XEL » Topics » Item 1. Legal Proceedings

This excerpt taken from the XEL 10-Q filed Oct 24, 2008.
Item 1. LEGAL PROCEEDINGS

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. After consultation with legal counsel, Xcel Energy has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 6 and 7 of the consolidated financial statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated by reference. Reference also is made to Item 3 and Notes 14 and 15 of Xcel Energy’s consolidated financial statements in its Annual Report on Form 10-K filed for the year ended Dec. 31, 2007, for a description of certain legal proceedings presently pending.

 

57



This excerpt taken from the XEL 10-Q filed Aug 1, 2008.
Item 1. LEGAL PROCEEDINGS

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. After consultation with legal counsel, Xcel Energy has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 6 and 7 of the consolidated financial statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated by reference. Reference also is made to Item 3 and Notes 14 and 15 of Xcel Energy’s consolidated financial statements in its Annual Report on Form 10-K filed for the year ended Dec. 31, 2007, for a description of certain legal proceedings presently pending.

 

50



This excerpt taken from the XEL 10-Q filed May 2, 2008.
Item 1. Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. After consultation with legal counsel, Xcel Energy has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 6 and 7 of the Consolidated Financial Statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated by reference. Reference also is made to Item 3 and Notes 14 and 15 of Xcel Energy’s consolidated financial statements in its Annual Report on Form 10-K filed for the year ended Dec. 31, 2007, for a description of certain legal proceedings presently pending.

 

This excerpt taken from the XEL 10-Q filed Dec 13, 2007.
Item 1. Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. After consultation with legal counsel, Xcel Energy has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 6 and 7 of the Consolidated Financial Statements in this Quarterly Report on Form 10-Q/A for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated

 

57



 

by reference. Reference also is made to Item 3 of Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2006 and Note 16 of Consolidated Financial Statements included in Xcel Energy’s Current Report on Form 8-K/A filed on Dec. 13, 2007, for a description of certain legal proceedings presently pending.

 

This excerpt taken from the XEL 10-Q filed Dec 13, 2007.
Item 1. Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. After consultation with legal counsel, Xcel Energy has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 6 and 7 of the Consolidated Financial Statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated by reference. Reference also is made to Item 3 of Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2006, and Note 16 of Xcel Energy’s consolidated financial statements in its Current Report on Form 8-K/A filed on Dec. 13, 2007, for a description of certain legal proceedings presently pending.

 

This excerpt taken from the XEL 10-Q filed Oct 26, 2007.
Item 1. Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. After consultation with legal counsel, Xcel Energy has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 5 and 6 of the

 

53



 

Consolidated Financial Statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated by reference. Reference also is made to Item 3 and Note 14 of Xcel Energy’s consolidated financial statements in its Current Report on Form 8-K filed on Aug. 8, 2007 for a description of certain legal proceedings presently pending.

 

This excerpt taken from the XEL 8-K filed Oct 25, 2007.

Note 6.  Legal Proceedings

 

In 1998, NSP-Minnesota filed a complaint in the U.S. Court of Federal Claims against the United States, requesting breach of contract damages for the Department of Energy’s failure to begin disposing of spent nuclear fuel from Prairie Island and Monticello.

 

On Sept. 26, 2007, the Court awarded NSP-Minnesota $116.5 million.  The damage award included $43 million for the construction and operation of on-site storage facilities; $49 million for compliance with legislative mandates; and $25 million to cover expenses associated with efforts to develop an off-site private storage facility.

 

Results of the judgment will not be recorded in earnings until cash is received and the regulatory treatment and amounts to be shared with rate payers has been resolved.  Given the uncertainty of a potential appeal and regulatory treatment by the various utility commissions, it is unclear as to how much, if any, of this judgment will ultimately have a net impact on earnings.

 

10



 

This excerpt taken from the XEL 10-Q filed Jul 27, 2007.
Item 1. Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. After consultation with legal counsel, Xcel Energy has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 5 and 6 of the Consolidated Financial Statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated by reference. Reference also is made to Item 3 and Note 14 of Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2006 for a description of certain legal proceedings presently pending.

 

This excerpt taken from the XEL 10-Q filed Apr 27, 2007.
Item 1. Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. After consultation with legal counsel, Xcel Energy has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 5 and 6 of the Financial Statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated by reference. Reference also is made to Item 3 and Notes 14 of Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2006 for a description of certain legal proceedings presently pending. Except as discussed herein, there are no new significant cases to report against Xcel Energy and there have been no notable changes in the previously reported proceedings.

 

MGP Insurance Coverage Litigation — In October 2003, NSP-Wisconsin initiated discussions with its insurers regarding the availability of insurance coverage for costs associated with the remediation of four former MGP sites located in Ashland, Chippewa Falls, Eau Claire, and LaCrosse, Wis. In lieu of participating in discussions, on Oct. 28, 2003, two of NSP-Wisconsin’s insurers, St. Paul Fire & Marine Insurance Co. and St. Paul Mercury Insurance Co., commenced litigation against NSP-Wisconsin in Minnesota state district court. On Nov. 12, 2003, NSP-Wisconsin commenced suit in Wisconsin state circuit court against St. Paul Fire & Marine Insurance Co. and its other insurers. Subsequently, the Minnesota court enjoined NSP-Wisconsin from pursuing the Wisconsin litigation. Although the Wisconsin action has not been dismissed, the January 2007 trial date was adjourned and has not been rescheduled.

