S » Topics » Spectrum Reconfiguration Obligations

These excerpts taken from the S 10-K filed Feb 26, 2010.

Spectrum Reconfiguration Obligations

In 2004, the FCC adopted a Report and Order that included new rules regarding interference in the 800 MHz band and a comprehensive plan to reconfigure the 800 MHz band. The Report and Order provides for the exchange of a portion of our 800 MHz FCC spectrum licenses, and requires us to fund the cost incurred by public safety systems and other incumbent licensees to reconfigure the 800 MHz spectrum band. In addition, we received licenses for 10 MHz of nationwide spectrum in the 1.9 GHz band; however, we are required to relocate and reimburse the incumbent licensees in this band for their costs of relocation to another band designated by the FCC.

The minimum cash obligation is approximately $2.8 billion under the Report and Order. We are, however, obligated to pay the full amount of the costs relating to the reconfiguration plan, even if those costs exceed $2.8 billion. As required under the terms of the Report and Order, a letter of credit has been secured to provide assurance that funds will be available to pay the relocation costs of the incumbent users of the 800 MHz spectrum. These relocation costs are reviewed periodically based on actual costs incurred. As a result of these reviews, our letter of credit was reduced from $2.0 billion to $1.7 billion in 2009 as approved by the FCC.

Completion of the 800 MHz band reconfiguration was initially required by June 26, 2008; however, the FCC has issued a significant number of waivers to 800 MHz licensees giving them additional time to complete their band reconfigurations, which may delay access to some of our 800 MHz replacement spectrum. Based on progress to date, a significant number of additional extension requests have been filed and more are expected. Under an October 2008 FCC Order, we may be required, on March 31, 2010, to relinquish some of our 800 MHz spectrum on a region-by-region basis prior to receiving 800 MHz replacement spectrum. On January 27, 2010, we asked the FCC to waive the requirement in certain regions where most public safety agencies have not yet vacated our replacement channels. This request is pending before the FCC. The Report and Order also contained an exception with respect to markets that border Mexico and Canada. The exception with respect to markets that border Canada was clarified on May 9, 2008 when the FCC issued the Canadian border plans to include a 30-month deadline for completion.

Spectrum Reconfiguration Obligations

In 2004, the FCC adopted a Report and Order that included new rules regarding interference in the 800 MHz band and a comprehensive plan to reconfigure the 800 MHz band. The Report and Order provides for the exchange of a portion of our 800 MHz FCC spectrum licenses, and requires us to fund the cost incurred by public safety systems and other incumbent licensees to reconfigure the 800 MHz spectrum band. In addition, we received licenses for 10 MHz of nationwide spectrum in the 1.9 GHz band; however, we are required to relocate and reimburse the incumbent licensees in this band for their costs of relocation to another band designated by the FCC.

The minimum cash obligation is approximately $2.8 billion under the Report and Order. We are, however, obligated to pay the full amount of the costs relating to the reconfiguration plan, even if those costs exceed $2.8 billion. As required under the terms of the Report and Order, a letter of credit has been secured to provide assurance that funds will be available to pay the relocation costs of the incumbent users of the 800 MHz spectrum. These relocation costs are reviewed periodically based on actual costs incurred. As a result of this review, our letter of credit was reduced from $2.0 billion to $1.9 billion in June 2009, reduced to $1.8 billion in September 2009, and further reduced to $1.7 billion in November 2009 as approved by the FCC.

 

F-31


Table of Contents

SPRINT NEXTEL CORPORATION

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

 

The following table represents payments directly attributable to our performance under the Report and Order from the inception of the program:

 

     Through
December 31, 2008
   Net Additions    Through
December 31, 2009
     (in millions)

FCC licenses

   $ 1,377    $ 579    $ 1,956

Property, plant and equipment(1)

     150      7      157

Costs not benefiting our infrastructure or spectrum positions

     238      37      275
                    
   $ 1,765    $ 623    $ 2,388
                    

 

(1) Excluded from the table above are reconfiguration costs incurred to date which are based on allocations between reconfiguration activities and our normal network improvements. The methodology with which we have calculated these costs has not been approved by the independent Transition Administrator designated by the FCC to review our expenditures. As a result, the amount allocated to reconfiguration activity is subject to change based on additional assessments made over the course of the reconfiguration program.

When expended, these costs are generally accounted for either as property, plant and equipment or as additions to the FCC licenses intangible asset. Total direct costs attributable to the spectrum reconfigurations are estimated to exceed the minimum cash obligation of $2.8 billion. This estimate is dependent on significant assumptions including the final licensee costs and costs associated with relocating licensees in the Canadian border region under the border plan that was adopted by the FCC and the Mexican border region for which there is currently no approved border plan. In addition, we are entitled to receive reimbursement from the mobile satellite service licensees for their pro rata portion of our costs of clearing a portion of the 1.9 GHz spectrum. Those licensees may be unable or unwilling to reimburse us for their share of the costs, which are estimated to be approximately $200 million.

Completion of the 800 MHz band reconfiguration was initially required by June 26, 2008; however, the FCC has issued a significant number of waivers to 800 MHz licensees giving them additional time to complete their band reconfigurations, which may delay access to some of our 800 MHz replacement spectrum. Based on progress to date, a significant number of additional extension requests have been filed and more are expected. Under an October 2008 FCC Order, we may be required, on March 31, 2010, to relinquish some of our 800 MHz spectrum on a region-by-region basis prior to receiving 800 MHz replacement spectrum. On January 27, 2010, we asked the FCC to waive the requirement in certain regions where most public safety agencies have not yet vacated our replacement channels. This request is pending before the FCC. The Report and Order also contained an exception with respect to markets that border Mexico and Canada. The exception with respect to markets that border Canada was clarified on May 9, 2008 when the FCC issued the Canadian border plans to include a 30-month deadline for completion.

This excerpt taken from the S 10-Q filed May 8, 2009.

Spectrum Reconfiguration Obligations

In 2004, the FCC adopted a Report and Order that included new rules regarding interference in the 800 MHz band and a comprehensive plan to reconfigure the 800 MHz band. The Report and Order provides for the exchange of a portion of our 800 MHz FCC spectrum licenses, and requires us to fund the cost incurred by public safety systems and other incumbent licensees to reconfigure the 800 MHz spectrum band. In addition, we received licenses for 10 MHz of nationwide spectrum in the 1.9 GHz band; however, we are required to relocate and reimburse the incumbent licensees in this band for their costs of relocation to another band designated by the FCC.

The minimum cash obligation is approximately $2.8 billion under the Report and Order. We are, however, obligated to pay the full amount of the costs relating to the reconfiguration plan, even if those costs exceed $2.8 billion. As required under the terms of the Report and Order, a $2.0 billion letter of credit has been secured to provide assurance that funds will be available to pay the relocation costs of the incumbent users of the 800 MHz spectrum.

