG has joined the U.S.-based Climate Registry to assist in verification of current and future GHG reduction achievements in preparation for potential imposition in the U.S. of GHG reduction goals.

 

Energy prices and scarcity of supply continue to be a concern for major energy users. Since PPG’s GHG emissions arise principally from combustion of fossil fuels, PPG has for some time recognized the desirability of reducing energy consumption and GHG generation. We committed under the Business Roundtable’s Climate

 

2007 PPG ANNUAL REPORT AND FORM 10-K   15


Table of Contents

 

RESOLVE program to reduce our GHG intensity (GHGs produced per million dollars of revenue) by 18% between 2002 and 2012. PPG achieved this target in 2006, six years ahead of schedule. Recognizing the continuing importance of this matter, PPG has appointed an Energy Security and Climate Change Steering Group to guide the Company’s progress in this area. Additionally, in 2007 PPG announced new corporate targets, namely (i) a reduction in energy intensity by 25% from 2006 to 2016 and (ii) a 10% absolute reduction in GHG emissions from 2006 to 2011. PPG’s public disclosure on energy security and climate change can be viewed at the Carbon Disclosure Project www.cdproject.net.

 

Environmental Matters

STYLE="margin-top:0px;margin-bottom:0px">PPG is subject to existing and evolving standards relating to protection of the environment. Capital expenditures for environmental control projects were $16 million, $14
million and $18 million in 2007, 2006 and 2005, respectively. It is expected that expenditures for such projects in 2008 will approximate $31 million. Although future capital expenditures are difficult to estimate accurately because of constantly
changing regulatory standards and policies, it can be anticipated that environmental control standards will become increasingly stringent and the cost of compliance will increase.

SIZE="1"> 

Prior to 2007, about 20% of our chlor-alkali production capacity used mercury cell technology. PPG strives to operate these
cells in accordance with applicable laws and regulations, and these cells are reviewed at least

 













14 2007 PPG ANNUAL REPORT AND FORM 10-K






Table of Contents


 


annually by state authorities. The U.S. Environmental Protection Agency (“USEPA”) has issued new regulations imposing significantly more stringent
requirements on mercury emissions. These new rules took effect in December 2006. In order to meet the USEPA’s new air quality standards, a decision was made in July 2005 to replace the existing mercury cell production unit at the Lake Charles,
LA chlor-alkali plant with newer membrane cell technology. The Louisiana Department of Environmental Quality granted the Company a one year extension to meet the new requirements on mercury emissions. This capital project began in 2005 and was
completed in 2007. With the completion of this project, 4% of PPG’s chlor-alkali production uses mercury cell technology.

 

STYLE="margin-top:0px;margin-bottom:0px; text-indent:3%">PPG is negotiating with various government agencies concerning 94 current and former manufacturing sites and offsite waste disposal locations, including
22 sites on the National Priority List. The number of sites is comparable with the prior year. While PPG is not generally a major contributor of wastes to these offsite waste disposal locations, each potentially responsible party may face
governmental agency assertions of joint and several liability. Generally, however, a final allocation of costs is made based on relative contributions of wastes to the site. There is a wide range of cost estimates for cleanup of these sites, due
largely to uncertainties as to the nature and extent of their condition and the methods that may have to be employed for their remediation. The Company has established reserves for those sites where it is probable that a liability has been incurred
and the amount can be reasonably estimated. As of December 31, 2007 and 2006, PPG had reserves for environmental contingencies totaling $276 million and $282 million, respectively, of which $57 million and $65 million, respectively, were classified
as current liabilities. Pretax charges against income for environmental remediation costs in 2007, 2006 and 2005 totaled $12 million, $207 million and $27 million, respectively. Cash outlays related to such environmental remediation aggregated $19
million, $22 million and $14 million in 2007, 2006 and 2005, respectively. Environmental remediation of a former chromium manufacturing plant site and associated sites in Jersey City, NJ represented the major part of our 2006 environmental charges
and our existing reserves. Included in the amounts mentioned above were $185 million of 2006 charges against income and $195 million and $198 million in reserves at December 31, 2007 and 2006, respectively associated with all New Jersey chromium
sites.

 

The Company’s experience to date regarding
environmental matters leads PPG to believe that it will have continuing expenditures for compliance with provisions regulating the protection of the environment and for present and future remediation efforts at waste and plant sites. Management
anticipates that such expenditures will occur over an extended period of time.