 

NSP-Wisconsin has entered into confidential settlements with St. Paul Mercury Insurance Company, St. Paul Fire and Marine Insurance Company and the Phoenix Insurance Company (St. Paul Companies), Associated Electric & Gas Insurance Services Limited, Fireman’s Fund Insurance Company, INSCO, Ltd. (on its own behalf and on behalf of the insurance companies subscribing per Britamco, Ltd.), Allstate Insurance Company, Admiral Insurance Company; certain underwriters at Lloyd’s, London and certain London Market Insurance Companies (London Market Insurers), and Compagnie Europeene D’ Assurances Industrielles S.A. These insurers have been dismissed from the Minnesota and Wisconsin actions. These settlements are not expected to have a material effect on Xcel Energy’s financial results.

NSP-Wisconsin has reached settlements in principle with General Reinsurance Corporation and First State and Twin City Fire Insurance Companies. These settlements are not expected to have a material effect on Xcel Energy’s financial results.

 

On Oct. 6, 2006, the trial court issued a memorandum and order on various summary judgment motions. The court ruled that Minnesota law on allocation applies and ordered dismissal, without prejudice, of 15 carriers whose coverage would not be triggered under such an allocation method. The court denied the insurers’ motions for summary judgment on the sudden and accidental and absolute pollution exclusions; late notice; legal expenses and costs; certain specific lost policies; and miscellaneous coverage issues under several individual policies. The court granted the motions of Fidelity and Casualty Insurance Company and Continental Insurance Company related to certain specific lost policies. On Oct. 13, 2006, the trial court denied NSP-Wisconsin’s request for leave to file a motion for reconsideration of the court’s allocation decision. The Nov. 6, 2006 trial date was also adjourned to allow for additional discovery and potential motions in light of the Minnesota Supreme Court’s recent allocation decision in Wooddale Builders,

 

39



 

Inc. v. Maryland Casualty Company, 722 N. W.2d 283 (Minn. 2006). The insurers have moved for summary judgement based upon Wooddale Builders. At the court’s request, the parties have submitted additional briefs on the choice of law issue. A hearing on these issues has been scheduled for May 21, 2007. The trial has been set for a four-week period commencing on July 16, 2007.

The PSCW has established a deferral process whereby clean-up costs associated with the remediation of former MGP sites are deferred and, if approved by the PSCW, recovered from ratepayers. Carrying charges associated with these clean-up costs are not subject to the deferral process and are not recoverable from ratepayers. Any insurance proceeds received by NSP-Wisconsin will operate as a credit to ratepayers, therefore, these lawsuits are not expected to have a material effect on Xcel Energy’s financial results.

 

Payne et al. vs. PSCo et al. In late October 2003, there was a wildfire in Boulder County, Colorado. There was no loss of life, but there was property damage associated with this fire. On Oct. 28, 2005, an action against PSCo relating to this fire was filed in Boulder County District Court. There are 22 plaintiffs, including individuals, the City of Jamestown and two companies, and three co-defendants, including PSCo. Plaintiffs asserted that a tree falling into PSCo distribution lines may have caused the fire. The matter was ultimately settled in March 2007 and  the settlement did not have a material effect on Xcel Energy’s financial results.

 

Arandell vs. e prime, Xcel Energy, NSP-Wisconsin et al.   In February 2007, a complaint was filed alleging that NSP-Wisconsin, Xcel Energy and e prime, among others, engaged in fraud and anticompetitive activities in conspiring to restrain the trade of natural gas and manipulate natural gas prices. The plaintiffs seek a declaration that contracts for natural gas entered into between Jan. 1, 2000 and Oct. 31, 2002 are void, that they are entitled to repayment for amounts paid for natural gas during that time period, and that treble damages are appropriate. The case was filed in the Wisconsin State Court (Dane County), and then removed to U.S. District Court for the Western District of Wisconsin. The plaintiffs have filed a motion to remand the matter to state court. NSP-Wisconsin, together with the other defendants, intend to oppose the motion for remand and seek dismissal of all claims.

 

Heartland Regional Medical Center vs. e prime, Xcel Energy et al. In March 2007, a complaint was filed in the Circuit Court of Buchanan County, Missouri on behalf of a purported class of natural gas purchasers alleging that defendants, including e prime and Xcel Energy, engaged in a conspiracy and falsely reported natural gas trades in an effort to artificially raise natural gas prices. The complaint alleges restraint of trade, price manipulation, and violation of Missouri’s antitrust laws. e prime and Xcel Energy deny the allegations and, together with the other defendants, intend to seek dismissal of all claims.

 

This excerpt taken from the XEL DEF 14A filed Apr 18, 2007.

LEGAL PROCEEDINGS

Beginning in July 2002, several lawsuits purporting to be class actions on behalf of certain purchasers of the Company’s common stock were filed in the U.S. District Court for the District of Minnesota. The lawsuits, which were consolidated, alleged violations of Section 10(b) of the 1934 Act and Rule 10b 5 thereunder relating to allegedly false and misleading disclosures concerning, among other things, “round trip” energy trades and the nature, extent and seriousness of liquidity and credit difficulties at NRG. The complaints named Xcel Energy; Wayne H. Brunetti, former chairman and chief executive officer; Edward J. McIntyre, former vice president and chief financial officer; former chairman James J. Howard; Gary R. Johnson, general counsel, and Richard C. Kelly, then president of Xcel Energy Enterprises, as defendants.

In August 2002, a shareholder derivative action was filed in the U.S. District Court for the District of Minnesota, purportedly on behalf of Xcel Energy, against the directors and certain present and former officers, citing allegedly false and misleading disclosures and asserting breach of fiduciary duty.

In September and October 2002, two essentially identical actions were filed in the U.S. District Court for the District of Colorado, purportedly on behalf of classes of employee participants in the Company’s and its predecessors’ 401(k) or employee stock ownership plans. The complaints alleged violations of the Employee Retirement Income Security Act of 1974 (ERISA) in the form of breach of fiduciary duty in allowing or encouraging the purchase, contribution and/or retention of the Company’s common stock in the plans. The complaints named as defendants Xcel Energy, its directors, certain former directors and certain former officers.