The following table represents payments directly attributable to our performance under the Report and Order from the inception of the program:

 

    Through
December 31, 2008
       2009 Net Additions
and Adjustments
       Through
March 31, 2009
    (in millions)

FCC licenses

  $             1,377      $             204      $             1,581

Property, plant and equipment(1)

    150        1        151

Costs not benefiting our infrastructure or spectrum positions

    238        7        245
                       
  $ 1,765      $ 212      $ 1,977
                       

 

(1) Excluded from the table above are reconfiguration costs incurred to date which are based on allocations between reconfiguration activities and our normal network improvements. The methodology with which we have calculated these costs has not been approved by the independent Transition Administrator designated by the FCC to review our expenditures. As a result, the amount allocated to reconfiguration activity is subject to change based on additional assessments made over the course of the reconfiguration program.

When expended, these costs are generally accounted for either as property, plant and equipment or as additions to the FCC licenses intangible asset. Total direct costs attributable to the spectrum reconfigurations are expected to range between $3.2 and $3.6 billion based on the experience to date. This estimate is dependent on significant assumptions including the final licensee costs and costs associated with relocating licensees in the Canadian border region under the border plan that was adopted by the FCC and the Mexican border region for which there is currently no approved border plan. In addition, we are entitled to receive reimbursement from the mobile-satellite service licensees for their pro rata portion of our costs of clearing a portion of the 1.9 GHz spectrum. Those licensees may be unable or unwilling to reimburse us for their share of the costs, which are estimated to be approximately $200 million.

Completion of the 800 MHz band reconfiguration was initially required by June 26, 2008; however, the FCC has issued a significant number of waivers to 800 MHz licensees giving them additional time to complete their band reconfigurations, which has delayed access to all of our 800 MHz replacement spectrum. Based on progress to date, a significant number of additional extension requests are expected by July 2009. Under an October 2008 FCC Order, we may be required to relinquish some of our 800 MHz spectrum on a region-by-region basis prior to receiving 800 MHz replacement spectrum in March 2010. The Report and Order also contained an exception with respect to markets that border Mexico and Canada. The exception with respect to markets that border Canada was clarified on May 9, 2008 when the FCC issued the Canadian border plans to include a 30-month deadline for completion.

This excerpt taken from the S 10-K filed Feb 27, 2009.

Spectrum Reconfiguration Obligations

In 2004, the FCC adopted a Report and Order that included new rules regarding interference in the 800 MHz band and a comprehensive plan to reconfigure the 800 MHz band. The interference is believed to have been caused as a result of the operations of commercial mobile radio service providers operating on frequencies adjacent to a number of public safety communication systems in the same geographic area. We assumed the obligations inherent in the Report and Order in August 2005 when we merged with Nextel Communications, Inc.

The Report and Order provides for the exchange of a portion of our 800 MHz FCC spectrum licenses, and requires us to fund the cost incurred by public safety systems and other incumbent licensees to reconfigure the 800 MHz spectrum band. In addition, we received licenses for 10 MHz of nationwide spectrum in the 1.9 GHz band; however, we are required to relocate and reimburse the incumbent licensees in this band for their costs of relocation to another band designated by the FCC.

The Report and Order requires us to make a payment to the U.S. Treasury at the conclusion of the band reconfiguration process to the extent that the value of the 1.9 GHz spectrum we received exceeds the total of the value of licenses for spectrum in the 700 MHz and 800 MHz bands that we surrendered under the decision plus the actual costs, or qualifying costs, that we incur to retune incumbents and our own facilities under the Report and Order. The FCC determined under the Report and Order that, for purposes of calculating that payment amount, the value of the 1.9 GHz spectrum is about $4.9 billion and the aggregate value of the 700 MHz spectrum and the 800 MHz spectrum surrendered, net of 800 MHz spectrum received as part of the exchange, is about $2.1 billion, which, because of the potential payment to the U.S. Treasury, results in minimum cash obligation of about $2.8 billion by us under the Report and Order. We are, however, obligated to pay the full amount of the costs relating to the reconfiguration plan, even if those costs exceed $2.8 billion.

The following table represents payments directly attributable to our performance under the Report and Order from the inception of the program:

 

     Through
December 31, 2007
   2008 Additions
and Adjustments
   Through
December 31, 2008(1)
     (in millions)

FCC licenses

   $ 732    $ 645    $ 1,377

Property, plant and equipment

     148      2      150

Costs not benefiting our infrastructure or spectrum positions

     234      4      238
                    
   $ 1,114    $ 651    $ 1,765
                    

 

(1) Excluded from the table above are estimated reconfiguration costs incurred to date that are included in property, plant and equipment on our consolidated balance sheet, which are based on allocations between reconfiguration activities and our normal network improvements. The methodology with which we have calculated these costs has not been approved by the Transition Administrator, or TA. As a result, the amount allocated to reconfiguration activity is subject to change based on additional assessments made over the course of the reconfiguration program.

 

F-49


Table of Contents

SPRINT NEXTEL CORPORATION

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

From the inception of the program through December 31, 2008, we have incurred approximately $1.8 billion of costs directly attributable to the spectrum reconfiguration program. When expended, these costs are generally accounted for either as property, plant and equipment or as additions to the FCC licenses intangible asset. We estimate, based on our experience to date with the reconfiguration program and on information currently available, that our total direct costs attributable to complete the spectrum reconfigurations will range between $3.2 and $3.6 billion. Neither the actual amounts incurred through December 31, 2008, nor the range of total direct costs estimated to complete spectrum reconfigurations, includes any of our internal network costs that we have preliminarily allocated to the reconfiguration program for capacity sites and modifications for which we may request credit under the reconfiguration program. This estimate is dependent on significant assumptions including the final licensee costs and costs associated with relocating licensees in the Canadian border region under the border plan that was adopted by the FCC and the Mexican border region for which there is currently no approved border plan. In addition, we are entitled to receive reimbursement from the mobile-satellite service licensees for their pro rata portion of our costs of clearing a portion of the 1.9 GHz spectrum. Those licensees may be unable or unwilling to reimburse us for their share of the costs, which we estimate to be approximately $200 million. Accordingly, we believe that it is unlikely that we will be required to make a payment to the U.S. Treasury. The FCC has designated the independent TA to monitor, facilitate and review our expenditures for the 800 MHz band reconfiguration.

As required under the terms of the Report and Order, we delivered a $2.5 billion letter of credit to provide assurance that funds will be available to pay the relocation costs of the incumbent users of the 800 MHz spectrum. The Report and Order provides for the possibility of periodic reductions in the amount of the letter of credit. During 2008, we determined based on the information available to us, that the total cost of reconfiguring the incumbent users of the 800 MHz are likely to be less than $2.5 billion. The TA reviewed our forecasts and recommended to the FCC $529 million in reductions in the letter of credit based on costs incurred through June 30, 2008. The FCC concurred with the TA’s requests and the letter of credit has been reduced to $2.0 billion.

