This excerpt taken from the PAA 10-Q filed May 8, 2009.

Litigation

 

Pipeline Releases.  In January 2005 and December 2004, we experienced two unrelated releases of crude oil that reached rivers located near the sites where the releases originated. In early January 2005, an overflow from a temporary storage tank located in East Texas resulted in the release of approximately 1,200 barrels of crude oil, a portion of which reached the Sabine River. In late December 2004, one of our pipelines in West Texas experienced a rupture that resulted in the release of approximately 4,500 barrels of crude oil, a portion of which reached a remote location of the Pecos River. In both cases, emergency response personnel under the supervision of a unified command structure consisting of representatives of Plains, the EPA, the Texas Commission on Environmental Quality and the Texas Railroad Commission conducted clean-up operations at each site. Approximately 980 and 4,200 barrels were recovered from the two respective sites. The unrecovered oil was removed or otherwise addressed by us in the course of site remediation. Aggregate costs associated with the releases, including estimated remediation costs, are estimated to be approximately $4 million to $5 million. In cooperation with the

 

21



Table of Contents

 

appropriate state and federal environmental authorities, we have completed our work with respect to site restoration, subject to some ongoing remediation at the Pecos River site. EPA has referred these two crude oil releases, as well as several other smaller releases, to the U.S. Department of Justice (the “DOJ”) for further investigation in connection with a civil penalty enforcement action under the Federal Clean Water Act. We have cooperated in the investigation and are currently involved in settlement discussions with DOJ and EPA. Our assessment is that it is probable we will pay penalties related to the releases. We may also be subjected to injunctive remedies that would impose additional requirements, costs and constraints on our operations. We have accrued our current estimate of the likely penalties as a loss contingency, which is included in the estimated aggregate costs set forth above. We understand that the maximum permissible penalty, if any, that EPA could assess with respect to the subject releases under relevant statutes would be approximately $6.8 million. Such statutes contemplate the potential for substantial reduction in penalties based on mitigating circumstances and factors. We believe that several of such circumstances and factors exist, and thus have been a primary focus in our discussions with the DOJ and EPA with respect to these matters.

 

SemCrude Bankruptcy.  We will from time to time have claims relating to insolvent suppliers, customers or counterparties, such as the bankruptcy proceedings of SemCrude. As a result of our statutory protections and contractual rights of setoff, substantially all of our pre-petition claims against SemCrude should be satisfied. Certain creditors of SemCrude and its affiliates have challenged our contractual and statutory rights to setoff certain of our payables to the debtor against our receivables from the debtor. The aggregate amount subject to challenge is approximately $62 million. We intend to vigorously defend our contractual and statutory rights.

 

On November 15, 2006, we completed the Pacific merger. The following is a summary of the more significant matters that relate to Pacific, its assets or operations.

 

United States of America v. Pacific Pipeline System, LLC (“PPS”).  In March 2005, a release of approximately 3,400 barrels of crude oil occurred on Line 63, subsequently acquired by us in the Pacific merger. The release occurred when the pipeline was severed as a result of a landslide caused by heavy rainfall in the Pyramid Lake area of Los Angeles County. Total projected emergency response, remediation and restoration costs are approximately $26 million, substantially all of which have been incurred and recovered under a pre-existing PPS pollution liability insurance policy.  In September 2008, the EPA filed a civil complaint against PPS, a subsidiary acquired in the Pacific merger, in connection with the Pyramid Lake release. The complaint, which was filed in the Federal District Court for the Central District of California, Civil Action No. CV08-5768DSF(SSX), seeks the maximum permissible penalty under the relevant statutes of approximately $3.7 million. The EPA and DOJ have discretion to reduce the fine, if any, after considering other mitigating factors. Because of the uncertainty associated with these factors, the final amount of the fine that will be assessed for the alleged offenses cannot be ascertained. We may also be subjected to injunctive remedies that would impose additional requirements, costs and constraints on our operations. We will defend against these charges. We believe that several defenses and mitigating circumstances and factors exist that could substantially reduce any penalty or fine that might be imposed by the EPA and DOJ, and intend to pursue discussions with the EPA and DOJ regarding such defenses and mitigating circumstances and factors. Although we have established an estimated loss contingency for this matter, we are presently unable to determine whether the March 2005 spill incident may result in a loss in excess of our accrual for this matter. Discussions with the DOJ on behalf of the EPA to resolve this matter have commenced.

