|
|
![]() | ![]() | ![]() | ![]() |
| |||||||||
This excerpt taken from the PCG 10-K filed Feb 18, 2005. 17.3. ISO System Studies and Operating Procedures. 17.3.1 System Studies and Grid Stability Analyses. The ISO, in coordination with Participating TOs, shall perform system operating studies or grid stability analyses to evaluate forecasted changes in grid conditions that could affect its ability to ensure compliance with the Applicable Reliability Criteria. The results and reports from such studies shall be exchanged between the ISO and the Participating TOs. Study results and conclusions shall generally be assessed annually, and shall be updated as necessary, based on changing grid and local area conditions. 17.3.2 Grid Conditions Affecting Regulations, Permits and Licenses. The ISO shall promulgate and maintain Operating Procedures to ensure that impaired or potentially degraded grid conditions are assessed and immediately communicated to the Participating TOs for operability determinations required by applicable regulations, permits or licenses, such as NRC operating licenses for nuclear generating units. |
| |||||||