This excerpt taken from the SOHU 10-Q filed May 8, 2007.
Article 9 Delivery Terms
1.
The Seller shall hand over the house to the Buyer before the th day of
. (as provided in Exhibit 8)
2.
The house shall meet the following 1, 3, 5 and × requirements when it is handed over. (as provided in Exhibit 8)
i.
A technical report of area measurement of the house furnished by a qualified house measuring agency shall be produced.
ii.
If the house is residential, the Seller shall produce the Guarantee of Residential Quality and the Specifications of the Use of Residential House.
iii.
The house shall also be qualified with respect to the standards of the municipal utilities promised by the Seller in Article 12 and other equipment standards.
iv.
If the house is residential, the Seller shall produce the Inspection List of Unit Quality (apply to the residential houses that are inspected after January 1, 2006).
v.
Other terms as provided in Exhibit 6.
Bet you've never seen portfolio analytics like these.