 

Exxon v. GATX.  This Pacific legacy matter involves the allocation of responsibility for remediation of MTBE (and other petroleum product) contamination at the Pacific Atlantic Terminals LLC (“PAT”) facility at Paulsboro, New Jersey. The

 

22



Table of Contents

 

estimated maximum potential remediation cost ranges up to $10 million. Both Exxon and GATX were prior owners of the terminal. We contend that Exxon and GATX are primarily responsible for the majority of the remediation costs. We are in dispute with Kinder Morgan (as successor in interest to GATX) regarding the indemnity by GATX in favor of Pacific in connection with Pacific’s purchase of the facility. In a related matter, the New Jersey Department of Environmental Protection has brought suit against GATX and Exxon to recover natural resources damages. Exxon and GATX have filed third-party demands against PAT, seeking indemnity and contribution. We are vigorously defending against any claim that PAT is directly or indirectly liable for damages or costs associated with the contamination, which occurred prior to PAT’s ownership.

 

Other Pacific-Legacy Matters.  Pacific had completed a number of acquisitions that had not been fully integrated prior to the merger with Plains. Accordingly, we have and may become aware of other matters involving the assets and operations acquired in the Pacific merger as they relate to compliance with environmental and safety regulations, which matters may result in mitigative costs or the imposition of fines and penalties.

 

General.  We, in the ordinary course of business, are a claimant and/or a defendant in various legal proceedings. To the extent we are able to assess the likelihood of a negative outcome for these proceedings, our assessments of such likelihood range from remote to probable. If we determine that a negative outcome is probable and the amount of loss is reasonably estimable, we accrue the estimated amount. We do not believe that the outcome of these legal proceedings, individually or in the aggregate, will have a materially adverse effect on our financial condition, results of operations or cash flows.

 

This excerpt taken from the PAA 10-Q filed Nov 7, 2008.

Litigation

 

Pipeline Releases.   In January 2005 and December 2004, we experienced two unrelated releases of crude oil that reached rivers located near the sites where the releases originated. In early January 2005, an overflow from a temporary storage tank located in East Texas resulted in the release of approximately 1,200 barrels of crude oil, a portion of which reached the Sabine River. In late December 2004, one of our pipelines in West Texas experienced a rupture that resulted in the release of approximately 4,500 barrels of crude oil, a portion of which reached a remote location of the Pecos River. In both cases, emergency response personnel under the supervision of a unified command structure consisting of representatives of Plains, the Environmental Protection Agency (the “EPA”), the Texas Commission on Environmental Quality and the Texas Railroad Commission conducted clean-up operations at each site. Approximately 980 and 4,200 barrels were recovered from the two respective sites. The unrecovered oil was removed or otherwise addressed by us in the course of site remediation. Aggregate costs associated with the releases, including estimated remediation costs, are estimated to be approximately $4 million to $5 million. In cooperation with the appropriate state and federal environmental authorities, we have completed our work with respect to site restoration, subject to some ongoing remediation at the Pecos River site. The EPA has referred these two crude oil releases, as well as several other smaller releases, to the U.S. Department of Justice (the “DOJ”) for further investigation in connection with a civil penalty enforcement action under the Federal Clean Water Act. We have cooperated in the investigation and are currently involved in settlement discussions with the DOJ and the EPA. Our assessment is that it is probable we will pay penalties related to the releases. We may also be subjected to injunctive remedies that would impose additional requirements, costs and constraints on our operations. We have accrued our current estimate of the likely penalties as a loss contingency, which is included in the estimated aggregate costs set forth above. We understand that the maximum permissible penalty, if any, that the EPA could assess with respect to the subject releases under relevant statutes would be approximately $6.8 million. Such statutes contemplate the potential for substantial reduction in penalties based on mitigating circumstances and factors. We believe that several of such circumstances and factors exist, and thus have been a primary focus in our discussions with the DOJ and EPA with respect to these matters.

 

On November 15, 2006, we completed the Pacific merger. The following is a summary of the more significant matters that relate to Pacific, its assets or operations.

 

The People of the State of California v. Pacific Pipeline System, LLC (“PPS”).   In March 2005, a release of approximately 3,400 barrels of crude oil occurred on Line 63, subsequently acquired by us in the Pacific merger. The release occurred when the pipeline was severed as a result of a landslide caused by heavy rainfall in the Pyramid Lake area of Los Angeles County. Total projected

 

18



Table of Contents

 

emergency response, remediation and restoration costs are approximately $26 million, substantially all of which have been incurred and recovered under a pre-existing PPS pollution liability insurance policy.