 

FACE="Times New Roman" SIZE="2">Charges for estimated environmental remediation costs in 2006 were significantly higher than our historical range. Our continuing efforts to analyze and assess the environmental issues associated with a former
chromium manufacturing plant site located in Jersey City, NJ and the Calcasieu River Estuary located near our Lake Charles, LA chlor-alkali plant resulted in a pre-tax charge of $173 million in the third quarter of 2006 for the estimated costs of
remediating these sites. Excluding 2006, pre-tax charges against income have ranged between $10 million and $49 million per year for the past 15 years. We anticipate that charges against income in 2008 for environmental remediation costs will be
within this historical range.

 

In management’s opinion,
the Company operates in an environmentally sound manner, is well positioned, relative to environmental matters, within the industries in which it operates, and the outcome of these environmental contingencies will not have a material adverse effect
on PPG’s financial position or liquidity; however, any such outcome may be material to the results of operations of any particular period in which costs, if any, are recognized. See Note 15, “Commitments and Contingent Liabilities,”
under Item 8 of this Form 10-K for additional information related to environmental matters.

 

FACE="Times New Roman" SIZE="2">There are growing public and governmental concerns related to climate change, which have led to efforts to limit the greenhouse gas (“GHG”) emissions believed to be responsible. These concerns were reflected
in the 2005 framework for GHG reduction under the Kyoto Protocol to the United Nations Framework Convention on Climate Change. The Kyoto Protocol has been adopted by many countries where PPG operates, including the European Union and Canada, but not
in the U.S. The European Union has implemented a cap and trade approach with a mandatory emissions trading scheme for GHGs. In December 2007, delegates to the United Nations Framework Convention on Climate Change reached agreement on development of
a plan for the second phase of Kyoto, scheduled to start in 2013. This could potentially lead to further reduction requirements. A substantial portion of PPG’s GHG emissions are generated by locations in the U.S.; however, at this time it is
uncertain whether the U.S. will set GHG reduction goals under the Kyoto Protocol or by some other mechanism. PPG has joined the U.S.-based Climate Registry to assist in verification of current and future GHG reduction achievements in preparation for
potential imposition in the U.S. of GHG reduction goals.

 

SIZE="2">Energy prices and scarcity of supply continue to be a concern for major energy users. Since PPG’s GHG emissions arise principally from combustion of fossil fuels, PPG has for some time recognized the desirability of reducing energy
consumption and GHG generation. We committed under the Business Roundtable’s Climate

 













2007 PPG ANNUAL REPORT AND FORM 10-K 15






Table of Contents


 


RESOLVE program to reduce our GHG intensity (GHGs produced per million dollars of revenue) by 18% between 2002 and 2012. PPG achieved this target in 2006,
six years ahead of schedule. Recognizing the continuing importance of this matter, PPG has appointed an Energy Security and Climate Change Steering Group to guide the Company’s progress in this area. Additionally, in 2007 PPG announced new
corporate targets, namely (i) a reduction in energy intensity by 25% from 2006 to 2016 and (ii) a 10% absolute reduction in GHG emissions from 2006 to 2011. PPG’s public disclosure on energy security and climate change can be viewed at the
Carbon Disclosure Project www.cdproject.net.

 

COLOR="#0c4f87">Available Information

The Company’s website address is www.ppg.com. The Company posts, and shareholders may
access without charge, the Company’s recent filings and any amendments thereto of its annual reports on Form 10-K, quarterly reports on Form 10-Q and its proxy statements as soon as reasonably practicable after such reports are filed with the
Securities and Exchange Commission (“SEC”). The Company also posts all financial press releases and earnings releases to its website. All other reports filed or furnished to the SEC, including reports on Form 8-K, are available via direct
link on PPG’s website to the SEC’s website, www.sec.gov. Reference to the Company’s and SEC’s websites herein does not incorporate by reference any information contained on those websites and such information should not be
considered part of this Form 10-K.

 

This excerpt taken from the PPG 10-K filed Feb 21, 2007.

Environmental Matters

PPG is subject to existing and evolving standards relating to protection of the environment. Capital expenditures for environmental control projects were $14 million, $18 million and $11 million in 2006, 2005 and 2004, respectively. It is expected that expenditures for such projects in 2007 will approximate $24 million. Although future capital expenditures are difficult to estimate accurately because of constantly changing regulatory standards and policies, it can be anticipated that environmental control standards will become increasingly stringent and the cost of compliance will increase.