With respect to timing, the Report and Order required the completion of the 800 MHz band reconfiguration within a 36-month period ending June 26, 2008, with an exception made with respect to markets that border Mexico and Canada. On October 30, 2008, the FCC released an Order granting us relief we had previously requested with respect to the June 26, 2008 completion date whereby a staged, milestone-based reduction will be used for the interleaved spectrum that we would otherwise have been required to surrender by June 26, 2008. In addition to defining progress benchmarks, which will determine the amount of spectrum we relinquish on a region-by-region basis, the FCC adopted a deadline of March 31, 2010, at which time we may be required to relinquish portions of our 800 MHz interleaved spectrum in advance of completion of rebanding and receipt of remaining replacement spectrum. This Order alleviates the spectrum constraints we may have faced as a result of the original June 26, 2008 completion date. The exception with respect to markets that border Canada was clarified on May 9, 2008, when the FCC issued the Canadian border plans which included a 30-month deadline for completion.

This excerpt taken from the S 10-Q filed Nov 7, 2008.

Spectrum Reconfiguration Obligations

In recent years, the operations of a number of public safety communications systems in the 800 MHz block of spectrum have experienced interference that is believed to be a result of the operations of commercial mobile radio service providers operating on adjacent frequencies in the same geographic area. In 2004, the FCC adopted a Report and Order that included new rules regarding interference in the 800 MHz band and a comprehensive plan to reconfigure the 800 MHz band. In February 2005, Nextel Communications, Inc. accepted the Report and Order, which was necessary before the order became effective, because the Report and Order required Nextel to undertake a number of obligations and accept modifications to its FCC licenses. We assumed these obligations when we merged with Nextel in August 2005.

The Report and Order provides for the exchange of a portion of our 800 MHz FCC spectrum licenses, which the FCC is implementing through modifications to these licenses, and requires us to fund the cost incurred by public safety systems and other incumbent licensees to reconfigure the 800 MHz spectrum band. Under the Report and Order, we received licenses for 10 MHz of nationwide spectrum in the 1.9 GHz band, but we are required to relocate and reimburse the incumbent licensees in this band for their costs of relocation to another band designated by the FCC. The Report and Order required the completion of the 800 MHz band reconfiguration within a 36-month period, ending June 26, 2008, with exceptions made with respect to markets that border Mexico and Canada. On May 9, 2008, the FCC issued the Canadian border plan which included a 30-month deadline for completion. As more fully described below, the 800 MHz reconfiguration was not completed within the applicable FCC designated time period due primarily to circumstances outside of our control.

As part of the reconfiguration process in most regions, we must surrender portions of our 800 MHz spectrum before we are able to commence use of replacement 800 MHz spectrum. On September 11, 2007, the FCC issued a Third Memorandum Opinion and Order, or Third MO&O, in which the FCC ordered, among other things, that by June 26, 2008 we vacate many 800 MHz channels that we currently use, even if the applicable public safety licensee was not ready to relocate to the vacated spectrum. In addition, the Third MO&O also required public safety licensees to submit waiver requests if they did not believe they would be able to complete their reconfiguration by June 26, 2008. On June 17, 2008, the FCC granted approximately 250 waivers to public safety licensees that had indicated that they would not be able to complete their reconfigurations by June 26, 2008. The FCC also granted interim waivers for an additional 225 licensees and requested further information from an additional 25 licensees before they made a determination as to any extension for those licensees. Based on these circumstances, on June 19, 2008, the FCC granted us a blanket waiver to allow us to stay on those specific channels not yet needed by licensees until such time as the licensee provides us with 60-days notice of the need for their channels. To address our overall need for sufficient spectrum capacity, while licensees reconfigure their systems and return their prior spectrum to us for use, on June 17, 2008, we filed a Petition for Relief and presented a proposal to the FCC regarding a staged, milestone-based reduction in other spectrum that we would otherwise have been required to surrender by June 26, 2008. After a series of thirty-day extensions of the June 26, 2008 deadline to consider our proposal, on October 30, 2008, the FCC released an Order granting us the relief we requested and adopted the staged, milestone-based spectrum reductions we proposed. In addition to defining progress benchmarks, which will determine the amount of spectrum we relinquish on a region-by-region basis, the FCC adopted a deadline of March 31, 2010, at which time we may be required to relinquish portions of our 800 MHz spectrum in advance of completion of rebanding and receipt of remaining replacement spectrum. This Order, including certain exceptions to the March 31, 2010 deadline, in combination with the waiver the FCC granted us on June 19, 2008, essentially returns us to the 800 MHz reconfiguration transition process in effect prior to the Third MO&O and alleviates the spectrum constraints we may have faced as a result of the Third MO&O.

 

22


Table of Contents

SPRINT NEXTEL CORPORATION

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS – (Continued)

 

The Report and Order requires us to make a payment to the U.S. Treasury at the conclusion of the band reconfiguration process to the extent that the value of the 1.9 GHz spectrum we received exceeds the total of the value of licenses for spectrum in the 700 MHz and 800 MHz bands that we surrendered under the decision, plus the actual costs that we incur to retune incumbents and our own facilities under the Report and Order. The FCC determined under the Report and Order that, for purposes of calculating that payment amount, the value of the 1.9 GHz spectrum is about $4.9 billion and the aggregate value of the 700 MHz spectrum and the 800 MHz spectrum surrendered, net of 800 MHz spectrum received as part of the exchange, is about $2.1 billion, which, because of the potential payment to the U.S. Treasury, results in minimum cash expenditures of about $2.8 billion by us under the Report and Order. The FCC has designated the independent Transition Administrator, or TA, to monitor, facilitate and review our expenditures for 800 MHz band reconfiguration.

In addition, a financial reconciliation is required to be completed at the end of the reconfiguration implementation to determine whether the value of the spectrum rights received exceeds the total of (i) the value of spectrum rights that are surrendered and (ii) the qualifying costs referred to above. If so, we will be required to pay the difference to the U.S. Treasury, as described above. Based on the FCC’s determination of the values of the spectrum rights received and surrendered by Nextel, the minimum obligation to be incurred under the Report and Order is $2.8 billion. The Report and Order also provides that qualifying costs we incur as part of the reconfiguration plan, including costs to reconfigure our own infrastructure and spectrum positions, can be used to offset the minimum obligation of $2.8 billion; however, we are obligated to pay the full amount of the costs relating to the reconfiguration plan, even if those costs exceed that amount. From the inception of the program through September 30, 2008, we have incurred approximately $1.6 billion of costs directly attributable to the spectrum reconfiguration program. When expended, these costs are accounted for either as property, plant and equipment or as additions to the FCC licenses intangible asset, consistent with our accounting policies. The following table represents payments directly attributable to our performance under the Report and Order from the inception of the program:

 

     Through
December 31, 2007
   2008 Additions
and Adjustments
    Through
September 30, 2008
     (in millions)

FCC licenses

   $ 732    $ 516     $ 1,248

Property, plant and equipment

     148      2       150

Costs not benefiting our infrastructure or spectrum positions

     234      (12 )     222
                     
   $ 1,114    $ 506     $ 1,620
                     

Excluded from the table above are estimated reconfiguration costs incurred to date that are included in property, plant and equipment on our consolidated balance sheet, which are based on allocations between reconfiguration activities and our normal network improvements. These estimated allocations may vary depending on key assumptions, including subscribers, call volumes and other factors over the life of the reconfiguration program. As a result, the amount allocated to reconfiguration activity is subject to change based on additional assessments made over the course of the reconfiguration program. While we and the TA have had extensive conversations regarding our methodology for calculating the amount to be submitted for credit, we have agreed that no further work or costs will be incurred by the TA to assess our methodology or associated costs until such time as it is determined that the total cost of reconfiguration, excluding these allocated costs, is less than our minimum obligation of $2.8 billion.

We estimate, based on our experience to date with the reconfiguration program and on information currently available, that our total direct costs attributable to complete the spectrum reconfigurations will range between

 

23


Table of Contents

SPRINT NEXTEL CORPORATION

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS – (Continued)

 

$2.9 billion and $3.4 billion. This estimate is dependent on significant assumptions, including the final licensee costs, and costs associated with relocating licensees in the Canadian border region under the border plan that was adopted by the FCC on May 9, 2008, and the Mexican border region for which there is currently no approved border plan, and does not include any of our apportioned internal network costs. Actual results could differ from such estimates. In addition, we are entitled to receive reimbursement from the mobile-satellite service licensees for their pro rata portion of our costs of clearing a portion of the 1.9 GHz spectrum. Those licensees may be unable or unwilling to reimburse us for their share of the costs, which we estimate to be approximately $200 million. Accordingly, we believe that it is unlikely that we will be required to make a payment to the U.S. Treasury.

As required under the terms of the Report and Order, we delivered a $2.5 billion letter of credit to provide assurance that funds will be available to pay the relocation costs of the incumbent users of the 800 MHz spectrum. The Report and Order provides for the possibility of periodic reductions in the amount of the letter of credit. During the third quarter 2008, we determined, based on the information available to us, that the total cost of reconfiguring the incumbent users of the 800 MHz are likely to be less than $2.5 billion. The TA reviewed our forecasts and recommended to the FCC a $337 million reduction in the letter of credit based on costs incurred through December 31, 2007 and an $85 million reduction based on additional costs incurred through the first quarter 2008. The FCC concurred with the TA’s two requests and the letter of credit has been reduced to $2.1 billion.

This excerpt taken from the S 10-Q filed May 12, 2008.

Spectrum Reconfiguration Obligations

In recent years, the operations of a number of public safety communications systems in the 800 MHz block of spectrum have experienced interference that is believed to be a result of the operations of commercial mobile radio service, or CMRS, providers operating on adjacent frequencies in the same geographic area.

In 2004, the FCC adopted a Report and Order that included new rules regarding interference in the 800 MHz band and a comprehensive plan to reconfigure the 800 MHz band. In February 2005, Nextel accepted the Report and Order, which was necessary before the order became effective, because the Report and Order required Nextel to undertake a number of obligations and accept modifications to its FCC licenses. We assumed these obligations when we merged with Nextel in August 2005.

The Report and Order provides for the exchange of a portion of our 800 MHz FCC spectrum licenses, which the FCC is implementing through modifications to these licenses, and requires us to fund the cost incurred by public safety systems and other incumbent licensees to reconfigure the 800 MHz spectrum band. Under the Report and Order, we received licenses for 10 MHz of nationwide spectrum in the 1.9 GHz band, but we are required to relocate and reimburse the incumbent licensees in this band for their costs of relocation to another band designated by the FCC. The Report and Order required the completion of the 800 MHz band reconfiguration within a 36-month period, ending June 26, 2008, with exceptions made with respect to markets that border Mexico and Canada. On May 9, 2008, the FCC issued the Canadian border plan which included a 30-month deadline for completion. We believe, based on our experiences to date, that the 800 MHz reconfiguration will not be completed within the applicable FCC designated time period due primarily to circumstances largely outside of our control.

As part of the reconfiguration process in most regions, we must cease using portions of the surrendered 800 MHz spectrum before we are able to commence use of replacement 800 MHz spectrum. On September 11, 2007, the FCC issued a Third Memorandum Opinion and Order, or Third MO&O, in which the FCC ordered, among other things, that by June 26, 2008 we vacate many 800 MHz channels that we currently use, even if the applicable public safety licensee is not ready to relocate to the vacated spectrum. Based upon reports filed by the 800 MHz TA, discussions with public safety licensees and waiver requests filed by licensees, we believe that a significant number of large public safety agencies will not be able to complete their reconfigurations by June 2008. In particular, over 500 licensees have filed waivers with the FCC seeking extensions of time beyond June 26, 2008 to complete their reconfigurations. As of April 30, 2008, only seven non-material waivers had been granted by the FCC. The FCC has

 

20


SPRINT NEXTEL CORPORATION

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

also put into place the possibility of granting us a corresponding waiver that would allow us to stay on certain of our channels until such time as a particular public safety agency is ready to reconfigure its system. On May 1, 2008, we filed a waiver request to retain access to this spectrum. This request has not yet been granted and there is no assurance that the FCC will grant us the requested waiver. The granting of waivers could alleviate some of the spectrum constraints we may face as a result of the Third MO&O. The waiver process does not, however, allow for waivers to be granted for a significant portion of the other spectrum that we need in order to have sufficient capacity during individual reconfigurations with respect to which we are required to give up capacity for a period of time, which can be up to a year, while the licensee reconfigures its system and returns its prior spectrum to us for use.

Any sudden and significant decrease in network capacity that results from the requirements of the Third MO&O could adversely affect the performance of our iDEN network. To compensate, we could attempt to construct additional sites or acquire additional spectrum, to the extent possible. In those markets where these network investments are not possible, we may be required to curtail subscriber additions and/or incentivize certain existing subscribers of iDEN services to use PowerSource devices or move to our CDMA network until the capacity limitation can be alleviated, particularly if the replacement 800 MHz spectrum is not available for a length of time. Degradation in network performance in any market could result in higher subscriber churn in that market. The loss of a significant number of subscribers could adversely affect our Wireless and consolidated results of operations.