 

In connection with this release, in March 2006, PPS, a subsidiary acquired in the Pacific merger, was served with a four-count misdemeanor criminal action in the Los Angeles Superior Court Case No. 6NW01020, which alleged the violation by PPS of two strict liability statutes under the California Fish and Game Code for the unlawful deposit of oil or substances harmful to wildlife into the environment, and violations of two sections of the California Water Code for the willful and intentional discharge of pollution into state waters. On October 15, 2008 this criminal action (all four counts) was dismissed with prejudice and PPS was not subjected to any fine or penalty.

 

In September 2008, PPS was served by the State of California with a civil complaint in connection with this release, in the Los Angeles Superior Court Case No. BC398627, alleging violations of the California Fish and Game Code for the unlawful deposit of oil or substances harmful to wildlife into the environment, violations of two sections of the California Water Code for the unlawful discharge of waste into state waters without a permit, and violations of the Public Nuisance Code alleging that discharge of petroleum into waters of the state had created a public nuisance.  This case was settled in October 2008.  Pursuant to the terms of the settlement agreement, PPS paid no fine or penalty, but made civil settlement payments to various agencies of the State of California in the total amount of approximately $1.1 million.   PPS has submitted these payments to its insurance carrier for reimbursement.

 

United States of America v. Pacific Pipeline Systems, LLC.  In September 2008, the EPA filed a civil complaint against PPS in connection with the March 2005 release described above.  The complaint, which was filed in the Federal District Court for the Central District of California, Civil Action No. CV08-5768DSF(SSX), seeks the maximum permissible penalty under the relevant statutes of approximately $3.7 million. The EPA and DOJ have discretion to reduce the fine, if any, after considering other mitigating factors. Because of the uncertainty associated with these factors, the final amount of the fine that will be assessed for the alleged offenses cannot be ascertained. We may also be subjected to injunctive remedies that would impose additional requirements, costs and constraints on our operations. We will defend against these charges. We believe that several defenses and mitigating circumstances and factors exist that could substantially reduce any penalty or fine that might be imposed by the EPA and DOJ, and intend to pursue discussions with the EPA and DOJ regarding such defenses and mitigating circumstances and factors. Although we have established an estimated loss contingency for this matter, we are presently unable to determine whether the March 2005 spill incident may result in a loss in excess of our accrual for this matter. Discussions with the DOJ on behalf of the EPA to resolve this matter have commenced.

 

Exxon v. GATX.   This Pacific legacy matter involves the allocation of responsibility for remediation of MTBE (and other petroleum product) contamination at the Pacific Atlantic Terminals LLC (“PAT”) facility at Paulsboro, New Jersey. The estimated maximum potential remediation cost ranges up to $12 million. Both Exxon and GATX were prior owners of the terminal. We contend that Exxon and GATX are primarily responsible for the majority of the remediation costs. We are in dispute with Kinder Morgan (as successor in interest to GATX) regarding the indemnity by GATX in favor of Pacific in connection with Pacific’s purchase of the facility. In a related matter, the New Jersey Department of Environmental Protection has brought suit against GATX and Exxon to recover natural resources damages. Exxon and GATX have filed third-party demands against PAT, seeking indemnity and contribution. We are vigorously defending against any claim that PAT is directly or indirectly liable for damages or costs associated with the MTBE contamination.

 

Other Pacific-Legacy Matters.   Pacific had completed a number of acquisitions that had not been fully integrated prior to the merger with Plains. Accordingly, we have and may become aware of other matters involving the assets and operations acquired in the Pacific merger as they relate to compliance with environmental and safety regulations, which matters may result in mitigative costs or the imposition of fines and penalties. We are, for instance, in the process of discussing with the Bay Area Air Quality Management District the settlement of certain historical air quality issues at our facilities acquired in the merger.

 

General.   We, in the ordinary course of business, are a claimant and/or a defendant in various legal proceedings. To the extent we are able to assess the likelihood of a negative outcome for these proceedings, our assessments of such likelihood range from remote to probable. If we determine that a negative outcome is probable and the amount of loss is reasonably estimable, we accrue the estimated amount. We do not believe that the outcome of these legal proceedings, individually and in the aggregate, will have a materially adverse effect on our financial condition, results of operations or cash flows.

 

This excerpt taken from the PAA 10-Q filed Aug 8, 2008.