On April 1, 2005, the U.S. District Court for the District of Minnesota approved a settlement agreement relating to all of these lawsuits. Under the terms of the settlement of the securities and ERISA claims, the Company’s insurance carriers agreed to pay $70.5 million and the Company paid $17.5 million. Settlement of the derivative lawsuit involved the Company’s adoption of certain corporate governance measures and payment of plaintiff’s attorney’s fees and expenses, of which the Company paid $125,000. The settlements included no admission of liability by the Company or any individual defendant.

The Company is obligated to indemnify its officers and directors under certain circumstances to the fullest extent permitted by Minnesota law. As part of that obligation, the Company has advanced and will continue to advance certain attorneys’ fees and expenses incurred by officers and directors in various litigation, including the litigation described above. In connection with the derivative proceedings described above, for the period July 31, 2002 through March 31, 2003, the period April 1, 2003 through March 31, 2004, the period April 1, 2004 through March 31, 2005, and the period April 1, 2005 through March 1, 2006, the Company has advanced expenses of approximately $22,000, $56,000, $107,000 and less than $5,000, respectively, to the law firm of Jones Day on behalf of the Company’s directors and Mr. Edward J. McIntyre, former vice president and chief financial officer, approximately $15,000, $7,000, $3,000 and less than $1,000, respectively, to the law firm of Briggs and Morgan on behalf of the Company’s directors and Mr. Edward J. McIntyre, former vice president and chief financial officer and approximately $8,000, $7,000, $4,000 and less than $1,000, respectively, to the law firm of Rider Bennett on behalf of Mr. James J. Howard, former chairman.

This excerpt taken from the XEL 10-Q filed Aug 3, 2006.
Item 1. Legal Proceedings

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. Management, after consultation with legal counsel, has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 3, 4 and 5 of the consolidated financial statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated by reference. Reference also is made to Item 3 of Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2005 and Note 14 of the consolidated financial statements in such Form 10-K for a description of certain legal proceedings presently pending. Except as discussed in Notes 3, 4 and 5 herein, there are no new significant cases to report against Xcel Energy, and there have been no notable changes in the previously reported proceedings.

Manufactured Gas Plant Insurance Coverage Litigation (NSP-Wisconsin) — In October 2003, NSP-Wisconsin initiated discussions with its insurers regarding the availability of insurance coverage for costs associated with the remediation of four former MGP sites located in Ashland, Chippewa Falls, Eau Claire, and LaCrosse, Wis. In lieu of participating in discussions, on Oct. 28, 2003, two of NSP-Wisconsin’s insurers, St. Paul Fire & Marine Insurance Co. and St. Paul Mercury Insurance Co., commenced litigation against NSP-Wisconsin in Minnesota state district court. On Nov. 12, 2003, NSP-Wisconsin commenced suit in Wisconsin state circuit court against St. Paul Fire & Marine Insurance Co. and its other insurers. Subsequently, the Minnesota court enjoined NSP-Wisconsin from pursuing the Wisconsin litigation.  Although the Wisconsin action has not been dismissed, the January 2007 trial date has been adjourned and has not been rescheduled.  Trial in the Minnesota action is scheduled to commence on Nov. 6, 2006.

NSP-Wisconsin has entered into confidential settlements with St. Paul Mercury Insurance Company, St. Paul Fire and Marine

40




Insurance Company and the Phoenix Insurance Company (“St. Paul Companies”), and these insurers have been dismissed from the Minnesota and Wisconsin actions.  These settlements will not have a material effect on Xcel Energy’s financial results.

NSP-Wisconsin has reached settlements in principle with Admiral Insurance Company; Associated Electric & Gas Insurance Services Limited; Allstate Insurance Co; Compagnie Europeene D’Assurances Industrielles S.A.; Fireman’s Fund Insurance Company; INSCO, Ltd. (on its own behalf and on behalf of the insurance companies subscribing per Britamco, Ltd.); certain Underwriters at Lloyd’s, London and certain London Market Insurance Companies (“London Market Insurers”) and General Reinsurance Corporation.  These settlements will not have a material effect on Xcel Energy’s financial results.

On April 17, 2006, the London Market Insurers, together with other insurers, moved for summary judgment on choice of law and allocation of damages.  The motion is scheduled for hearing on August 3, 2006.  On June 19, 2006, certain insurers filed additional motions for summary judgment on various coverage issues, including choice of law, allocation of damages, justiciability, election of contract, late notice, legal fees and costs, lost policies, and pollution exclusion.  These motions are scheduled for hearing on Sept. 11 and 12, 2006.

The PSCW has established a deferral process whereby clean-up costs associated with the remediation of former MGP sites are deferred and, if approved by the PSCW, recovered from ratepayers. Carrying charges associated with these clean-up costs are not subject to the deferral process and are not recoverable from ratepayers. Any insurance proceeds received by NSP-Wisconsin will operate as a credit to ratepayers, therefore, these lawsuits should not have a material effect on Xcel Energy’s financial results.