We believe that the Third MO&O is not consistent with the terms of the Report and Order or our understanding of the reconfiguration process described in the Report and Order, which served as the basis under which Nextel consented to its terms. In addition, we believe that the process by which the Third MO&O was adopted was legally deficient in a number of respects. Accordingly, on October 12, 2007, we filed an appeal with the U.S. Court of Appeals for the D.C. Circuit. On May 2, 2008, the Court affirmed the FCC’s decision in the Third MO&O. While we are still evaluating the impact of this decision, we remain committed to identifying a resolution to this matter that balances achieving the goals of 800 MHz reconfiguration with meeting the mobile communications needs of our customers.

In addition, as part of the Report and Order, the reconfiguration of the 1.9 GHz band was required to be completed by September 7, 2007, which did not occur. On March 5, 2008, the FCC, in recognition of the complexities involved with the reconfiguration of the 1.9 GHz band, as well as the progress made to date, granted an extension of the 1.9 GHz relocation date until March 5, 2009. The FCC also left open the option of extending this waiver upon further consideration.

The Report and Order requires us to make a payment to the U.S. Treasury at the conclusion of the band reconfiguration process to the extent that the value of the 1.9 GHz spectrum we received exceeds the total of the value of licenses for spectrum in the 700 MHz and 800 MHz bands that we surrendered under the decision, plus the actual costs that we incur to retune incumbents and our own facilities under the Report and Order. The FCC determined under the Report and Order that, for purposes of calculating that payment amount, the value of the 1.9 GHz spectrum is about $4.9 billion and the aggregate value of the 700 MHz spectrum and the 800 MHz spectrum surrendered, net of 800 MHz spectrum received as part of the exchange, is about $2.1 billion, which, because of the potential payment to the U.S. Treasury, results in minimum cash expenditures of about $2.8 billion by us under the Report and Order. The FCC has designated the independent TA to monitor, facilitate and review our expenditures for 800 MHz band reconfiguration. A precise methodology for evaluating and confirming our internal network costs has not yet been established by the TA. Because the TA may not agree that all of the costs we submit as external and internal costs are appropriate or are subject to credit, we may incur certain costs as part of the reconfiguration process for which we will not receive credit against the potential payment to the U.S. Treasury.

In addition, a financial reconciliation is required to be completed at the end of the reconfiguration implementation to determine whether the value of the spectrum rights received exceeds the total of (i) the value

 

21


SPRINT NEXTEL CORPORATION

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

of spectrum rights that are surrendered and (ii) the qualifying costs referred to above. If so, we will be required to pay the difference to the U.S. Treasury, as described above. Based on the FCC’s determination of the values of the spectrum rights received and surrendered by Nextel, the minimum obligation to be incurred under the Report and Order is $2.8 billion. The Report and Order also provides that qualifying costs we incur as part of the reconfiguration plan, including costs to reconfigure our own infrastructure and spectrum positions, can be used to offset the minimum obligation of $2.8 billion; however, we are obligated to pay the full amount of the costs relating to the reconfiguration plan, even if those costs exceed that amount. From the inception of the program through March 31, 2008, we have incurred approximately $1.3 billion of costs directly attributable to the spectrum reconfiguration program. This amount does not include any of our internal network costs that we have preliminarily allocated to the reconfiguration program for capacity sites and modifications for which we may request credit under the reconfiguration program. We estimate, based on our experience to date with the reconfiguration program and on information currently available, that our total direct costs attributable to complete the spectrum reconfigurations will range between $2.7 billion and $3.4 billion. This estimate is dependent on significant assumptions including the final licensee costs, and costs associated with relocating licensees in the Canadian border region under the border plan that was adopted by the FCC on May 9, 2008, and Mexican border region for which there is currently no approved border plan, and does not include any of our apportioned internal network costs. Actual results could differ from such estimates. In addition, we are entitled to receive reimbursement from the mobile-satellite service licensees for their pro rata portion of our costs of clearing a portion of the 1.9 GHz spectrum. Those licensees may be unable or unwilling to reimburse us for their share of the costs, which we estimate to be approximately $200 million. As a result of the Court’s affirmation of the FCC’s decision in the Third MO&O, we currently anticipate that our apportioned network costs or other costs that we may incur to maintain our network, could be substantial and cause the total cost of reconfiguration to exceed $3.4 billion by an amount that could be material; however, the impact of the Court’s decision may be lessened if the FCC grants our waiver request to stay on certain channels for which public safety agencies have requested waivers. Accordingly, we believe that it is unlikely that we will be required to make a payment to the U.S. Treasury.

As required under the terms of the Report and Order, we delivered a $2.5 billion letter of credit to provide assurance that funds will be available to pay the relocation costs of the incumbent users of the 800 MHz spectrum. The Report and Order provides for the possibility of periodic reductions in the amount of the letter of credit. We believe we now have sufficient information regarding the total cost of reconfiguring the incumbent users of the 800 MHz spectrum that would indicate that those costs are likely to be less than $2.5 billion. Accordingly, the TA has reviewed our forecasts and recommended to the FCC a $337 million reduction in the letter of credit based on costs incurred through December 31, 2007. On May 6, 2008, the FCC concurred with the TA’s request and, on May 8, 2008, the letter of credit was reduced to $2.2 billion.

 

Note  10. Subsequent Event

On May 7, 2008, we entered into a definitive agreement with Clearwire Corporation to combine our next-generation wireless broadband businesses to form a new independent company to be called Clearwire. In addition six independent partners, including Intel Corporation through Intel Capital, Google Inc., Comcast Corporation, Time Warner Cable Inc., Bright House Networks, and Trilogy Equity Partners, collectively agreed to invest $3.2 billion in the new Clearwire. The new Clearwire will be focused on expediting the deployment of the first nationwide mobile Worldwide Inter-Operability for Microwave Access, or WiMAX, network to provide a true mobile broadband experience for consumers, small businesses, medium and large enterprises, public safety organizations and educational institutions. Upon completion of the proposed transaction, which we expect to occur in the fourth quarter of 2008, we will become the largest shareholder in the new Clearwire with approximately 51% of the equity ownership, with final determination of our ownership made based on trading price after close. If the transaction closes in 2008, we would expect to record a material gain on the transaction through equity on the consolidated balance sheet based on preliminary valuations due to the recording of our investment balance at an amount equal to approximately 51% of the new Clearwire’s net assets.

 

22


These excerpts taken from the S 10-K filed Feb 29, 2008.

Spectrum Reconfiguration Obligations

In recent years, the operations of a number of public safety communications systems in the 800 MHz block of spectrum have experienced interference that is believed to be a result of the operations of commercial mobile radio service, or CMRS, providers operating on adjacent frequencies in the same geographic area.

In 2001, Nextel filed a proposal with the FCC that would result in a more efficient use of spectrum through the reconfiguration of spectrum licenses and spectrum allocations in the 700, 800 and 900 MHz bands and, thereby, resolve many of these interference problems. In 2004, following a rulemaking to consider proposals to solve the public safety interference issue, the FCC adopted a Report and Order that included new rules regarding interference in the 800 MHz band and a comprehensive plan to reconfigure the 800 MHz band. In February 2005, Nextel accepted the Report and Order, which was necessary before the order became effective, because the Report and Order required Nextel to undertake a number of obligations and accept modifications to its FCC licenses. We assumed these obligations when we merged with Nextel in August 2005.