Litigation

 

Pipeline Releases.   In January 2005 and December 2004, we experienced two unrelated releases of crude oil that reached rivers located near the sites where the releases originated. In early January 2005, an overflow from a temporary storage tank located in East Texas resulted in the release of approximately 1,200 barrels of crude oil, a portion of which reached the Sabine River. In late December 2004, one of our pipelines in West Texas experienced a rupture that resulted in the release of approximately 4,500 barrels of crude oil, a portion of which reached a remote location of the Pecos River. In both cases, emergency response personnel under the supervision of a unified command structure consisting of representatives of Plains, the Environmental Protection Agency (the “EPA”), the Texas Commission on Environmental Quality and the Texas Railroad Commission conducted clean-up operations at each site. Approximately 980 and 4,200 barrels were recovered from the two respective sites. The unrecovered oil was removed or otherwise addressed by us in the course of site remediation. Aggregate costs associated with the releases, including estimated remediation costs, are estimated to be approximately $4 million to $5 million. In cooperation with the appropriate state and federal environmental authorities, we have completed our work with respect to site restoration, subject to some ongoing remediation at the Pecos River site. The EPA has referred these two crude oil releases, as well as several other smaller releases, to the U.S. Department of Justice (the “DOJ”) for further investigation in connection with a civil penalty enforcement action under the Federal Clean Water Act. We have cooperated in the investigation and are currently involved in settlement discussions with the DOJ and the EPA. Our assessment is that it is probable we will pay penalties related to the releases. We may also be subjected to injunctive remedies that would impose additional requirements, costs and constraints on our operations. We have accrued our current estimate of the likely penalties as a loss contingency, which is included in the estimated aggregate costs set forth above. We understand that the maximum permissible penalty, if any, that the EPA could assess with respect to the subject releases under relevant statutes would be approximately $6.8 million. We believe that several mitigating circumstances and factors exist that are likely to substantially reduce any penalty that might be imposed by the EPA, and will continue to engage in discussions with the EPA and the DOJ with respect to such mitigating circumstances and factors, as well as the injunctive remedies proposed.

 

On November 15, 2006, we completed the Pacific merger. The following is a summary of the more significant matters that relate to Pacific, its assets or operations.

 

The People of the State of California v. Pacific Pipeline System, LLC (“PPS”).   In March 2005, a release of approximately 3,400 barrels of crude oil occurred on Line 63, subsequently acquired by us in the Pacific merger. The release occurred when Line 63 was severed as a result of a landslide caused by heavy rainfall in the Pyramid Lake area of Los Angeles County. Total projected emergency response, remediation and restoration costs are approximately $26 million, substantially all of which have been incurred and recovered under a pre-existing PPS pollution liability insurance policy.

 

In connection with this release, in March 2006, PPS, a subsidiary acquired in the Pacific merger, was served with a four-count misdemeanor criminal action in the Los Angeles Superior Court Case No. 6NW01020, which alleges the violation by PPS of two strict liability statutes under the California Fish and Game Code for the unlawful deposit of oil or substances harmful to wildlife into the environment, and violations of two sections of the California Water Code for the willful and intentional discharge of pollution into state waters. The fines that can be assessed against PPS for the violations of the strict liability statutes are based, in large measure, on the volume of unrecovered crude oil that was released into the environment, and, therefore, the maximum state fine, if any, that can be assessed is estimated to be approximately $1.4 million, in the aggregate. This amount is subject to a downward adjustment with respect to actual volumes of crude oil recovered and the State of California has the discretion to further reduce the fine, if any, after considering other mitigating factors. Because of the uncertainty associated with these factors, the final amount of the fine that will be assessed for the alleged offenses cannot be ascertained. We will defend against these charges. In addition to these fines, the State of California has indicated that it may seek to recover approximately $150,000 in natural resource damages against PPS in connection with this matter. The mitigating factors may also serve as a basis for a downward adjustment of any natural resource damages amount. We believe that the alleged violations are without merit and intend to defend against them, and that defenses and mitigating factors should apply. We are in settlement discussions with the State of California.

 

The EPA is also pursuing a claim in connection with this release and has referred this matter to the DOJ for the initiation of proceedings to assess civil penalties against PPS. We understand that the maximum permissible penalty, if any, that the EPA could assess under relevant statutes would be approximately $4.2 million. We believe that several defenses and mitigating circumstances and factors exist that could substantially reduce any penalty that might be imposed by the EPA, and

 

18



Table of Contents

 

intend to pursue discussions with the EPA regarding such defenses and mitigating circumstances and factors. Because of the uncertainty associated with these factors, the final amount of the penalty that will be claimed by the EPA cannot be ascertained. While we have established an estimated loss contingency for this matter, we are presently unable to determine whether the March 2005 spill incident may result in a loss in excess of our accrual for this matter. Discussions with the DOJ to resolve this matter have commenced.