Cornerstone Propane Partners, L.P. et al. vs. e prime inc. et al. On Feb. 2, 2004, a purported class action complaint was filed in the U.S. District Court for the Southern District of New York against e prime and three other defendants by Cornerstone Propane Partners, L.P., Robert Calle Gracey and Dominick Viola on behalf of a class who purchased or sold one or more New York Mercantile Exchange natural gas futures and/or options contracts during the period from Jan. 1, 2000, to Dec. 31, 2002. The complaint alleges that defendants manipulated the price of natural gas futures and options and/or the price of natural gas underlying those contracts in violation of the Commodities Exchange Act. In February 2004, the plaintiff requested that this action be consolidated with a similar suit involving Reliant Energy Services. In February 2004, defendants, including e prime, filed motions to dismiss. In September 2004, the U.S. District Court denied the motions to dismiss.  On Jan. 25, 2005, plaintiffs filed a motion for class certification, which defendants opposed.   On Sept. 30, 2005, the U.S. District Court granted plaintiffs’ motion for class certification. On Oct. 17, 2005, defendants filed a petition with the U.S. Court of Appeals for the Second Circuit challenging the class certification.  On Dec. 5, 2005, e prime reached a tentative settlement with the plaintiffs that received final court approval in May 2006.  The settlement was paid by e prime and it did not have a material financial impact on Xcel Energy.

This excerpt taken from the XEL 10-Q filed May 1, 2006.
Item 1. Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. Management, after

 

30



 

consultation with legal counsel, has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 3 and 4 of the consolidated financial statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated by reference. Reference also is made to Item 3 of Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2005 and Note 14 of the consolidated financial statements in such Form 10-K for a description of certain legal proceedings presently pending. Except as discussed in Notes 3 and 4 herein, there are no new significant cases to report against Xcel Energy, and there have been no notable changes in the previously reported proceedings.

 

Manufactured Gas Plant Insurance Coverage Litigation (NSP-Wisconsin) In October 2003, NSP-Wisconsin initiated discussions with its insurers regarding the availability of insurance coverage for costs associated with the remediation of four former MGP sites located in Ashland, Chippewa Falls, Eau Claire, and LaCrosse, Wis. In lieu of participating in discussions, on Oct. 28, 2003, two of NSP-Wisconsin’s insurers, St. Paul Fire & Marine Insurance Co. and St. Paul Mercury Insurance Co., commenced litigation against NSP-Wisconsin in Minnesota state district court. On Nov. 12, 2003, NSP-Wisconsin commenced suit in Wisconsin state circuit court against St. Paul Fire & Marine Insurance Co. and its other insurers. Subsequently, the Wisconsin court denied the insurers’ motion to stay the Wisconsin case pending resolution of the Minnesota action. On Jan. 6, 2005, the Minnesota court issued an injunction prohibiting NSP-Wisconsin from prosecuting the Wisconsin action. On Dec. 27, 2005, the Minnesota Court of Appeals upheld the issuance of the anti-suit injunction. On Mar. 14, 2006, the Minnesota Supreme Court denied NSP-Wisconsin’s petition for review of the anti-suit injunction. Trial in the Minnesota action is scheduled to commence on Nov. 6, 2006. The January 2007 trial in the Wisconsin action has been adjourned and has not been rescheduled.

 

On Jan. 10, 2006, NSP-Wisconsin, entered into a confidential settlement agreement with St. Paul Mercury Insurance Company, St. Paul Fire and Marine Insurance Company and The Phoenix Insurance Company (“St. Paul Companies”), and the St. Paul Companies have been dismissed from the Minnesota and Wisconsin actions. The settlement with the St. Paul Companies is not expected to have a material effect on Xcel Energy.

 

NSP-Wisconsin has reached settlements in principle with Admiral Insurance Company, Associated Electric & Gas Insurance Services Limited, Compagnie Europeene D’Assurances Industrielles S.A. and Allstate Insurance Co.. These settlements will not have a material effect on Xcel Energy’s financial results.

 

On Feb. 10, 2006, NSP-Wisconsin filed with the Minnesota court a renewed motion for dismissal under the doctrine of forum non conveniens and a motion for dissolution of the anti-suit injunction. These motions were based upon the changed circumstances resulting from the dismissal of the St. Paul Companies. The St. Paul Companies were the only Minnesota-based insurers and provided what the trial court viewed as a pivotal Minnesota connection supporting its issuance of the anti-suit injunction and denial of NSP-Wisconsin’s February 2004 motion to dismiss under the doctrine of forum non conveniens. The court heard arguments on these motions April 21, 2006 and has taken the motions under advisement. The court extended its stay of the anti-suit injunction while these motions are under advisement.

 

The PSCW has established a deferral process whereby clean-up costs associated with the remediation of former MGP sites are deferred and, if approved by the PSCW, recovered from ratepayers. Carrying charges associated with these clean-up costs are not subject to the deferral process and are not recoverable from ratepayers. Any insurance proceeds received by NSP-Wisconsin will operate as a credit to ratepayers, therefore, these lawsuits should not have a material effect on Xcel Energy’s financial results.

 

Cornerstone Propane Partners, L.P. et al. vs. e prime inc. et al. On Feb. 2, 2004, a purported class action complaint was filed in the U.S. District Court for the Southern District of New York against e prime and three other defendants by Cornerstone Propane Partners, L.P., Robert Calle Gracey and Dominick Viola on behalf of a class who purchased or sold one or more New York Mercantile Exchange natural gas futures and/or options contracts during the period from Jan. 1, 2000, to Dec. 31, 2002. The complaint alleges that defendants manipulated the price of natural gas futures and options and/or the price of natural gas underlying those contracts in violation of the Commodities Exchange Act. In February 2004, plaintiffs requested that this action be consolidated with a similar suit involving Reliant Energy Services. In February 2004, defendants, including e prime, filed motions to dismiss. In September 2004, the U.S. District Court denied the motions to dismiss. On Jan. 25, 2005, plaintiffs filed a motion for class certification, which defendants opposed. On Sept. 30, 2005, the U.S. District Court granted plaintiffs’ motion for class certification. On Oct. 17, 2005, defendants filed a petition with the U.S. Court of Appeals for the Second Circuit challenging the class certification. On Dec. 5, 2005, e prime reached a tentative settlement with the plaintiffs. The settlement agreement received preliminary court approval in early March, 2006. The settlement has been paid by e prime and it did not have a material financial impact on Xcel Energy.