 

Additionally, about 20% of our chlor-alkali production capacity currently utilizes mercury cell technology. We strive to operate these cells in accordance with applicable laws and regulations, and these cells are reviewed at least annually by state authorities. The U.S. Environmental Protection Agency (“USEPA”) has issued new regulations imposing significantly more stringent requirements on mercury emissions. These new rules took effect in December 2006. In order to meet the USEPA’s new air quality standards, in July 2005, a decision was made to replace the existing mercury cell production unit at our Lake Charles, LA chlor-alkali plant with newer membrane cell technology. The Louisiana Department of Environmental Quality has granted a one year extension to meet the new requirements on mercury emissions. This capital project began in 2005 and will continue through mid-2007. We do not expect the project to materially increase PPG’s total capital spending in 2007.

 

PPG is negotiating with various government agencies concerning 95 current and former manufacturing sites and offsite waste disposal locations, including 22 sites on the National Priority List. The number of sites is comparable with the prior year. While PPG is not generally a major contributor of wastes to these offsite waste disposal locations, each potentially responsible party may face governmental agency assertions of joint and several liability. Generally, however, a final allocation of costs is made based on relative contributions of wastes to the site. There is a wide range of cost estimates for cleanup of these sites, due largely to uncertainties as to the nature and extent of their condition and the methods that may have to be employed for their remediation. The Company has established reserves for those sites where it is probable that a liability has been incurred and the amount can be reasonably estimated. As of Dec. 31, 2006 and 2005, PPG had reserves for environmental contingencies totaling $282 million and $94 million, respectively, of which $65 million and $29 million, respectively, were classified as current liabilities. Pretax charges against income for environmental remediation costs in 2006, 2005 and 2004 totaled $207 million, $27 million and $15 million, respectively. Cash outlays related to such environmental remediation aggregated $22 million, $14 million and $26 million in 2006, 2005 and 2004, respectively. Environmental remediation of a former chromium manufacturing plant site and associated sites in Jersey City, NJ represents the major part of our 2006 environmental charges and reserves. Included in the amounts mentioned above were $185 million of 2006 charges against income and $198 million in reserves at Dec. 31, 2006 associated with all New Jersey chromium sites.

 

The Company’s experience to date regarding environmental matters leads PPG to believe that it will have continuing expenditures for compliance with provisions regulating the protection of the environment and for present and future remediation efforts at waste and plant sites. Management anticipates that such expenditures will occur over an extended period of time. Over the 15 years prior to 2006, the pretax charges against income ranged between $10 million and $49 million per year. Charges for estimated environmental remediation costs in 2006 were significantly higher than our historical range as a result of our continuing efforts to analyze and assess the environmental issues associated with a former chromium manufacturing plant site located in Jersey City, NJ and at the Calcasieu River Estuary located near our Lake Charles, LA chlor-alkali plant, which efforts resulted in a pre-tax charge of $173 million in the third quarter of 2006 for the estimated costs of remediating these sites. We anticipate that charges against income in 2007 for environmental remediation costs will be within the prior historical range. In management’s opinion, the Company operates in an environmentally sound manner, is well positioned, relative to environmental matters, within the industries in which it operates, and the outcome of these environmental contingencies will not have a material adverse effect on PPG’s financial position or liquidity; however, any such outcome may be material to the results of operations of any particular period in which costs, if any, are recognized. See Note 14, “Commitments and Contingent Liabilities,” under Item 8 of this Form 10-K for additional information related to environmental matters.

 

14   2006 PPG ANNUAL REPORT AND FORM 10-K


Table of Contents

 

Wikinvest © 2006, 2007, 2008, 2009, 2010, 2011, 2012. Use of this site is subject to express Terms of Service, Privacy Policy, and Disclaimer. By continuing past this page, you agree to abide by these terms. Any information provided by Wikinvest, including but not limited to company data, competitors, business analysis, market share, sales revenues and other operating metrics, earnings call analysis, conference call transcripts, industry information, or price targets should not be construed as research, trading tips or recommendations, or investment advice and is provided with no warrants as to its accuracy. Stock market data, including US and International equity symbols, stock quotes, share prices, earnings ratios, and other fundamental data is provided by data partners. Stock market quotes delayed at least 15 minutes for NASDAQ, 20 mins for NYSE and AMEX. Market data by Xignite. See data providers for more details. Company names, products, services and branding cited herein may be trademarks or registered trademarks of their respective owners. The use of trademarks or service marks of another is not a representation that the other is affiliated with, sponsors, is sponsored by, endorses, or is endorsed by Wikinvest.