 

Exxon v. GATX.   This Pacific legacy matter involves the allocation of responsibility for remediation of MTBE contamination at the Pacific Atlantic Terminals LLC (“PAT”) facility at Paulsboro, New Jersey. The estimated maximum potential remediation cost ranges up to $12 million. Both Exxon and GATX were prior owners of the terminal. We are in dispute with Kinder Morgan (as successor in interest to GATX) regarding the indemnity by GATX in favor of Pacific in connection with Pacific’s purchase of the facility. In a related matter, the New Jersey Department of Environmental Protection has brought suit against GATX and Exxon to recover natural resources damages. Exxon and GATX have filed third-party demands against PAT, seeking indemnity and contribution. We intend to vigorously defend against any claim that PAT is directly or indirectly liable for damages or costs associated with the MTBE contamination.

 

Other Pacific-Legacy Matters.   Pacific had completed a number of acquisitions that had not been fully integrated prior to the merger with Plains. Accordingly, we have and may become aware of other matters involving the assets and operations acquired in the Pacific merger as they relate to compliance with environmental and safety regulations, which matters may result in mitigative costs or the imposition of fines and penalties.

 

General.   We, in the ordinary course of business, are a claimant and/or a defendant in various legal proceedings. To the extent we are able to assess the likelihood of a negative outcome for these proceedings, our assessments of such likelihood range from remote to probable. If we determine that a negative outcome is probable and the amount of loss is reasonably estimable, we accrue the estimated amount. We do not believe that the outcome of these legal proceedings, individually and in the aggregate, will have a materially adverse effect on our financial condition, results of operations or cash flows.

 

This excerpt taken from the PAA 8-K filed Aug 24, 2006.

Litigation

On June 15, 2006, a lawsuit was filed in the Superior court of California, County of Los Angeles, entitled Kosseff v. Pacific Energy, et al, case no. BC 3544016. The plaintiff alleges that he is a unitholder of

13




Partnership and seeks to represent a class comprising all of the Partnership’s unitholders. The complaint names as defendants the Partnership and certain of the officers and directors of Pacific’s general partner, and asserts claims of self-dealing and breach of fiduciary duty in connection with the pending merger with PAA and related transactions. Among other allegations, the plaintiff alleges that (1) the proposed transaction was the product of a flawed process that would result in the sale of the Partnership at an unfairly low price, (2) subsequent quarterly financial results for the Partnership would have had a material positive impact on the Partnership’s common unit price had the proposed transaction not been announced, and thus the premium being offered to the Partnership’s unitholders was manufactured by the defendants based on the timing of the announcement of the proposed transaction, (3) because of various conflicts of interest, the defendants have acted to better their own interests at the expense of the Partnership’s public unitholders, (4) the defendants favored the proposed transaction in order to secure accelerated vesting of equity compensation under change in control provisions in contracts they have with the Partnership, and (5) the defendants were assured that Lehman Brothers Inc. “would rubber-stamp the transaction as fair and, for that reason Lehman [Brothers Inc.] was hand-picked by the defendants to issue the so-called ‘fairness opinion’.” The plaintiff seeks injunctive relief against completing the merger or, if the merger is completed, rescission of the merger, other equitable relief, and recovery of the plaintiff’s costs and attorneys’ fees. The Partnership believes that the lawsuit is without merit and intends to defend against it vigorously. There can be no assurance that additional claims may not be made or filed, the substance of which may be similar to the allegations described above or that otherwise might arise from, or in connection with, the merger agreement and the transaction it contemplates.

In August, 2005, Rangeland Pipeline Company (“RPC”), a wholly-owned subsidiary of the Partnership, learned that a Statement of Claim was filed by Desiree Meier and Robert Meier in the Alberta Court of Queen’s Bench, Judicial District of Red Deer, naming RPC as defendant, and alleging personal injury and property damage caused by an alleged release of petroleum substances onto plaintiff’s land by a prior owner and operator of the pipeline that is currently owned and operated by the Partnership. The claim seeks Cdn$1 million (approximately U.S.$0.9 million at June 30, 2006) in general damages, Cdn$2 million (approximately U.S.$1.8 million at June 30, 2006) in special damages, and, in addition, unspecified amounts for punitive, exemplary and aggravated damages, costs and interest. RPC believes the claim is without merit, and intends to vigorously defend against it. RPC also believes that certain of the claims, if successfully proven by the plaintiffs, would be liabilities retained by the pipeline’s prior owner under the terms of the agreement whereby the Partnership acquired the pipeline in question.