 

31



 

This excerpt taken from the XEL DEF 14A filed Apr 5, 2006.
Legal Proceedings

Beginning in July 2002, several lawsuits purporting to be class actions on behalf of certain purchasers of the Company’s common stock were filed in the U.S. District Court for the District of Minnesota. The lawsuits, which were consolidated, alleged violations of Section 10(b) of the 1934 Act and Rule 10b-5 thereunder relating to allegedly false and misleading disclosures concerning, among other things, “round trip” energy trades and the nature, extent and seriousness of liquidity and credit difficulties at NRG. The complaints named Xcel Energy; Wayne H. Brunetti, former chairman and chief executive officer; Edward J. McIntyre, former vice president and chief financial officer; former chairman James J. Howard; Gary R. Johnson, general counsel, and Richard C. Kelly, then president of Xcel Energy Enterprises, as defendants.

In August 2002, a shareholder derivative action was filed in the U.S. District Court for the District of Minnesota, purportedly on behalf of Xcel Energy, against the directors and certain present and former officers, citing allegedly false and misleading disclosures and asserting breach of fiduciary duty.

In September and October 2002, two essentially identical actions were filed in the U.S. District Court for the District of Colorado, purportedly on behalf of classes of employee participants in the Company’s and its predecessors’ 401(k) or employee stock ownership plans. The complaints alleged violations of the Employee Retirement Income Security Act of 1974 (ERISA) in the form of breach of fiduciary duty in allowing or encouraging the purchase, contribution and/or retention of the Company’s common stock in the plans. The complaints named as defendants Xcel Energy, its directors, certain former directors and certain former officers.

On April 1, 2005, the U.S. District Court for the District of Minnesota approved a settlement agreement relating to all of these lawsuits. Under the terms of the settlement of the securities and ERISA claims, the Company’s insurance carriers agreed to pay $70.5 million and the Company paid $17.5 million. Settlement of the derivative lawsuit involved the Company’s adoption of certain corporate governance measures and payment of plaintiff’s attorney’s fees and expenses, of which the Company paid $125,000. The settlements included no admission of liability by the Company or any individual defendant.

31




The Company is obligated to indemnify its officers and directors under certain circumstances to the fullest extent permitted by Minnesota law. As part of that obligation, the Company has advanced and will continue to advance certain attorneys’ fees and expenses incurred by officers and directors in various litigation, including the litigation described above. In connection with the derivative proceedings described above, for the period July 31, 2002 through March 31, 2003, the period April 1, 2003 through March 31, 2004, the period April 1, 2004 through March 31, 2005, and the period April 1, 2005 through March 1, 2006, the Company has advanced expenses of approximately $22,000, $56,000, $107,000 and less than $5,000, respectively, to the law firm of Jones Day on behalf of the Company’s directors and Mr. Edward J. McIntyre, former vice president and chief financial officer, approximately $15,000, $7,000, $3,000 and less than $1,000, respectively, to the law firm of Briggs and Morgan on behalf of the Company’s directors and Mr. Edward J. McIntyre, former vice president and chief financial officer and approximately $8,000, $7,000, $4,000 and less than $1,000, respectively, to the law firm of Rider Bennett on behalf of Mr. James J. Howard, former chairman.

32




This excerpt taken from the XEL 10-K filed Feb 27, 2006.
Item 3 — Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy in addition to the regulatory matters discussed in Item 1. Management, after consultation with legal counsel, has recorded an estimate of the probable cost of settlement or other disposition for such matters.

 

Legal Contingencies

 

Nuclear Waste Disposal Litigation — The federal government has the responsibility to dispose of domestic spent nuclear fuel and other high-level radioactive substances. The Nuclear Waste Policy Act (the Act) requires the DOE to implement this disposal program. This includes the siting, licensing, construction and operation of a permanent repository for domestically produced spent nuclear fuel from civilian nuclear power reactors and other high-level radioactive substances.   The Act and contracts between DOE and domestic utilities obligated DOE to begin to dispose of these materials by Jan. 31, 1998.  The federal government has designated the site as Yucca Mountain in Nevada. The nuclear waste disposal program has resulted in extensive litigation.

 

On June 8, 1998, NSP-Minnesota filed a complaint in the U.S. Court of Federal Claims against the United States requesting  breach of contract damages in excess of $1 billion for the DOE’s failure to meet the 1998 deadline.  NSP-Minnesota has demanded damages consisting of the added costs of storage of spent nuclear fuel at the Prairie Island and Monticello nuclear generating plants, costs related to the Private Fuel Storage, LLC and certain costs relating to the 1994 and 2003 state legislation relating to the storage of spent nuclear fuel at Prairie Island.  On July 31, 2001, the Court granted NSP-Minnesota’s motion for partial summary judgment on liability.  The Court has set the start of the trial on Oct. 23, 2006.

 

On July 9, 2004, the U.S. Court of Appeals for the District of Columbia Circuit issued a decision in consolidated cases challenging regulations and decisions on the federal nuclear waste program. The Court of Appeals rejected challenges by the state of Nevada and other intervenors with respect to most of the NRC’s challenged repository licensing regulations, the congressional resolution approving Yucca Mountain as the site of the permanent repository, and the DOE and presidential actions leading to the approval of the Yucca Mountain site. The Court of Appeals vacated the 10,000 year compliance period adopted by EPA regulations governing spent nuclear fuel disposal at Yucca Mountain and incorporated in the NRC regulations. Xcel Energy has not ascertained the impact of the decision on its nuclear operations and storage of spent nuclear fuel; however, the decision may result in additional delay and uncertainty around disposal of spent nuclear fuel.

