Thermoelectric Power Plants
- Commercial operations to be unveiled at the Jesus Soares Pereira Thermoelectric Power Plant (RN) with an installed capacity of 340 MW.
- Conclusion of the conversions to bi-fuel operations at the following Thermoelectric Power Plants: Sepé Tiaraju (Canoas-RS), Barbosa Lima Sobrinho (Eletrobolt-RJ) and Termoceará (CE). With an installed capacity of 161 MW, 386 MW and
220 MW respectively.