In connection with the acquisition of assets from Valero, L.P. in September 2005, the Partnership assumed responsibility for the defense of a lawsuit filed in 2003 against Support Terminals Services, Inc. (“ST Services”) by ExxonMobil Corporation (“ExxonMobil”) in New Jersey state court. The Partnership has also assumed any liability that might be imposed on ST Services as a result of the suit. In the suit, ExxonMobil seeks reimbursement of approximately $400,000 for remediation costs it has incurred, from GATX Corporation, Kinder Morgan Liquid Terminals, the successor in interest to GATX Terminals Corporation, and ST Services. ExxonMobil also seeks a ruling imposing liability for any future remediation and related liabilities on the same defendants. These costs are associated with the Paulsboro, New Jersey terminal that was acquired by the Partnership on September 30, 2005. ExxonMobil claims that the costs and future remediation requirements are related to releases at the site subsequent to its sale of the terminal to GATX in 1990 and that, therefore, any remaining remediation requirements are the responsibility of GATX Corporation, Kinder Morgan and ST Services. The Partnership believes the claims against ST Services are without merit, and intend to vigorously defend against them.

In 2001, Big West Oil Company and Chevron Products Company (the “Complainants”) filed complaints against Frontier Pipeline Company (“Frontier”) with the Federal Energy Regulatory Commission (“FERC”) challenging rates contained in joint tariffs in which Frontier was a participating carrier and rates contained in local tariffs filed by Frontier. On February 18, 2004, the FERC found against

14




Frontier on certain of the Complainants’ claims and ordered Frontier to pay reparations to Complainants in the aggregate amount of approximately $4.2 million, plus interest, which Frontier paid in August 2004. On October 5, 2004, Frontier filed a petition for review of the FERC’s reparations orders in the U.S. Court of Appeals for the D.C. Circuit, and on May 26, 2006 the Court of Appeals held that the FERC’s reparation ruling was inconsistent with applicable law, and thus vacated the FERC’s order and remanded the matter back to the FERC for further consideration consistent with the Court of Appeals’ decision. On July 25, 2006, Frontier filed a motion asking the FERC to dismiss the reparations complaints of the Complainants on the grounds that their complaints fail to state claims that can be sustained consistent with the ruling of the Court of Appeals. Frontier’s motion also asked the FERC to order the refund by the Complainants of the reparations previously paid by Frontier, plus interest. The Complainants have not yet responded to Frontier’s motion and no action on the motion has been taken by the FERC. If Frontier prevails on its motion or in any remand proceeding conducted by the FERC, it would be entitled to repayment in the amount of $5.4 million, plus interest thereon from August 23, 2004. The Partnership owns 22.22% of Frontier. Although the Partnership believes Frontier’s motion to dismiss the complaints, as well as the defenses it would assert in a remand proceeding before the FERC, are meritorious, the Partnership cannot predict the outcome of any such actions, and has not recorded any amount for this contingency.

The Partnership is involved in various other regulatory disputes, litigation and claims arising out of its operations in the normal course of business. The Partnership is not currently a party to any legal or regulatory proceedings the resolution of which could be expected to have a material adverse effect on its business, financial condition, liquidity or results of operations.

This excerpt taken from the PAA 8-K filed Jul 14, 2006.

Litigation

        In August, 2005, Rangeland Pipeline Company ("RPC"), a wholly-owned subsidiary of the Partnership, learned that a Statement of Claim was filed by Desiree Meier and Robert Meier in the Alberta Court of Queen's Bench, Judicial District of Red Deer, naming RPC as defendant, and alleging personal injury and property damage caused by an alleged release of petroleum substances onto plaintiff's land by a prior owner and operator of the pipeline that is currently owned and operated by the Partnership. The claim seeks Cdn$1 million (approximately U.S.$0.9 million at March 31, 2006) in general damages, Cdn$2 million (approximately U.S.$1.7 million at March 31, 2006) in special damages, and, in addition, unspecified amounts for punitive, exemplary and aggravated damages, costs and interest. The Statement of Claim has not been served on RPC, so RPC has not been required to file an answer. RPC believes the claim is without merit, and intends to vigorously defend against it. RPC also believes that certain of the claims, if successfully proven by the plaintiffs, would be liabilities retained by the pipeline's prior owner under the terms of the agreement whereby the Partnership acquired the pipeline in question.