 

Lamb County Electric Cooperative (SPS) — On July 24, 1995, LCEC petitioned the PUCT for a cease and desist order against SPS alleging that SPS was unlawfully providing service to oil field customers in LCEC’s certificated area.  On May 23, 2003, the PUCT issued an order denying LCEC’s petition based on its determination that SPS was granted a certificate in 1976 to serve the disputed customers.  LCEC appealed the decision to the District Court in Travis County, Texas and on Aug. 12, 2004, the District Court affirmed the decision of the PUCT.  On Sept. 9, 2004, LCEC appealed the District Court’s decision to the Court of Appeals for the Third Supreme Judicial District of the state of Texas, which appeal is currently pending.  Oral arguments in the case were heard March 23, 2005.  SPS is awaiting the Court of Appeals decision.

 

On Oct. 18, 1996, LCEC filed a suit for damages against SPS in the District Court in Lamb County, Texas, based on the same facts alleged in the petition for a cease and desist order at the PUCT. This suit has been dormant since it was filed, awaiting a final determination at the PUCT of the legality of SPS providing electric service to the disputed customers.  The PUCT order of May 23, 2003, found that SPS was legally serving the disputed customers, thus collaterally determining the issue of liability contrary to LCEC’s position in the suit.  An adverse ruling on the appeal of May 23, 2003 PUCT order could result in a re-determination of the legality of SPS’ service to the disputed customers.

 

Manufactured Gas Plant Insurance Coverage Litigation (NSP-Wisconsin) In October 2003, NSP-Wisconsin initiated discussions with its insurers regarding the availability of insurance coverage for costs associated with the remediation of four former MGP sites located in Ashland, Chippewa Falls, Eau Claire, and LaCrosse, Wis. In lieu of participating in discussions, on Oct. 28, 2003, two of NSP-Wisconsin’s insurers, St. Paul Fire & Marine Insurance Co. and St. Paul Mercury Insurance Co., commenced litigation against NSP-Wisconsin in Minnesota state district court. On Nov. 12, 2003, NSP-Wisconsin commenced suit in Wisconsin state circuit court against St. Paul Fire & Marine Insurance Co. and its other insurers. Subsequently, the Wisconsin court denied the insurers’ motion to stay the Wisconsin case pending resolution of the Minnesota action.  On Jan. 6, 2005, the Minnesota court issued an injunction prohibiting NSP-Wisconsin from prosecuting the Wisconsin action.  On Dec. 27, 2005, the Minnesota Court of Appeals upheld the issuance of the anti-suit injunction.  On January 26, 2006, NSP-Wisconsin submitted for filing its petition for review with the Minnesota Supreme Court.  On January 13, 2006, the Minnesota trial court extended its stay of the anti-suit injunction until February 28, 2006, or until the Minnesota Supreme Court denies NSP-Wisconsin’s petition for review, whichever occurs first.  If the petition for review is accepted

 

48



 

after February 28, 2006, the parties may seek leave to re-instate the stay.  Trial in the Minnesota action is scheduled to commence on November 6, 2006.  A status conference in the Wisconsin action is scheduled for February 23, 2006.  Trial in the Wisconsin action is scheduled to begin in January 2007.

 

On January 10, 2006, NSP-Wisconsin, entered into a confidential settlement agreement with St. Paul Mercury Insurance Company, St. Paul Fire and Marine Insurance Company and The Phoenix Insurance Company (“St. Paul Companies”), and the St. Paul Companies have been dismissed from the Minnesota and Wisconsin actions.   The settlement with the St. Paul Companies will not have a material effect on NSP-Wisconsin shareholders.

 

On Feb. 10, 2006, NSP-Wisconsin filed with the Minnesota court a renewed motion for dismissal under the doctrine of forum non conveniens and a motion for dissolution of the anti-suit injunction.  These motions were based upon the changed circumstances resulting from the dismissal of the St. Paul Companies.  The St. Paul Companies were the only Minnesota-based insurers and provided what the trial court viewed as a pivotal Minnesota connection supporting its issuance of the anti-suit injunction and denial of NSP-Wisconsin’s February 2004 motion to dismiss under the doctrine of forum non conveniens.  These motions are currently set for hearing on March 13, 2006.     

 

The PSCW has established a deferral process whereby clean-up costs associated with the remediation of former MGP sites are deferred and, if approved by the PSCW, recovered from ratepayers. Carrying charges associated with these clean-up costs are not subject to the deferral process and are not recoverable from ratepayers. Any insurance proceeds received by NSP-Wisconsin will operate as a credit to ratepayers, therefore, these lawsuits should not have an impact on shareholders, and no accruals have been made.

 

Hill et al. vs. PSCo et al. - In October 2003, there were two wildfires in Colorado, one in Boulder County and the other in Douglas County.  There was no loss of life, but there was property damage associated with these fires. Parties have asserted that trees falling into Xcel Energy distribution lines may have caused one or both fires.  On Jan. 14, 2004, an action against PSCo relating to the fire in Boulder County was filed in Boulder County District Court. There are now 46 plaintiffs, including individuals and insurance companies, and three co-defendants, including PSCo.  The plaintiffs asserted damages in excess of $35 million.  In June 2005, PSCo reached a confidential settlement with all parties, as well as the United States Forest Service and the Denver Public Schools, settling claims in connection with the fire in Boulder County.  The financial impact of the settlement was not material to Xcel Energy.