The Report and Order provides for the exchange of a portion of our FCC spectrum licenses, which the FCC is implementing through modifications to these licenses. Specifically, the Report and Order modified a number of FCC licenses in the 800 MHz band, including many of our licenses, and implemented rules to reconfigure spectrum in the 800 MHz band in a 36-month phased transition process. It also obligated us to surrender all of our holdings in the 700 MHz spectrum band and certain portions of our holdings in the 800 MHz spectrum band, and to fund the cost incurred by public safety systems and other incumbent licensees to reconfigure the 800 MHz spectrum band. Under the Report and Order, we received licenses for 10 MHz of nationwide spectrum in the 1.9 GHz band, but we are required to relocate and reimburse the incumbent licensees in this band for their costs of relocation to another band designated by the FCC.

The reconfiguration process is to be completed by geographic region and involves reaching agreement and coordinating numerous processes with the incumbent licensees in that region, as well as vendors and contractors that will be performing much of the reconfiguration. We are permitted to continue to use the spectrum in the 800 MHz band that was surrendered under the Report and Order during the reconfiguration process; however, as part

 

F-49


Table of Contents

SPRINT NEXTEL CORPORATION

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

of the reconfiguration process in most regions, we must cease using portions of the surrendered 800 MHz spectrum before we are able to commence use of replacement 800 MHz spectrum, which has contributed to the capacity constraints experienced on our iDEN network, particularly in some of our more capacity constrained markets, and has impacted the performance of our iDEN network in the affected markets.

The Report and Order requires us to complete the 800 MHz band reconfiguration within a 36-month period, ending in June 2008, subject to certain exceptions, particularly with respect to markets that border Mexico and Canada, and to complete the 1.9 GHz band reconfiguration within a 31.5-month period, originally ending in September 2007 and recently extended, as discussed below. If, as a result of events within our control, we fail to complete our reconfiguration responsibilities within the designated time periods for either the 800 MHz or 1.9 GHz reconfigurations, the FCC could take actions against us to enforce the Report and Order. These actions could have adverse operating or financial impacts on us, some of which could be material. We believe, based on our experiences to date, that the 800 MHz reconfiguration will not be completed within the applicable FCC designated time period due primarily to circumstances largely outside of our control.

On September 11, 2007, the FCC issued a Third Memorandum Opinion and Order, or Third MO&O, in which the FCC ordered, among other things, that by June 2008 we vacate many 800 MHz channels that we currently use, even if the applicable public safety licensee is not ready to relocate to the vacated spectrum. Based upon reports filed by the 800 MHz TA and discussions with public safety licensees, we believe that a significant number of large public safety agencies will not be able to complete their reconfigurations by June 2008. Should this occur, the Third MO&O provides that we would no longer have access to a significant portion of 800 MHz spectrum.

Any sudden and significant decrease in network capacity that results from the requirements of the Third MO&O could adversely affect the performance of our iDEN network. To compensate, we could attempt to construct additional sites or acquire additional spectrum, to the extent possible. In those markets where these network investments are not possible, we may be required to curtail subscriber additions and incent certain existing subscribers of iDEN services to use PowerSource devices or move to our CDMA network until the capacity limitation can be alleviated, particularly if the replacement 800 MHz spectrum is not available for any length of time. Degradation in network performance in any market could result in higher subscriber churn in that market. The loss of a significant number of subscribers could adversely affect our results of operations.

We believe that the Third MO&O is not consistent with the terms of the Report and Order or our understanding of the reconfiguration process described in the Report and Order, which served as the basis under which Nextel consented to its terms. In addition, we believe that the process by which the Third MO&O was adopted was legally deficient in a number of respects. Accordingly, on October 12, 2007, we filed an appeal with the U.S. Court of Appeals for the D.C. Circuit. On November 27, 2007, the U.S. Court of Appeals granted our Motion for Expedition, setting forth an accelerated briefing schedule which should result in a decision by the Court by the FCC’s June 2008 deadline. Both the FCC and we have filed our briefs with the Court, and oral arguments are scheduled to begin March 18, 2008.

In addition, as part of the Report and Order, the reconfiguration of the 1.9 GHz band was required to be completed by September 7, 2007. On September 5, 2007, we, along with the Association for Maximum Service Television, Inc., or MSTV, the National Association of Broadcasters, or NAB, and the Society of Broadcast Engineers, or SBE, filed a joint petition requesting an additional 29 months to complete the transition of the broadcast auxiliary service, or BAS, to frequencies above 2025 MHz. On November 6, 2007, the FCC granted a waiver until January 5, 2008 to complete the BAS transition above 2025 MHz. On December 6, 2007, Sprint Nextel, the MSTV, the NAB and the SBE submitted a consensus plan for completing the transition of the BAS

 

F-50


Table of Contents

SPRINT NEXTEL CORPORATION

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

licensees that should complete the BAS transition by September, 2009. The FCC subsequently extended the waiver of the BAS relocation date until March 5, 2008 and encouraged the BAS licensees and new entrant mobile-satellite service licensees to continue discussing ways to share use of the spectrum before the transition is completed.

The Report and Order requires us to make a payment to the U.S. Treasury at the conclusion of the band reconfiguration process to the extent that the value of the 1.9 GHz spectrum we received exceeds the total of the value of licenses for spectrum positions in the 700 MHz and 800 MHz bands that we surrendered under the decision, plus the actual costs that we incur to retune incumbents and our own facilities under the Report and Order. The FCC determined under the Report and Order that, for purposes of calculating that payment amount, the value of the 1.9 GHz spectrum is about $4.9 billion and the aggregate value of the 700 MHz spectrum and the 800 MHz spectrum surrendered, net of 800 MHz spectrum received as part of the exchange, is about $2.1 billion, which, because of the potential payment to the U.S. Treasury, results in minimum cash expenditures of about $2.8 billion by us under the Report and Order. The FCC has designated an independent Transition Administrator to monitor, facilitate and review our expenditures for 800 MHz band reconfiguration. A precise methodology for evaluating and confirming our internal network costs has not yet been established by the TA. Because the TA may not agree that all of the costs we submit as external and internal costs are appropriate or are subject to credit, we may incur certain costs as part of the reconfiguration process for which we will not receive credit against the potential payment to the U.S. Treasury.