        In connection with the acquisition of assets from Valero, L.P. in September 2005, the Partnership assumed responsibility for the defense of a lawsuit filed in 2003 against Support Terminals Services, Inc., ("ST Services") by ExxonMobil Corporation ("ExxonMobil") in New Jersey state court. The Partnership has also assumed any liability that might be imposed on ST Services as a result of the suit. In the suit, ExxonMobil seeks reimbursement of approximately $400,000 for remediation costs it has incurred, from GATX Corporation, Kinder Morgan Liquid Terminals, the successor in interest to GATX Terminals Corporation, and ST Services. ExxonMobil also seeks a ruling imposing liability for any future remediation and related liabilities on the same defendants. These costs are associated with the Paulsboro, New Jersey terminal that was acquired by the Partnership on September 30, 2005. ExxonMobil claims that the costs and future remediation requirements are related to releases at the site subsequent to its sale of the terminal to GATX in 1990 and that, therefore, any remaining remediation requirements are the responsibility of GATX Corporation, Kinder Morgan and ST Services. The Partnership believes the claims against ST Services are without merit, and intend to vigorously defend against them.

        The Partnership is involved in various other regulatory disputes, litigation and claims arising out of its operations in the normal course of business. The Partnership is not currently a party to any legal or regulatory proceedings the resolution of which could be expected to have a material adverse effect on its business, financial condition, liquidity or results of operations.

11



This excerpt taken from the PAA 10-Q filed May 9, 2005.

Litigation

        Export License Matter.    In our gathering and marketing activities, we import and export crude oil from and to Canada. Exports of crude oil are subject to the "short supply" controls of the Export Administration Regulations ("EAR") and must be licensed by the Bureau of Industry and Security (the

14


"BIS") of the U.S. Commerce Department. In 2002, we determined that we may have violated the terms of our licenses with respect to the quantity of crude oil exported and the end-users in Canada. Export of crude oil except as authorized by license is a violation of the EAR. In October 2002, we submitted to the BIS an initial notification of voluntary disclosure. The BIS subsequently informed us that we could continue to export while previous exports were under review. We applied for and received several new licenses allowing for export volumes and end users that more accurately reflect our anticipated business and customer needs. We also conducted reviews of new and existing contracts and implemented new procedures and practices in order to monitor compliance with applicable laws regarding the export of crude oil to Canada. As a result, we subsequently submitted additional information to the BIS in October 2003 and May 2004. In August 2004, we received a request from the BIS for additional information. We have responded to this and subsequent requests, and continue to cooperate fully with BIS officials. At this time, we have received neither a warning letter nor a charging letter, which could involve the imposition of penalties, and no indication of what penalties the BIS might assess. As a result, we cannot reasonably estimate the ultimate impact of this matter.

        Alfons Sperber v. Plains Resources Inc., et al.    On December 18, 2003, a putative class action lawsuit was filed in the Delaware Chancery Court, New Castle County, entitled Alfons Sperber v. Plains Resources Inc., et al. This suit, brought on behalf of a putative class of Plains All American Pipeline, L.P. common unitholders, asserted breach of fiduciary duty and breach of contract claims against us, Plains AAP, L.P., and Plains All American GP LLC and its directors, as well as breach of fiduciary duty claims against Plains Resources Inc. and its directors (Plains Resources, Inc. is a unitholder and an interest owner in our general partner). The complaint sought to enjoin or rescind a proposed acquisition of all of the outstanding stock of Plains Resources Inc., as well as declaratory relief, an accounting, disgorgement and the imposition of a constructive trust, and an award of damages, fees, expenses and costs, among other things. This lawsuit has been settled in principle. The court has approved the settlement and the settlement became final in March 2005.