 

SchlumbergerSema, Inc. vs. Xcel Energy Inc. (NSP-Minnesota) - Under a 1996 data services agreement, as amended, SchlumbergerSema, Inc. (SLB) provided automated meter reading, distribution automation and other data services to NSP-Minnesota. In September 2002, NSP-Minnesota issued written notice that SLB committed events of default under the agreement, including SLB’s nonpayment of approximately $7.4 million for distribution automation assets. In November 2002, SLB demanded arbitration and asserted various claims against NSP-Minnesota totaling approximately $24 million for alleged breach of an expansion contract and a meter purchasing contract. In the arbitration, NSP-Minnesota asserted counterclaims against SLB, including those related to SLB’s failure to meet performance criteria, improper billing, failure to pay for use of NSP-Minnesota owned property and failure to pay $7.4 million for NSP-Minnesota distribution automation assets, for total claims of approximately $41 million. NSP-Minnesota also sought a declaratory judgment from the arbitrators that would terminate SLB’s rights under the data services agreement. In August 2004, the U.S. Bankruptcy Court for the District of Delaware ruled that claims related to use of certain equipment are barred unless NSP-Minnesota can establish a basis for the claims in SLB’s conduct subsequent to the time of the assumption of this contract by SLB in May 2000.  In June 2005, the U.S. Bankruptcy Court ruled that NSP-Minnesota is barred from asserting any claim or defense against SLB that is based, in whole or in part, on any pre-May 2000 act or omission, including, but not limited to, any act or omission resulting in design or performance defects, by Cellnet Data Systems Inc., the party with which NSP-Minnesota originally contracted and from which SLB assumed the relevant agreements, which act or omission could have been a basis for NSP-Minnesota to assert a breach of contract against Cellnet Data Systems Inc.  On Oct. 31, 2005, the parties submitted this dispute to mediation, and reached a confidential settlement that did not have a material financial impact on Xcel Energy.

 

Additional Information

 

For more discussion of legal claims and environmental proceedings, see Note 14 to the Consolidated Financial Statements under Item 8, incorporated by reference. For a discussion of proceedings involving utility rates and other regulatory matters, see Pending and Recently Concluded Regulatory Proceedings under Item 1, and Management’s Discussion and Analysis under Item 7, incorporated by reference.

 

This excerpt taken from the XEL 10-Q filed Oct 28, 2005.
Item 1. Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. Management, after consultation with legal counsel, has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 4 and 5 of the consolidated financial statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are hereby incorporated by reference. Reference also is made to Item 3 of Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2004 and Note 16 of the consolidated financial statements in such Form 10-K for a description of certain legal proceedings presently pending. Except as discussed in Notes 4 and 5 herein, there are no new significant cases to report against Xcel Energy, and there have been no notable changes in the previously reported proceedings.

 

This excerpt taken from the XEL 10-Q filed Jul 29, 2005.
Item 1. Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy. Management, after consultation with legal counsel, has recorded an estimate of the probable cost of settlement or other disposition for such matters. See Notes 4 and 5 of the consolidated financial statements in this Quarterly Report on Form 10-Q for further discussion of legal proceedings, including Regulatory Matters and Commitments and Contingent Liabilities, which are

 

40



 

hereby incorporated by reference. Reference also is made to Item 3 of Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2004 and Note 16 of the consolidated financial statements in such Form 10-K for a description of certain legal proceedings presently pending. Except as discussed in Notes 4 and 5 herein, there are no new significant cases to report against Xcel Energy, and there have been no notable changes in the previously reported proceedings.

 

This excerpt taken from the XEL DEF 14A filed Apr 11, 2005.

Legal Proceedings

On July 31, 2002, a lawsuit purporting to be a class action on behalf of purchasers of Xcel Energy’s common stock between January 31, 2001 and July 26, 2002, was filed in the U.S. District Court for the District of Minnesota. The complaint named Xcel Energy; Wayne H. Brunetti, chairman and chief executive officer; Edward J. McIntyre, former vice president and chief financial officer; and former chairman James J. Howard as defendants. Among other things, the complaint alleged violations of Section 10(b) of the 1934 Act and Rule 10b-5 related to allegedly false and misleading disclosures concerning various issues including but not limited to “round trip” energy trades; the nature, extent and seriousness of liquidity and credit difficulties at NRG; and the existence of cross-default provisions (with NRG credit agreements) in certain of Xcel Energy’s credit agreements. After filing the lawsuit, several additional lawsuits were filed with similar allegations, one of which added claims on behalf of a purported class of purchasers of two series of senior notes issued by NRG in January 2001. The cases were all consolidated, and a consolidated amended complaint was filed. The amended complaint charged false and misleading disclosures concerning “round trip” energy trades and the existence of provisions in Xcel Energy’s credit agreements for cross-defaults in the event of a

41




default by NRG in one or more of NRG’s credit agreements; it added as additional defendants Gary R. Johnson, general counsel; Richard C. Kelly, then president of Xcel Energy Enterprises; two former executive officers and one current executive officer of NRG, David H. Peterson, Leonard A. Bluhm, and William T. Pieper; and a former independent director of NRG, Luella G. Goldberg; and it added claims of false and misleading disclosures, also regarding “round trip” trades and the cross-default provisions, as well as the extent to which the “fortunes” of NRG were tied to Xcel Energy, especially in the event of a buyback of NRG’s publicly owned shares under Section 11 of the Securities Act of 1933, as amended, with respect to issuance of the senior notes by NRG. The amended complaint sought compensatory and rescissionary damages, interest and an award of fees and expenses. On September 30, 2003, in response to the defendants’ motion to dismiss, the court issued an order dismissing the claims brought by purchasers of the NRG senior notes against defendants James Howard, Gary R. Johnson, Richard C. Kelly, David H. Peterson, Leonard A. Bluhm, William T. Pieper and Luella Goldberg. The court, however, denied the motion related to claims brought by Xcel Energy shareholders against Xcel Energy, James J. Howard, Wayne H. Brunetti and Edward J. McIntyre. Subsequently, following a pre-trial conference in December 2003, this matter was ordered to be ready for trial by February 1, 2006.

