Back to PSD
PSE Joins The Electric Vehicle Project

Puget Sound Energy announced today that it will be working closely with Nissan and ECOtality (ETLY.OB) as a member of The Electric Vehicle (EV) Project to bring new environmentally friendly transportation options to widespread use by consumers and businesses in Western Washington by late 2010.

PSE’s effort will support a $100 million Department of Energy grant awarded to ECOtality’s Electric Transportation Engineering Corporation (eTec) subsidiary to deploy up to 2,240 charging stations and approximately 1,000 Nissan LEAF EVs (electric vehicles) in cities throughout the Puget Sound area, including Bellevue, the utility’s headquarters, and other suburban locations in King County. PSE will assist with the roll-out of charging stations for the Nissan LEAF and other EVs, and is studying how the increased use of EVs may impact the demand for energy and the energy infrastructure.

“PSE is committed to working with EV leaders such as Nissan and eTec and sees our support for transportation options as a logical extension of our work in renewable energy and energy efficiency,” said Steve Reynolds, PSE president and CEO. “We congratulate eTec on its grant award, and look forward to serving our residential and business customers with the energy infrastructure required for the electric cars we will soon see on the road.”

As part of The EV Project, PSE will be collaborating with Nissan, eTec and municipalities and customers in the region in providing the energy infrastructure needed for the development of vehicle charging stations in King County and other portions of Western Washington served by the utility. The nation’s second-largest utility owner and operator of wind power, PSE will be exploring how EV charging stations and renewable energy generating facilities, such as wind and solar power, work together to reduce the carbon emissions from the transportation system.

“We are fortunate in the Northwest to have abundant hydropower, wind power and other clean energy resources,” said Reynolds. “Using these resources to power new transportation alternatives makes sense for both our environment and our economy.”

In addition to Nissan and eTec, PSE is working with other automakers, utilities, and government agencies and is also testing two plug-in hybrid electric vehicles (PHEVs) to help the utility better understand the energy demands and infrastructure challenges presented by greater use of electricity in transportation. Plug-in hybrids use electric power from batteries that are recharged through the electrical grid to provide the primary power source for short- and medium-range trips, using their gasoline engine only when necessary. The PHEV automobiles join 48 conventional hybrid vehicles in PSE’s fleet, and PSE’s first hybrid service line truck, which entered service in April 2009. The vehicle, which is a heavy duty diesel-electric hybrid, is being used by the utility to restore power in routine and storm situations.

For more information about The EV Project, please visit www.theEVproject.com.

About

Washington state’s oldest and largest energy utility, with a 6,000-square-mile service area stretching across 11 counties, Puget Sound Energy serves more than 1 million electric customers and nearly 750,000 natural gas customers. PSE, a subsidiary of Puget Energy, meets the energy needs of its growing customer base primarily in Western Washington through incremental, cost-effective energy conservation, procurement of sustainable energy resources, and far-sighted investment in the energy-delivery infrastructure. PSE employees are dedicated to providing great customer service to deliver energy that is safe, reliable, reasonably priced, and environmentally responsible. For more information, visit www.PSE.com.

(c) 2009 Business Wire, Inc., All rights reserved. All of the news releases and other content contained herein are protected by copyright and other applicable laws, treaties and conventions. Information contained in the releases is furnished by Business Wire's members, who warrant that they are solely responsible for the content, accuracy and originality of the information contained therein. Any copying or reproduction (other than for an individual user's personal reference), redistribution, reposting or other transmission or communication is expressly prohibited without prior written permission of Business Wire, Inc
Back to PSD
Wikinvest © 2006, 2007, 2008, 2009. Use of this site is subject to express Terms of Service, Privacy Policy, and Disclaimer. By continuing past this page, you agree to abide by these terms. Any information provided by Wikinvest, including but not limited to company data, competitors, business analysis, market share, sales revenues and other operating metrics, earnings call analysis, conference call transcripts, industry information, or price targets should not be construed as research, trading tips or recommendations, or investment advice and is provided with no warrants as to its accuracy. Stock market data, including US and International equity symbols, stock quotes, share prices, earnings ratios, and other fundamental data is provided by data partners. Stock market quotes delayed at least 15 minutes for NASDAQ, 20 mins for NYSE and AMEX. Market data by Xignite. See data providers for more details. Company names, products, services and branding cited herein may be trademarks or registered trademarks of their respective owners. The use of trademarks or service marks of another is not a representation that the other is affiliated with, sponsors, is sponsored by, endorses, or is endorsed by Wikinvest.
Powered by MediaWiki