        Pipeline Releases.    In December 2004 and January 2005, we experienced two unrelated releases of crude oil that reached rivers located near the sites where the releases originated. In late December 2004, one of our pipelines in West Texas experienced a rupture that resulted in the release of approximately 4,500 barrels of crude oil, a portion of which reached a remote location of the Pecos River. In early January 2005, an overflow from a temporary storage tank located in East Texas resulted in the release of approximately 1,200 barrels of crude oil, a portion of which reached the Sabine River. In both cases, emergency response personnel under the supervision of a unified command structure consisting of representatives of Plains Pipeline, the U.S. Environmental Protection Agency, the Texas Commission on Environmental Quality and the Texas Railroad Commission conducted clean-up operations at each site. Approximately 4,200 barrels and 980 barrels were recovered from the two respective sites. The unrecovered oil has been or will be removed or otherwise addressed by PAA in the course of site remediation. Aggregate costs associated with the releases, including estimated remediation costs, are estimated to be approximately $3.0 million to $3.5 million. We continue to work with the appropriate state and federal environmental authorities in responding to the releases and no enforcement proceedings have been instituted by any governmental authority at this time.

        General.    We, in the ordinary course of business, are a claimant and/or a defendant in various legal proceedings. We do not believe that the outcome of these legal proceedings, individually or in the aggregate, will have a materially adverse effect on our financial condition, results of operations or cash flows.

This excerpt taken from the PAA 10-K filed Mar 3, 2005.

Litigation

        Export License Matter.    In our gathering and marketing activities, we import and export crude oil from and to Canada. Exports of crude oil are subject to the "short supply" controls of the Export Administration Regulations ("EAR") and must be licensed by the Bureau of Industry and Security (the "BIS") of the U.S. Commerce Department. In 2002, we determined that we may have violated the terms of our licenses with respect to the quantity of crude oil exported and the end-users in Canada. Export of crude oil except as authorized by license is a violation of the EAR. In October 2002, we submitted to the BIS an initial notification of voluntary disclosure. The BIS subsequently informed us that we could continue to export while previous exports were under review. We applied for and received several new licenses allowing for export volumes and end users that more accurately reflect our anticipated business and customer needs. We also conducted reviews of new and existing contracts and implemented new procedures and practices in order to monitor compliance with applicable laws regarding the export of crude oil to Canada. As a result, we subsequently submitted additional information to the BIS in October 2003 and May 2004. In August 2004, we received a request from the BIS for additional information. We have responded to this and subsequent requests, and continue to cooperate fully with BIS officials. At this time, we have received neither a warning letter nor a charging letter, which could involve the imposition of penalties, and no indication of what penalties the BIS might assess. As a result, we cannot reasonably estimate the ultimate impact of this matter.

        Alfons Sperber v. Plains Resources Inc., et al.    On December 18, 2003, a putative class action lawsuit was filed in the Delaware Chancery Court, New Castle County, entitled Alfons Sperber v. Plains Resources Inc., et al. This suit, brought on behalf of a putative class of Plains All American Pipeline, L.P. common unitholders, asserted breach of fiduciary duty and breach of contract claims against us, Plains AAP, L.P., and Plains All American GP LLC and its directors, as well as breach of fiduciary duty claims against Plains Resources Inc. and its directors. The complaint sought to enjoin or rescind a proposed acquisition of all of the outstanding stock of Plains Resources Inc., as well as declaratory relief, an accounting, disgorgement and the imposition of a constructive trust, and an award of damages, fees, expenses and costs, among other things. This lawsuit has been settled in principle. The court has approved the settlement and, assuming no appeals are filed, the settlement will become final in March 2005.

F-38



        Other.    We, in the ordinary course of business, are a claimant and/or a defendant in various other legal proceedings. We do not believe that the outcome of these other legal proceedings, individually and in the aggregate, will have a materially adverse effect on our financial condition, results of operations or cash flows.

Wikinvest © 2006, 2007, 2008, 2009, 2010, 2011, 2012. Use of this site is subject to express Terms of Service, Privacy Policy, and Disclaimer. By continuing past this page, you agree to abide by these terms. Any information provided by Wikinvest, including but not limited to company data, competitors, business analysis, market share, sales revenues and other operating metrics, earnings call analysis, conference call transcripts, industry information, or price targets should not be construed as research, trading tips or recommendations, or investment advice and is provided with no warrants as to its accuracy. Stock market data, including US and International equity symbols, stock quotes, share prices, earnings ratios, and other fundamental data is provided by data partners. Stock market quotes delayed at least 15 minutes for NASDAQ, 20 mins for NYSE and AMEX. Market data by Xignite. See data providers for more details. Company names, products, services and branding cited herein may be trademarks or registered trademarks of their respective owners. The use of trademarks or service marks of another is not a representation that the other is affiliated with, sponsors, is sponsored by, endorses, or is endorsed by Wikinvest.