This excerpt taken from the PCG 10-K filed Feb 18, 2005. 7.3. Unscheduled Maintenance. 7.3.1 Notification. A Participating TO shall notify the ISO of any faults on the ISO Controlled Grid or any actual or anticipated Forced Outages as soon as it becomes aware of them, in accordance with Section 2.3.3 of the ISO Tariff. 7.3.2 Returns to Service. The Participating TO shall take all steps necessary, consistent with Good Utility Practice and in accordance with the ISO Tariff and ISO Protocols, to prevent Forced Outages and to return to operation, as soon as possible, any facility under the ISO's Operational Control that is the subject of a Forced Outage. |
| |||||||