In addition, a financial reconciliation is required to be completed at the end of the reconfiguration implementation to determine whether the value of the spectrum rights received exceeds the total of (i) the value of spectrum rights that are surrendered and (ii) the qualifying costs referred to above. If so, we will be required to pay the difference to the U.S. Treasury, as described above. Based on the FCC’s determination of the values of the spectrum rights received and surrendered by Nextel, the minimum obligation to be incurred under the Report and Order is $2.8 billion. The Report and Order also provides that qualifying costs we incur as part of the reconfiguration plan, including costs to reconfigure our own infrastructure and spectrum positions, can be used to offset the minimum obligation of $2.8 billion; however, we are obligated to pay the full amount of the costs relating to the reconfiguration plan, even if those costs exceed that amount. From the inception of the program and through December 31, 2007, we have incurred approximately $1.1 billion of costs directly attributable to the spectrum reconfiguration program. This amount does not include any of our internal network costs that we have preliminarily allocated to the reconfiguration program for capacity sites and modifications for which we may request credit under the reconfiguration program. If we are successful in our appeal of the Third MO&O, we estimate, based on our experience to date with the reconfiguration program and on information currently available, that it is unlikely we will be required to make a payment to the U.S. Treasury. This belief is dependent on significant assumptions including the final licensee costs, and costs associated with relocating licensees in the Canadian and Mexican border regions for which there are currently no approved border plans and does not include any of our apportioned internal network costs. Actual results could differ from such estimates. In addition, we are entitled to receive reimbursement from the mobile-satellite service licensees for their pro rata portion of our costs of clearing a portion of the 1.9 GHz spectrum. Those licensees may be unable or unwilling to reimburse us for their share of the costs, which we estimate to be approximately $200 million. If we are unsuccessful in our appeal of the Third MO&O, we anticipate that our additional costs would likely be material.

As required under the terms of the Report and Order, we delivered a $2.5 billion letter of credit to provide assurance that funds will be available to pay the relocation costs of the incumbent users of the 800 MHz spectrum. Although the Report and Order provides for the possibility of periodic reductions in the amount of the letter of credit, no reductions had been requested or made as of December 31, 2007.

 

F-51


Table of Contents

SPRINT NEXTEL CORPORATION

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 

As of December 31, 2007, we had a remaining liability of $59 million associated with the estimated portion of the reconfiguration costs that represents our best estimate of amounts to be paid under the Report and Order that would not benefit our infrastructure or spectrum positions. All other costs incurred pursuant to the Report and Order that relate to the spectrum and infrastructure, when expended, are accounted for either as property, plant and equipment or as additions to the FCC licenses intangible asset, consistent with our accounting policies. See note 3 for more information.

Spectrum Reconfiguration Obligations

In recent years, the operations of a number of public safety communications systems in the 800 MHz block of spectrum have experienced
interference that is believed to be a result of the operations of commercial mobile radio service, or CMRS, providers operating on adjacent frequencies in the same geographic area.

STYLE="margin-top:12px;margin-bottom:0px; text-indent:4%">In 2001, Nextel filed a proposal with the FCC that would result in a more efficient use of spectrum through the reconfiguration of spectrum licenses and
spectrum allocations in the 700, 800 and 900 MHz bands and, thereby, resolve many of these interference problems. In 2004, following a rulemaking to consider proposals to solve the public safety interference issue, the FCC adopted a Report and Order
that included new rules regarding interference in the 800 MHz band and a comprehensive plan to reconfigure the 800 MHz band. In February 2005, Nextel accepted the Report and Order, which was necessary before the order became effective, because the
Report and Order required Nextel to undertake a number of obligations and accept modifications to its FCC licenses. We assumed these obligations when we merged with Nextel in August 2005.

STYLE="margin-top:12px;margin-bottom:0px; text-indent:4%">The Report and Order provides for the exchange of a portion of our FCC spectrum licenses, which the FCC is implementing through modifications to these
licenses. Specifically, the Report and Order modified a number of FCC licenses in the 800 MHz band, including many of our licenses, and implemented rules to reconfigure spectrum in the 800 MHz band in a 36-month phased transition process. It also
obligated us to surrender all of our holdings in the 700 MHz spectrum band and certain portions of our holdings in the 800 MHz spectrum band, and to fund the cost incurred by public safety systems and other incumbent licensees to reconfigure the 800
MHz spectrum band. Under the Report and Order, we received licenses for 10 MHz of nationwide spectrum in the 1.9 GHz band, but we are required to relocate and reimburse the incumbent licensees in this band for their costs of relocation to another
band designated by the FCC.

The reconfiguration process is to be completed by geographic region and involves reaching agreement and
coordinating numerous processes with the incumbent licensees in that region, as well as vendors and contractors that will be performing much of the reconfiguration. We are permitted to continue to use the spectrum in the 800 MHz band that was
surrendered under the Report and Order during the reconfiguration process; however, as part

 


F-49







Table of Contents



SPRINT NEXTEL CORPORATION

ALIGN="center">NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 



of the reconfiguration process in most regions, we must cease using portions of the surrendered 800 MHz spectrum before we are able to commence use of
replacement 800 MHz spectrum, which has contributed to the capacity constraints experienced on our iDEN network, particularly in some of our more capacity constrained markets, and has impacted the performance of our iDEN network in the affected
markets.

The Report and Order requires us to complete the 800 MHz band reconfiguration within a 36-month period, ending in June 2008,
subject to certain exceptions, particularly with respect to markets that border Mexico and Canada, and to complete the 1.9 GHz band reconfiguration within a 31.5-month period, originally ending in September 2007 and recently extended, as discussed
below. If, as a result of events within our control, we fail to complete our reconfiguration responsibilities within the designated time periods for either the 800 MHz or 1.9 GHz reconfigurations, the FCC could take actions against us to enforce the
Report and Order. These actions could have adverse operating or financial impacts on us, some of which could be material. We believe, based on our experiences to date, that the 800 MHz reconfiguration will not be completed within the applicable FCC
designated time period due primarily to circumstances largely outside of our control.

On September 11, 2007, the FCC issued a Third
Memorandum Opinion and Order, or Third MO&O, in which the FCC ordered, among other things, that by June 2008 we vacate many 800 MHz channels that we currently use, even if the applicable public safety licensee is not ready to relocate to
the vacated spectrum. Based upon reports filed by the 800 MHz TA and discussions with public safety licensees, we believe that a significant number of large public safety agencies will not be able to complete their reconfigurations by June 2008.
Should this occur, the Third MO&O provides that we would no longer have access to a significant portion of 800 MHz spectrum.

Any
sudden and significant decrease in network capacity that results from the requirements of the Third MO&O could adversely affect the performance of our iDEN network. To compensate, we could attempt to construct additional sites or acquire
additional spectrum, to the extent possible. In those markets where these network investments are not possible, we may be required to curtail subscriber additions and incent certain existing subscribers of iDEN services to use PowerSource devices or
move to our CDMA network until the capacity limitation can be alleviated, particularly if the replacement 800 MHz spectrum is not available for any length of time. Degradation in network performance in any market could result in higher
subscriber churn in that market. The loss of a significant number of subscribers could adversely affect our results of operations.