On August 15, 2002, a shareholder derivative action was filed in the U.S. District Court for the District of Minnesota, purportedly on behalf of Xcel Energy, against the directors and certain present and former officers, citing essentially the same circumstances as the securities class actions described immediately preceding and asserting breach of fiduciary duty. This action was consolidated for pre-trial purposes with the securities class actions and an amended complaint was filed. After the filing of this action, two additional derivative actions were filed in the state trial court for Hennepin County, Minnesota, against essentially the same defendants, focusing on allegedly wrongful energy trading activities and asserting breach of fiduciary duty for failure to establish adequate accounting controls, abuse of control and gross mismanagement. Considered collectively, the complaints sought compensatory damages, a return of compensation received, and awards of fees and expenses. In each of the cases, the defendants filed motions to dismiss the complaint or amended complaint for failure to make a proper pre-suit demand, or in the federal court case, to make any pre-suit demand at all, upon Xcel Energy’s board of directors. In January 2004, the state district court judge granted the defendants’ motion to dismiss both of the state court actions. In March 2004, plaintiffs filed notices of appeal related to this decision. In April 2004, plaintiffs withdrew their appeals. On July 12, 2004, the federal district court issued an order granting the defendants’ motion to dismiss the federal derivative lawsuit. Plaintiffs in the federal derivative lawsuit appealed the federal court’s dismissal.

On September 23, 2002, and October 9, 2002, two essentially identical actions were filed in the U.S. District Court for the District of Colorado, purportedly on behalf of classes of employee participants in Xcel Energy’s and its predecessors’ 401(k) or employee stock ownership plans, from as early as September 23, 1999, forward. The complaints in the actions named as defendants Xcel Energy, its directors, certain former directors, James J. Howard and Giannantonio Ferrari, and certain present and former officers, Edward J. McIntyre and David E. Ripka. The complaints alleged violations of the Employee Retirement Income Security Act in the form of breach of fiduciary duty in allowing or encouraging purchase, contribution and/or retention of Xcel Energy’s common stock in the plans and making misleading statements and omissions in that regard. The complaints sought injunctive relief, restitution, disgorgement and other remedial relief, interest and an award of fees and expenses. The defendants filed motions to dismiss the complaints. On March 10, 2004, the defendants’ motions to dismiss were granted in part and denied in part. Upon motion of defendants, the cases were transferred to the District of Minnesota for purposes of coordination with the securities class actions and shareholders derivative action pending there.

On January 14, 2005, the Company entered into a settlement agreement relating to all three of these lawsuits. Under terms of the settlements of the securities and ERISA claims, the Company’s

42




insurance carriers have agreed to pay $70.5 million and the Company will pay $17.5 million. Settlement of the derivative lawsuit involves the Company’s adoption of certain corporate governance measures and payment of plaintiff’s attorneys’ fees and expenses, of which the Company will pay up to a maximum of $125,000.

The securities settlement is dependent upon successful completion of both other settlements, and all three are subject to various conditions, including final approval by the U.S. District Court following notice and hearing. There are no guarantees that the conditions will be met, including that the final court approval will be obtained. The settlements include no admission of liability by the Company or any individual defendants.

The Company is obligated to indemnify its officers and directors under certain circumstances to the fullest extent permitted by Minnesota law. As part of that obligation, the Company has advanced and will continue to advance certain attorneys’ fees and expenses incurred by officers and directors in various litigation, including the litigation described above. In connection with the derivative proceedings described above, for the period July 31, 2002 through March 31, 2003, the period April 1, 2003 through March 31, 2004, and the period April 1, 2004 through March 1, 2005, the Company has advanced expenses of approximately $22,000, $56,000 and $107,000, respectively, to the law firm of Jones Day on behalf of the Company’s directors and Mr. Edward J. McIntyre, former vice president and chief financial officer, approximately $15,000, $7,000 and $3,000, respectively, to the law firm of Briggs and Morgan on behalf of the Company’s directors and Mr. Edward J. McIntyre, former vice president and chief financial officer and approximately $8,000, $7,000 and $4,000, respectively, to the law firm of Rider Bennett on behalf of Mr. James J. Howard, former chairman.

43




— Legal Proceedings

 

In the normal course of business, various lawsuits and claims have arisen against Xcel Energy in addition to the regulatory matters discussed in Item 1. Management, after consultation with legal counsel, has recorded an estimate of the probable cost of settlement or other disposition for such matters.

 

Wikinvest © 2006, 2007, 2008, 2009, 2010, 2011, 2012. Use of this site is subject to express Terms of Service, Privacy Policy, and Disclaimer. By continuing past this page, you agree to abide by these terms. Any information provided by Wikinvest, including but not limited to company data, competitors, business analysis, market share, sales revenues and other operating metrics, earnings call analysis, conference call transcripts, industry information, or price targets should not be construed as research, trading tips or recommendations, or investment advice and is provided with no warrants as to its accuracy. Stock market data, including US and International equity symbols, stock quotes, share prices, earnings ratios, and other fundamental data is provided by data partners. Stock market quotes delayed at least 15 minutes for NASDAQ, 20 mins for NYSE and AMEX. Market data by Xignite. See data providers for more details. Company names, products, services and branding cited herein may be trademarks or registered trademarks of their respective owners. The use of trademarks or service marks of another is not a representation that the other is affiliated with, sponsors, is sponsored by, endorses, or is endorsed by Wikinvest.