|
|
![]() | ![]() | ![]() | ![]() |
This excerpt taken from the PBR 6-K filed Dec 21, 2007. Gas Pipelines
- Construction and assembly of the Cacimbas (ES) Catu (BA) section - an integral part of GASENE, with a length of 946 km and a maximum capacity of 20 million m3 / day. The line will interconnect the Southeast and Northeast Networks, introducing a greater degree of flexibility in the supply of gas to the Northeast of Brazil.
www.petrobras.com.br/ri/english This document may contain forecasts that merely reflect the expectations of the Companys management. Such terms as anticipate, believe, expect, forecast, intend, plan, project, seek, should, along with similar or analogous expressions, are used to identify such forecasts. These predictions evidently involve risks and uncertainties, whether foreseen or not by the Company. Therefore, the future results of operations may differ from current expectations, and readers must not base their expectations exclusively on the information presented herein.
- Unveiling of commercial operations of the Cabiúnas (RJ) Vitória (ES) gas pipeline, 302 km long with a capacity of up to 20 million de m3 / day of natural gas and enabling part of the natural gas production from the
Espírito Santo Basin to be integrated with the Southeast network. |
| |||||||