We
believe that the Third MO&O is not consistent with the terms of the Report and Order or our understanding of the reconfiguration process described in the Report and Order, which served as the basis under which Nextel consented to its terms. In
addition, we believe that the process by which the Third MO&O was adopted was legally deficient in a number of respects. Accordingly, on October 12, 2007, we filed an appeal with the U.S. Court of Appeals for the D.C. Circuit. On
November 27, 2007, the U.S. Court of Appeals granted our Motion for Expedition, setting forth an accelerated briefing schedule which should result in a decision by the Court by the FCC’s June 2008 deadline. Both the FCC and we have filed
our briefs with the Court, and oral arguments are scheduled to begin March 18, 2008.

In addition, as part of the Report and Order,
the reconfiguration of the 1.9 GHz band was required to be completed by September 7, 2007. On September 5, 2007, we, along with the Association for Maximum Service Television, Inc., or MSTV, the National Association of Broadcasters,
or NAB, and the Society of Broadcast Engineers, or SBE, filed a joint petition requesting an additional 29 months to complete the transition of the broadcast auxiliary service, or BAS, to frequencies above 2025 MHz. On November 6,
2007, the FCC granted a waiver until January 5, 2008 to complete the BAS transition above 2025 MHz. On December 6, 2007, Sprint Nextel, the MSTV, the NAB and the SBE submitted a consensus plan for completing the transition of the BAS

 


F-50







Table of Contents



SPRINT NEXTEL CORPORATION

ALIGN="center">NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 



licensees that should complete the BAS transition by September, 2009. The FCC subsequently extended the waiver of the BAS relocation date until March 5,
2008 and encouraged the BAS licensees and new entrant mobile-satellite service licensees to continue discussing ways to share use of the spectrum before the transition is completed.

STYLE="margin-top:12px;margin-bottom:0px; text-indent:4%">The Report and Order requires us to make a payment to the U.S. Treasury at the conclusion of the band reconfiguration process to the extent that the
value of the 1.9 GHz spectrum we received exceeds the total of the value of licenses for spectrum positions in the 700 MHz and 800 MHz bands that we surrendered under the decision, plus the actual costs that we incur to retune incumbents and our own
facilities under the Report and Order. The FCC determined under the Report and Order that, for purposes of calculating that payment amount, the value of the 1.9 GHz spectrum is about $4.9 billion and the aggregate value of the 700 MHz spectrum
and the 800 MHz spectrum surrendered, net of 800 MHz spectrum received as part of the exchange, is about $2.1 billion, which, because of the potential payment to the U.S. Treasury, results in minimum cash expenditures of about $2.8 billion
by us under the Report and Order. The FCC has designated an independent Transition Administrator to monitor, facilitate and review our expenditures for 800 MHz band reconfiguration. A precise methodology for evaluating and confirming our internal
network costs has not yet been established by the TA. Because the TA may not agree that all of the costs we submit as external and internal costs are appropriate or are subject to credit, we may incur certain costs as part of the reconfiguration
process for which we will not receive credit against the potential payment to the U.S. Treasury.

In addition, a financial reconciliation
is required to be completed at the end of the reconfiguration implementation to determine whether the value of the spectrum rights received exceeds the total of (i) the value of spectrum rights that are surrendered and (ii) the qualifying
costs referred to above. If so, we will be required to pay the difference to the U.S. Treasury, as described above. Based on the FCC’s determination of the values of the spectrum rights received and surrendered by Nextel, the minimum obligation
to be incurred under the Report and Order is $2.8 billion. The Report and Order also provides that qualifying costs we incur as part of the reconfiguration plan, including costs to reconfigure our own infrastructure and spectrum positions, can be
used to offset the minimum obligation of $2.8 billion; however, we are obligated to pay the full amount of the costs relating to the reconfiguration plan, even if those costs exceed that amount. From the inception of the program and through
December 31, 2007, we have incurred approximately $1.1 billion of costs directly attributable to the spectrum reconfiguration program. This amount does not include any of our internal network costs that we have preliminarily allocated to the
reconfiguration program for capacity sites and modifications for which we may request credit under the reconfiguration program. If we are successful in our appeal of the Third MO&O, we estimate, based on our experience to date with the
reconfiguration program and on information currently available, that it is unlikely we will be required to make a payment to the U.S. Treasury. This belief is dependent on significant assumptions including the final licensee costs, and costs
associated with relocating licensees in the Canadian and Mexican border regions for which there are currently no approved border plans and does not include any of our apportioned internal network costs. Actual results could differ from such
estimates. In addition, we are entitled to receive reimbursement from the mobile-satellite service licensees for their pro rata portion of our costs of clearing a portion of the 1.9 GHz spectrum. Those licensees may be unable or unwilling to
reimburse us for their share of the costs, which we estimate to be approximately $200 million. If we are unsuccessful in our appeal of the Third MO&O, we anticipate that our additional costs would likely be material.

STYLE="margin-top:12px;margin-bottom:0px; text-indent:4%">As required under the terms of the Report and Order, we delivered a $2.5 billion letter of credit to provide assurance that funds will be available
to pay the relocation costs of the incumbent users of the 800 MHz spectrum. Although the Report and Order provides for the possibility of periodic reductions in the amount of the letter of credit, no reductions had been requested or made as of
December 31, 2007.

 


F-51







Table of Contents



SPRINT NEXTEL CORPORATION

ALIGN="center">NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—(Continued)

 


As of December 31, 2007, we had a remaining liability of $59 million associated with the
estimated portion of the reconfiguration costs that represents our best estimate of amounts to be paid under the Report and Order that would not benefit our infrastructure or spectrum positions. All other costs incurred pursuant to the Report and
Order that relate to the spectrum and infrastructure, when expended, are accounted for either as property, plant and equipment or as additions to the FCC licenses intangible asset, consistent with our accounting policies. See note 3 for more
information.

Wikinvest © 2006, 2007, 2008, 2009, 2010, 2011, 2012. Use of this site is subject to express Terms of Service, Privacy Policy, and Disclaimer. By continuing past this page, you agree to abide by these terms. Any information provided by Wikinvest, including but not limited to company data, competitors, business analysis, market share, sales revenues and other operating metrics, earnings call analysis, conference call transcripts, industry information, or price targets should not be construed as research, trading tips or recommendations, or investment advice and is provided with no warrants as to its accuracy. Stock market data, including US and International equity symbols, stock quotes, share prices, earnings ratios, and other fundamental data is provided by data partners. Stock market quotes delayed at least 15 minutes for NASDAQ, 20 mins for NYSE and AMEX. Market data by Xignite. See data providers for more details. Company names, products, services and branding cited herein may be trademarks or registered trademarks of their respective owners. The use of trademarks or service marks of another is not a representation that the other is affiliated with, sponsors, is sponsored by, endorses, or is endorsed by Wikinvest.